Object

Schedule of Potential Main Modifications

Representation ID: 30415

Received: 03/12/2021

Respondent: Ms Patricia Taylor

Legally compliant? Not specified

Sound? No

Representation Summary:

Contradicts with MM14C. The sewerage system for Blackmore is over-capacity, this was not considered before R25 and R26 were allocated. Any considerable development within the village, as proposed, would only add to the existing flood risk and drainage problems. The source of the River Wid is just North of Blackmore and regularly floods Red Rose Lane, which has become impassable on 10 occasions over the period Dec-Feb 2021. No mitigation measures could cope and to use this lane as an access point is unsustainable. It is narrow, unlit and without pathways and not a suitable route for emergency vehicles.

Full text:

See attached.