102 William Hunter Way car park, Brentwood

Representation ID: 20089

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

Infrastructure at the wastewater treatment works in this area is unlikely to be able to support the demand anticipated from this development. Significant infrastructure upgrades are likely to be required to ensure sufficient treatment capacity is available to serve this development. Thames Water would welcome the opportunity to work closely with the Local Planning Authority and the developer to better understand and effectively plan for the sewage treatment infrastructure needs required to serve this development. It is important not to under estimate the time required to deliver necessary infrastructure.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

117A & 117B Ford Offices, Eagle Way, Warley, Brentwood

Representation ID: 20125

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

Infrastructure at the wastewater treatment works in this area is unlikely to be able to support the demand anticipated from this development. Significant infrastructure upgrades are likely to be required to ensure sufficient treatment capacity is available to serve this development. Thames Water would welcome the opportunity to work closely with the Local Planning Authority and developer to better understand and effectively plan for the sewage treatment infrastructure needs required to serve this development. It's important not to under estimate the time required to deliver necessary infrastructure. We would expect that a holistic drainage strategy will be prepared for site.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

194 Brizes Corner Field, Blackmore Road, Kelvedon Hatch

Representation ID: 20126

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

On the information available to date we do not envisage infrastructure concerns regarding wastewater infrastructure capability in relation to this site. Drainage hierarchy to be followed in addressing surface water. Please note that the above comments relate to the sewerage network within the Thames Water supply area only. It is recommended that Anglian Water are also consulted for their comments in relation to this development proposal.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

294 Chestnut Field, Backmore Road, Hook End

Representation ID: 20127

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

Drainage hierarchy to be followed in addressing surface water. Please note that the above comments relate to the sewerage network within the Thames Water supply area only. It is recommended that Anglian Water are also consulted for their comments in relation to this development proposal.

Full text:

See attached.