Comment
Strategic Growth Options
Representation ID: 4352
Received: 13/02/2015
Respondent: Mr Richard Romang
The existing infrastructure would need to be improved dramatically for the A127 proposal at West Hornden. The village has the same restrictions as the villages in the north catchment except that a rail link is present. You could argue that the villages in the northern sector are served by the A414.
The A12 option would make more sense due to the existing infrastructure and services, the availability of brownfield sites and the proposed expansion of the rail links due to crossrail.
The existing infrastructure would need to be improved dramatically for the A127 proposal at West Hornden. The village has the same restrictions as the villages in the north catchment except that a rail link is present. You could argue that the villages in the northern sector are served by the A414.
The A12 option would make more sense due to the existing infrastructure and services, the availability of brownfield sites and the proposed expansion of the rail links due to crossrail.