Object
Strategic Growth Options
Representation ID: 3769
Received: 05/02/2015
Respondent: mr frank thomas
Representation Summary:
There is poor, or no, access to the already over-busy A12 in much of this area. The A128 at Brentwood already has a serious traffic congestion problem. A large development would need a major road improvement scheme over a long distance if the largest, south-most, area of land was used.
Full text:
There is poor, or no, access to the already over-busy A12 in much of this area. The A128 at Brentwood already has a serious traffic congestion problem. A large development would need a major road improvement scheme over a long distance if the largest, south-most, area of land was used.