Comment

Preferred Site Allocations 2018

Representation ID: 20041

Received: 05/03/2018

Respondent: National Highways

Representation Summary:

The access and egress arrangements to this site are also potentially challenging and it is recommended that the proposals for these are discussed with Highways England to provide reassurance that safe and acceptable operation can be achieved at an early stage.

Full text:

See attached.

Attachments: