Strategic Growth Options
Representation ID: 3980
Received: 11/02/2015
Respondent: S. Mitchell
Representation Summary:
Road and rail infrastructure in the A127 Corridor is already at (and during the rush hour well over) capacity.
Flood risk is not addressed for any of the sites. It is clearly a major problem in the A127 Corridor and needs to be
fully assessed before any development decision can be made.
Full text:
Road and rail infrastructure in the A127 Corridor is already at (and during the rush hour well over) capacity.
Flood risk is not addressed for any of the sites. It is clearly a major problem in the A127 Corridor and needs to be
fully assessed before any development decision can be made.