Comment
Preferred Site Allocations 2018
Representation ID: 17990
Received: 28/02/2018
Respondent: Mr Dean Taylor
Representation Summary:
If this is to go ahead wil consideration be made to the regular flooding which takes place in this part of the village. This development is likely to reduce drainage of surface water and be at risk of flooding.
Full text:
If this is to go ahead wil consideration be made to the regular flooding which takes place in this part of the village. This development is likely to reduce drainage of surface water and be at risk of flooding.