Object
Local Plan 2015-2030 Preferred Options for Consultation
Representation ID: 1551
Received: 01/10/2013
Respondent: D. Lessons
Representation Summary:
a) The Brentwood Borough Plan with regard to West Horndon clearly has fundamental shortcomings. It does not, therefore, meet the criteria of being either "sound" or "robust".
b) There was no explanation of how this current Borough Plan was achieved, and why it should differ so dramatically from the one that was presented two years ago. The current plan fails the "soundness test" set out in NPPF, paragraph 182.
c. This plan cannot be said to respond to local needs without a further, in depth study of West Horndon, taking into account infrastructure.
Full text:
See attached