Support

Strategic Growth Options

Representation ID: 4339

Received: 13/02/2015

Respondent: J. Littlechild

Representation Summary:

Given the level of projected housing need with the Borough, sustainable development requires Brentwood Borough Council to consider all available and suitable sites across the rest of the Borough. Tha A12 Corridor has the ability to meet a significant portion of the BBC's increased housing needs, and suitable sites should be included in any spatial strategy.

Full text:

Given the level of projected housing need with the Borough, sustainable development requires Brentwood Borough Council to consider all available and suitable sites across the rest of the Borough. Tha A12 Corridor has the ability to meet a significant portion of the BBC's increased housing needs, and suitable sites should be included in any spatial strategy.