Representation Summary:

As a minimum, consultation is required on the scope of the SA and the SA report accompanying the Draft Plan. It is best practice for consultation to take place on SA during the plan preparation process for example through the production of interim SA Report and other means such as workshops and working groups.
The testing of the options and reasonable alternatives within the SA is required, however the evidence base is not complete nor up to date.
The land to the east of West Horndon performs better in the SA than the proposed Dunton Hills Garden Village.