Object

Draft Local Plan

Representation ID: 13473

Received: 20/03/2016

Respondent: Dr Philip Gibbs

Representation Summary:

[Dunton Hills Garden Village is a critical drainage area. Removal of trees and other vegetation will reduce the ability of the area to absorb rainfall. Most of the surface water will be drained towards the South and West via the Mardyke tributary and into the Mardyke. Development will multiply the amount of water entering an area that is already the scene of many past floods. Mitigation will require an extensive system of flood defences and pumping stations at enormous cost. The cost and uncertainty over the ability to control the flood risk makes thid development unacceptable in its own right.] Please read the full objection as the details are important and it is no longer than necessary.

Full text:

Flood Risk
Development of Dunton Hills and West Horndon will pose a very high risk of flooding especially through its onward effect on the Mardyke River.
The Environment Agency flood map shows that the location for the development of Dunton Hills Garden Village is at a high risk of surface water flooding in several areas. It is a critical drainage area. This means that it presently absorbs large amounts of water including water that runs off from surrounding areas. Removal of trees and other vegetation will reduce the ability of the area to absorb rainfall. Rain that falls on roof tops and road surfaces will be quickly channelled through surface drains needed to prevent flooding in the new development area.
The altitude of the land is mostly around 40m. The A127 presents a barrier to drainage systems because it is at a lower altitude of about 20m. Therefore most of the surface water will have to be drained towards the South and West via the Mardyke tributary and into the Mardyke itself.
It will be necessary to take into account events of extreme rainfall when up to 50mm can fall in a period of 24 hours. At times of persistent rain that are common during the winter in this area this could continue over periods of several days. Rain falling on 250 hectares of developed land will have to be managed via the drainage system. SuDS will not be sufficient to mitigate the risk to the wider area along the Mardyke. This could amount to 100,000 m3 of extra rain water in a day. It is estimated that the Mardyke River has a typical capacity of 50,000 m3 per day and is already prone to flooding causing inundations around West Horndon and Tilbury.
The development of the Dunton Hills area will thus multiply by a significantly factor the amount of water entering an area that is already the scene of many past floods. Mitigation will require an extensive system of flood defences and pumping stations at enormous cost. This will have to be done before building starts and will require agreements between Thurrock and Essex that are likely to be difficult to reach agreement on. There is a danger therefore that development will go ahead without any new flood defences and nothing will be done until the first major flooding event has already happened.
In my opinion the cost and uncertainty over the ability to control the flood risk makes the Dunton Hills Garden Village development unacceptable in its own right.