Object

Schedule of Potential Main Modifications

Representation ID: 29986

Received: 27/11/2021

Respondent: Mrs Ruth Dimond

Legally compliant? Not specified

Sound? No

Representation Summary:

Sites R25 and R26 should be taken out of the LDP until the issues raised above can be properly considered. A coherent plan for the villages in the north of the borough should be considered to ensure planned sustainable transport.
Flood risk could therefore be assessed before the planning permission stage.
There can be a more in depth, longer lasting review of the Green Belt in the borough. There needs to be a proper housing needs assessment of all the villages, as part of any strategic plan.
If the next LDP is constructed properly and strategically, when the impact of development should be reviewed taking into account impact on poor infrastructure and transport links, as exist in Blackmore village. There is no clear strategy in the current LDP to mitigate this.

Full text:

See attached representation

Attachments: