Object
Schedule of Potential Main Modifications
Representation ID: 29452
Received: 14/10/2021
Respondent: Mr Ronald Hayns
Legally compliant? No
Sound? No
I object as with even 45 houses the impact on priests will be to make it a total deadlock.
At present at prime times of day 7/9 AM 4/6 PM it can take 30 minutes to get from St. Andrews to the traffic lights
Engines pumping pollutants to dangerous levels
The lane is very narrow in places not complying to Essex design guide with respect to road and pavement width.
I object as with even 45 houses the impact on priests will be to make it a total deadlock.
At present at prime times of day 7/9 AM 4/6 PM it can take 30 minutes to get from St. Andrews to the traffic lights
Engines pumping pollutants to dangerous levels
The lane is very narrow in places not complying to Essex design guide with respect to road and pavement width.