Object

Draft Local Plan

Representation ID: 15403

Received: 05/05/2016

Respondent: Croudace Strategic Ltd

Agent: Barton Willmore

Representation Summary:

It is noted that (as of yet) BBC has not undertaken a Green Belt Review of the Borough. A Borough-wide Green Belt review is necessary for "exceptional circumstances" to be 'Justified' and ultimately for the Plan to be found "sound".

It is therefore necessary that BBC undertake a full review of the Borough's Green Belt in order for the approach to be deemed comprehensive and fair, and to also satisfy themselves (and an Inspector) that the Green Belt is capable of enduring for the Plan period.

Full text:

See attached.

Attachments: