Road and rail infrastructure in the A127 Corridor is already at (and during the rush hour well over) capacity.
Flood risk is not addressed for any of the sites. It is clearly a major problem in the A127 Corridor and needs to be
fully assessed before any development decision can be made.

Full text:

Road and rail infrastructure in the A127 Corridor is already at (and during the rush hour well over) capacity.
Flood risk is not addressed for any of the sites. It is clearly a major problem in the A127 Corridor and needs to be
fully assessed before any development decision can be made.