Comment

Strategic Growth Options

Representation ID: 11851

Received: 12/02/2015

Respondent: Mrs M Craddock

Representation Summary:

An holistic infrastructure Plan must be delivered to ensure development is undertaken in a sustainable manner.

Full text:

Q1: Yes. The character of the areas is completely different.

Q2: No. A127 at full capacity - widening could cause massive problems for local residents. Flooding, already a recurring problem, does not seem to have been addressed. Open fenland, with its wildlife and beauty, is greatly valued by residents of West Horndon.

Q3: Site 200 [Entire Land East of A128, south of A127] massively preferred to 037 [A/B/C - Land West of Thorndon Avenue, West Horndon], 038 [A/B - Land East of Thorndon Avenue, West Horndon], and 126 [Land East of West Horndon, South of Station Road].
Brownfield sites should be used for future building before exploiting greenfield sites.
New, appropriate infrastructure should be carefully planned before any building takes place.
My concern is that West Horndon will no longer be a village, its character treasured by local residents.

Q4: Site 200 has the greater potential to afford future benefit for the village of West Horndon.
Development unsuitable in sites 037 A,B,C [Land West of Thorndon Avenue, West Horndon] and 038 A,B [Land East of Thorndon Avenue, West Horndon] which are prone to becoming water logged - please refer to paragraph 100 of the National Planning Policy Framework.

Q5: Yes. Sustainable development in the Borough of Brentwood should be sought in all areas of the Borough, and especially along the A12 Corridor, to address the projected level of housing needs.

Q6: Brownfield sites are preferable for development of housing. Greenfield sites should only be used when distinct levels of benefit to the existing area are proved.

Q7: Yes. Employment opportunities are a must, and accessible by road, rail and public transport (including buses).

Q8: Yes.

Q9: Not sure.

Q10: Scenic Beauty Attractiveness: 4
Outdoor Recreation / Leisure Use: 3
Wildlife Interest: 5
Historic Interest: 4
Tranquility: 5
Other - Flooding Prevention: 5

Q11: Houses: 3
Commercial / Industrial Buildings: 3
Nature Reserves / Wildlife: 3
Farmland: 4
Woodland: 2
Degraded / Derelict / Waste Land: 1
Infrastructure: 2
Leisure / Recreation Facilities: 2

Q12: Yes. Travel links to surrounding areas/communities.

Q13: An holistic infrastructure Plan must be delivered to ensure development is undertaken in a sustainable manner.

Attachments: