Object

Local Plan 2015-2030 Preferred Options for Consultation

Representation ID: 1766

Received: 28/09/2013

Respondent: Kate Sibbald

Representation Summary:

Why West Horndon has been singled out for 'significant and future growth'?

The Infrastructure in West Horndon is at capacity and won't be able to cope with this increase in residents. We cannot get a train into Brentwood directly and the A128 is already over loaded with traffic. Secondary school children have no choice but to attend schools across Brentwood. The local Primary is already at full capacity, it takes 3 working days to get a doctors appointment

Concerns about the loss of employment for those on the industrial estate.

The loss of Greenbelt in the village will be significant

Full text:

see attachment

Attachments: