Preferred Site Allocations 2018

Search representations

Results for Thames Water search

New search New search

Comment

Preferred Site Allocations 2018

027 Land adjacent to Carmel, Mascalls Lane, Warley

Representation ID: 20079

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

We do not envisage network infrastructure concerns regarding wastewater infrastructure capability in relation to this site on a basis that it won't be any surface water connection into a public foul sewer system. Connection of surface water into a public foul sewer system reduces sewer capacity and has the potential to cause flooding to existing customers. Drainage hierarchy to be followed in addressing surface water.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

032 Land east of Nags Head Lane, Brentwood

Representation ID: 20080

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

Infrastructure at the wastewater treatment works in this area is unlikely to be able to support the demand anticipated from this development. Significant infrastructure upgrades are likely to be required to ensure sufficient treatment capacity is available to serve this development. Thames Water would welcome the opportunity to work closely with the Local Planning Authority and the developer to better understand and effectively plan for the sewage treatment infrastructure needs required to serve this development. It is important not to under estimate the time required to deliver necessary infrastructure.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

039 Westbury Road Car Park, Westbury Road, Brentwood

Representation ID: 20081

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

Infrastructure at the wastewater treatment works in this area is unlikely to be able to support the demand anticipated from this development. Significant infrastructure upgrades are likely to be required to ensure sufficient treatment capacity is available to serve this development. Thames Water would welcome the opportunity to work closely with the Local Planning Authority and the developer to better understand and effectively plan for the sewage treatment infrastructure needs required to serve this development. It is important not to under estimate the time required to deliver necessary infrastructure.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

040 Chatham Way / Crown Street Car Park, Brentwood

Representation ID: 20082

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

Infrastructure at the wastewater treatment works in this area is unlikely to be able to support the demand anticipated from this development. Significant infrastructure upgrades are likely to be required to ensure sufficient treatment capacity is available to serve this development. Thames Water would welcome the opportunity to work closely with the Local Planning Authority and the developer to better understand and effectively plan for the sewage treatment infrastructure needs required to serve this development. It is important not to under estimate the time required to deliver necessary infrastructure.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

041 Land at Hunter House, Brentwood, Brentwood

Representation ID: 20083

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

Infrastructure at the wastewater treatment works in this area is unlikely to be able to support the demand anticipated from this development. Significant infrastructure upgrades are likely to be required to ensure sufficient treatment capacity is available to serve this development. Thames Water would welcome the opportunity to work closely with the Local Planning Authority and the developer to better understand and effectively plan for the sewage treatment infrastructure needs required to serve this development. It is important not to under estimate the time required to deliver necessary infrastructure.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

044 & 178 Land at Priests Lane, Shenfield

Representation ID: 20084

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

On the information available to date we do not envisage infrastructure concerns regarding wastewater infrastructure capability in relation to this site. Please note that the above comments relate to the sewerage network within the Thames Water supply area only. It is recommended that Anglian Water are also consulted for their comments in relation to this development proposal. Drainage hierarchy to be followed in addressing surface water.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

075B Land off Stocks Lane, Kelvedon Hatch

Representation ID: 20085

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

On the information available to date we do not envisage infrastructure concerns regarding wastewater infrastructure capability in relation to this site. Drainage hierarchy to be followed in addressing surface water. Please note that the above comments relate to the sewerage network within the Thames Water supply area only. It is recommended that Anglian Water are also consulted for their comments in relation to this development proposal.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

081 Council Depot, The Drive Warley

Representation ID: 20086

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

Infrastructure at the wastewater treatment works in this area is unlikely to be able to support the demand anticipated from this development. Significant infrastructure upgrades are likely to be required to ensure sufficient treatment capacity is available to serve this development. Thames Water would welcome the opportunity to work closely with the Local Planning Authority and the developer to better understand and effectively plan for the sewage treatment infrastructure needs required to serve this development. It is important not to under estimate the time required to deliver necessary infrastructure.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

083 Land west of Warley Hill, Pastoral Way, Warley

Representation ID: 20087

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

Infrastructure at the wastewater treatment works in this area is unlikely to be able to support the demand anticipated from this development. Significant infrastructure upgrades are likely to be required to ensure sufficient treatment capacity is available to serve this development. Thames Water would welcome the opportunity to work closely with the Local Planning Authority and the developer to better understand and effectively plan for the sewage treatment infrastructure needs required to serve this development. It is important not to under estimate the time required to deliver necessary infrastructure.

Full text:

See attached.

Comment

Preferred Site Allocations 2018

085B Land adjacent to Tipps Cross Community Hall, Blackmore Road, Tipps Cross

Representation ID: 20088

Received: 12/03/2018

Respondent: Thames Water

Representation Summary:

On the information available to date we do not envisage infrastructure concerns regarding wastewater infrastructure capability in relation to this site. Please note that the above comments relate to the sewerage network within the Thames Water supply area only. The outfall sewer that the Thames Water network connects to is within the Anglian Water supply area and flows to Anglian Water's High Roding Sewage Treatment Works. It is therefore recommended that Anglian Water are also consulted for their comments in relation to this development proposal.

Full text:

See attached.

For instructions on how to use the system and make comments, please see our help guide.