Comment
Preferred Site Allocations 2018
Representation ID: 20065
Received: 12/03/2018
Respondent: London Borough of Havering
Representation Summary:
The narrative for each of the allocations including that for Brentwood Enterprise Park should explain how the transport implications of the proposals will be addressed. The narrative should also reflect that the existing junction is likely to be remodelled if the Lower Thames Crossing proposal proceeds. This will be particularly important for Brentwood Enterprise Park given the scale of the development proposed and the likely impact on the adjoining highway network particularly the A127 trunk road because this enters Havering and intersects with the A12 trunk road at the Gallows Corner intersection.
Full text:
See attached.