Comment
Preferred Site Allocations 2018
Representation ID: 19910
Received: 26/03/2018
Respondent: Environment Agency
Representation Summary:
The preferred site allocations referenced 263, 276 & 200 may require a permit for
work within 8 metres of a defence structure/culvert. We would however, prefer that
any works around a main river must allow space for maintenance of our assets. This
would also provide multiple benefits including an ecological buffer strip and corridors
Full text:
See attached.