Object
Schedule of Potential Main Modifications
Representation ID: 29499
Received: 03/11/2021
Respondent: Mr Richard Thwaite
Legally compliant? No
Sound? No
R25 is not suitable due to flood risk, sewage issues, build on greenbelt land, put pressure on primary school, put pressure on doctors, cause traffic and parking problems and make local roads dangerous. It contradicts Brentwood own strategic planning objectives as the site is nowhere near the growth areas.
R25 is not suitable as site for 40 houses as it will:
1) Create an additional flood risk to the village and it's historic Grade I listed Church and Tower
2) Put further pressure on a sewerage system that is already at maximum capacity and overflows into the water courses
3) Build on greenbelt land that is an ecologically important area for the village
4) Put further pressure on the local primary school that is already overcapacity
5) Put further pressure on the local GP that is already over capacity
6) Add a significant number of vehicles (minimum 2 per house = 80 vehicles) and associated traffic into the village and the surrounding roads causing parking problems and real danger to the pedestrians that use the local roads with no pavement such as Red Rose Lane.
This site is not anywhere near the primary growth areas for Brentwood, and as such it makes no sense for it to be included in the LDP based upon the Councils own strategic objectives.