Local Plan 2015-2030 Preferred Options for Consultation
Search representations
Results for Anglian Water search
New searchComment
Local Plan 2015-2030 Preferred Options for Consultation
Policy DM23 Housing Land Allocations - Major Sites
Representation ID: 876
Received: 26/09/2013
Respondent: Anglian Water
Comments provided on each proposed site allocation on attached RAG spread sheet.
Comments provided for when sewers cross sites, in which case the site layout should be designed to take this into account. Appropriate locations and process suggested in attached response.
Comments on surface water disposal measures and inclusion of SUDS.
See attached
Support
Local Plan 2015-2030 Preferred Options for Consultation
Policy DM35: Flood Risk
Representation ID: 877
Received: 26/09/2013
Respondent: Anglian Water
We are particularly supportive of Policies DM35: Flood Risk, DM36: Sustainable Drainage.
See attached
Support
Local Plan 2015-2030 Preferred Options for Consultation
Policy DM36: Sustainable Drainage
Representation ID: 878
Received: 26/09/2013
Respondent: Anglian Water
We are particularly supportive of Policies DM35: Flood Risk, DM36: Sustainable Drainage.
See attached
Support
Local Plan 2015-2030 Preferred Options for Consultation
Strategic Objectives
Representation ID: 879
Received: 26/09/2013
Respondent: Anglian Water
We support the strategic objective SO2 and would want to see policy to ensure necessary infrastructure to serve allocations is planned (and in place) before development proceeds (and dwellings occupied) and to follow on from this we would at planning consent stage request the use of appropriate conditions to ensure infrastructure is in place before development is connected to the public system.
See attached
Comment
Local Plan 2015-2030 Preferred Options for Consultation
Policy CP14: Sustainable Construction and Energy
Representation ID: 880
Received: 26/09/2013
Respondent: Anglian Water
In regard to Policy CP14 (b) Anglian Water would suggest sustainable drainage should be applied on every development to its maximum potential and would therefore amend the policy so that the section ("particularly in critical drainage areas") is removed.
See attached
Support
Local Plan 2015-2030 Preferred Options for Consultation
Policy CP17: Provision of Infrastructure and Community Facilities
Representation ID: 881
Received: 26/09/2013
Respondent: Anglian Water
Support this policy stipulating "..will require all new development to meet on and off site infrastructure requirements necessary to support development proposals and mitigate their impacts".
See attached
Comment
Local Plan 2015-2030 Preferred Options for Consultation
3.78
Representation ID: 883
Received: 26/09/2013
Respondent: Anglian Water
Funding of infrastructure, foul wastewater infrastructure requirements would be dependent on development location, size and phasing. All sites will require local connection to the existing network (may include upgrades). Local connections and sewer reinforcements would be funded by developers through provisions of the Water Industry Act (1991). The statutory undertaker is responsible for any necessary upgrades to Sewage Treatment Works.
Infrastructure funding will be managed within the Act and will not be required to form part of CIL. Surface water management is managed in accordance with Building Regs part H and NPPF Technical Guidance (may require CIL or s106 contributions).
See attached
Comment
Local Plan 2015-2030 Preferred Options for Consultation
1 Land north of Highwood Close, Brentwood (001A) - (20 dwellings)
Representation ID: 3347
Received: 26/09/2013
Respondent: Anglian Water
Comments provided on each proposed site allocation on attached RAG spread sheet.
Comments provided for when sewers cross sites, in which case the site layout should be designed to take this into account. Appropriate locations and process suggested in attached response.
Comments on surface water disposal measures and inclusion of SUDS.
See attached
Comment
Local Plan 2015-2030 Preferred Options for Consultation
2 Wates Way Industrial Estate, Ongar Road, Brentwood (003) - (128 dwellings)
Representation ID: 3348
Received: 26/09/2013
Respondent: Anglian Water
Comments provided on each proposed site allocation on attached RAG spread sheet.
Comments provided for when sewers cross sites, in which case the site layout should be designed to take this into account. Appropriate locations and process suggested in attached response.
Comments on surface water disposal measures and inclusion of SUDS.
See attached
Comment
Local Plan 2015-2030 Preferred Options for Consultation
3 Essex County Fire Brigade HQ, Rayleigh Road, Brentwood (005) - (101 dwellings)
Representation ID: 3349
Received: 26/09/2013
Respondent: Anglian Water
Comments provided on each proposed site allocation on attached RAG spread sheet.
Comments provided for when sewers cross sites, in which case the site layout should be designed to take this into account. Appropriate locations and process suggested in attached response.
Comments on surface water disposal measures and inclusion of SUDS.
See attached