Comment
Draft Local Plan
Representation ID: 15783
Received: 11/05/2016
Respondent: National Highways
Representation Summary:
Junction capacity assessments of the Strategic Road Network have not been presented within the Modelling Report, despite experiencing significant increases in trips at the junction as a result of development. It is recommended these are undertaken to determine the predicted operation of the junctions following LP development and to determine what measures may be required to mitigate the impact. Consideration may also need to be given to undertaking merge/diverge assessments at various locations to determine whether changes are required to support the LP development.
Full text:
See attached