Support

Local Plan 2015-2030 Preferred Options for Consultation

Representation ID: 879

Received: 26/09/2013

Respondent: Anglian Water

Representation Summary:

We support the strategic objective SO2 and would want to see policy to ensure necessary infrastructure to serve allocations is planned (and in place) before development proceeds (and dwellings occupied) and to follow on from this we would at planning consent stage request the use of appropriate conditions to ensure infrastructure is in place before development is connected to the public system.

Full text:

See attached

Attachments: