Object

Strategic Growth Options

Representation ID: 4463

Received: 15/02/2015

Respondent: Mr and Mrs Colin and Linda Matthew

Representation Summary:

The Villages could not cope with an increase in population without a massive improvement in infrastructure.
The Following would a substantial upgrade:-
Roads, Sewage, Water, Electricity, Access to Doctors, School Places, Public Transport.

Full text:

The Villages could not cope with an increase in population without a massive improvement in infrastructure. In our own village of Kelvedon Hatch, the roads are already very congested and parking is a real issue. This is especially evident in School road where access and parking for the School is very congested and dangerous.

The Sewer system is overloaded, and has had many problems, including flooding homes with raw sewage on more than one occasion, and couldn't cope with extra waste. A new sewer would have to be installed.

The electricity supply (overhead to some houses) is not good, water pressure is low and both would need to be upgraded if any new homes are proposed.

The area would also require better access to Doctors (already over 2 weeks to get an appointment), better Public Transport, and more school places.