Object

Draft Local Plan

Representation ID: 14637

Received: 20/04/2016

Respondent: Mr Kevin Mate

Representation Summary:

With regards to infrastructure, it was noted that the consultation ignored the A128 which is the key link between the A127 Corridor and Brentwood. Additionally, concentrated development within the A127 Corridor would simply exacerbate expected further strain on the Shoeburyness to Fenchurch Street rail line, with authorities all the way up this line expected to build extensively around it.

Full text:

See attached

Attachments: