Brentwood Community Infrastructure Levy Preliminary Draft Charging Schedule
Ended on the 8 December 2016
Statement of Statutory Compliance
This Community Infrastructure Levy (CIL) Preliminary Draft Charging Schedule has been approved and published in accordance with the Community Infrastructure Levy Regulations 2010 (as amended 2011, 2012, 2013 and 2014) and Part 11 of the Planning Act 2008 (as amended by Part 6 of the Localism Act 2011).
In setting the levy rates, Brentwood Borough Council considers it has struck an appropriate balance between:
- The desirability of funding from CIL in whole or in part the actual and estimated total cost of infrastructure required to support the development of its area, taking into account other actual and expected sources of funding; and
- The potential effects, taken as a whole, of the imposition of CIL on the economic viability of development across the Brentwood Borough.
This Preliminary Draft Charging Schedule was approved for consultation on 19 October 2016
For instructions on how to use the system and make comments, please see our help guide.