Object
Preferred Site Allocations 2018
Representation ID: 18726
Received: 12/03/2018
Respondent: Mr David A.W. Llewellyn
Representation Summary:
The site is greenbelt and should remain as such. Large number of constrains including: Major Accident Hazard, Pipeline, pylons, wind turbine, high flood-risk, highest ranked Greenbelt value, historic environment zone, close proximity to a SSSI, wildlife connectivity corridor, listed buildings, poor road access, insufficient infrastructure and services, high level of pollution, and high volume of flight traffic and associated fuel dumping on / around site area.
Full text:
See Attached