Object
Draft Local Plan
Representation ID: 16170
Received: 16/05/2016
Respondent: Countryside Properties
Agent: Andrew Martin Planning Ltd
Appendix 1 to the report of OM provides a critique of the modelling work by PBA. This finds fundamental issues with the depth of the work carried out, the data presented and conclusions drawn from that data. Critically the work has not been reviewed by the Highways Authority, Essex County Council and Highways England. The methodology used is not clear and the modelling tool is unreliable. For example it does not appear to take account of existing and proposed major development including infrastructure. It lacks depth and serious technical analysis. No real conclusions on the various strategic options for growth can be drawn from it.
See attached