Comment
Preferred Site Allocations 2018
Representation ID: 20037
Received: 05/03/2018
Respondent: National Highways
Representation Summary:
It is noted that some development sites are located in close proximity to the M25 and A12 corridors and therefore consider that these could potentially have a notable impact on the number of trips at the junctions.
Full text:
See attached.