Object

Schedule of Potential Main Modifications

Representation ID: 29629

Received: 08/11/2021

Respondent: Essex County Council

Legally compliant? Yes

Sound? No

Representation Summary:

2. Not Justified
3. Not Effective

ECC as highway and transportation authority notes that a comprehensive and deliverable package of sustainable transportation interventions is required to reduce Local Plan impacts and a number of options are set out in the Transport Assessment (2021). Further consideration of the most effective measures can be achieved as part of a sustainable transport strategy, developed in consultation with ECC as Highway Authority for BBC and other relevant statutory consultees and stakeholders.

Paragraph 5.131 needs to be amended to reflect this position.

This reaffirms ECC position as set out its Hearing Statement F76A.

Full text:

2. Not Justified
3. Not Effective

ECC as highway and transportation authority notes that a comprehensive and deliverable package of sustainable transportation interventions is required to reduce Local Plan impacts and a number of options are set out in the Transport Assessment (2021). Further consideration of the most effective measures can be achieved as part of a sustainable transport strategy, developed in consultation with ECC as Highway Authority for BBC and other relevant statutory consultees and stakeholders.

Paragraph 5.131 needs to be amended to reflect this position.

This reaffirms ECC position as set out its Hearing Statement F76A.