Support
Local Plan 2015-2030 Preferred Options for Consultation
Representation ID: 863
Received: 26/09/2013
Respondent: Environment Agency
Representation Summary:
We are supportive of this policy, which requires "all development to meet on and off-site infrastructure requirements" and paragraph 3.78 in the justification of this policy indicates that foul water sewerage is included under the term 'Infrastructure'. However, we recommend that reference is made to the Water Framework Directive in the supporting justification text to ensure that it is taken into account and can be used to justify protection or enhancement of the water environment, where possible.
Full text:
See attached