Comment

Community Infrastructure Levy Draft Charging Schedule - Regulation 16

Representation ID: 30920

Received: 03/11/2022

Respondent: Hallam Land Management Ltd (HLM)

Agent: Mr Reiss Sadler

Representation Summary:

It is recommended that the CIL Charging Schedule includes a mechanism to review CIL in line with the progression of the Brentwood Local Plan Review, which is required to be submitted for Examination by July 2024, to include consideration of the CIL rate for any allocated strategic sites to ensure they can be delivered appropriately. If the draft CIL Charging Schedule is not reviewed in an appropriate timeframe, it could render strategic and other allocations in the Brentwood Local Plan Review unviable.

Full text:

It is recommended that the CIL Charging Schedule includes a mechanism to review CIL in line with the progression of the Brentwood Local Plan Review, which is required to be submitted for Examination by July 2024, to include consideration of the CIL rate for any allocated strategic sites to ensure they can be delivered appropriately. If the draft CIL Charging Schedule is not reviewed in an appropriate timeframe, it could render strategic and other allocations in the Brentwood Local Plan Review unviable.