Representation Summary:

The number is arbirtrary. No consideration has been taken about the impact this would have on the traffic that is already on a lane and not a main road. This is leading not only to traffic congestion and increased pollution down the road but also to safety of pedestrians including school children during the rush hours. If there were to be an emergency - it is would be impossible to negotiate these roads at that time. I have been told that the road and pavement width do not comply with the Essex design guide.

Full text:

The number is arbirtrary. No consideration has been taken about the impact this would have on the traffic that is already on a lane and not a main road. This is leading not only to traffic congestion and increased pollution down the road but also to safety of pedestrians including school children during the rush hours. If there were to be an emergency - it is would be impossible to negotiate these roads at that time. I do think that we need to support development but not at any cost. Priests lane is now literally under siege and we cannot even leave our premises to go about our work or get to work during these times. I have been told that the road and pavement width do not comply with the Essex design guide.