Object

Preferred Site Allocations 2018

Representation ID: 19628

Received: 11/03/2018

Respondent: Mr Paul David Jackson

Representation Summary:

1. The size of the development is not in keeping with the size of the village.
2. The number of vehicles that the proposed development could generate is not appropriate for the local lanes.
3. The proposed development would overload the existing services, such as the local school.
4. Construction traffic would cause a danger on the local roads.
5. Orchard Piece development proposal too dense.

Full text:

Site 076, 077
1. The size of the development is not in keeping with the size of the village.
2. The number of vehicles that the proposed development could generate is not appropriate for the local lanes.
3. The proposed development would overload the existing services, such as the local school.
4. Construction traffic would cause a danger on the local roads.
5. Orchard Piece development proposal too dense.

Attachments: