Object
Local Plan 2015-2030 Preferred Options for Consultation
Representation ID: 231
Received: 29/09/2013
Respondent: Basildon Borough Council
Representation Summary:
Appendix 3 identifies Brentwood Borough's housing trajectory. The housing trajectory includes sites that have built from 2012. The plan period for the Brentwood Local Plan is stated as being 2015-2030, therefore Basildon Borough Council would question why the Plan is relying on the delivery of sites from outside the plan period (2012-2014) to help meet the delivery of 3,500 dwellings that are supposed to be delivered within it.
Full text:
See attachment