Draft Local Plan

Search representations

Results for Barwood Land and Estates Ltd search

New search New search

Support

Draft Local Plan

022 Land at Honeypot Lane, Brentwood

Representation ID: 15898

Received: 12/05/2016

Respondent: Barwood Land and Estates Ltd

Agent: Chilmark Consulting Limited

Representation Summary:

Support the inclusion of Land at Honeypot Lane because the site is:
- readily deliverable now and can therefore contribute to the five-year housing land supply
- close proximity between jobs, homes and open spaces
- accessible by public transport, on foot and by bicycle
- offers a development opportunity that will support and reflect the distinctive character of Brentwood and the contribution of the wider Green Belt to Brentwood's quality of life, biodiversity and environment
- opportunity to refine and re-align the Green Belt boundary.

Full text:

See attached.

Attachments:

Support

Draft Local Plan

Appendix 2 - Proposed Housing Delivery

Representation ID: 16318

Received: 12/05/2016

Respondent: Barwood Land and Estates Ltd

Agent: Chilmark Consulting Limited

Representation Summary:

Support the inclusion of Land at Honeypot Lane.
Appendix 2 identifies Honeypot Lane as providing a total of 250 dwellings in the first five years of the plan period and BLEL welcomes this identification of the opportunity to deliver housing on the site early in the plan period.
BLEL suggests that there should be some flexibility to the housing delivery phasing shown in the Draft Local Plan at Appendix 2 and 3 given the need to achieve detailed planning permission for the site in 2017 in order to allow time for the first phase of development to be completed in 2018.

Full text:

See attached.

Attachments:

Support

Draft Local Plan

Appendix 3 - Housing Trajectory

Representation ID: 16319

Received: 12/05/2016

Respondent: Barwood Land and Estates Ltd

Agent: Chilmark Consulting Limited

Representation Summary:

Confirm the ability to bring forward new housing on the Honeypot Lane site in the five-year period.
BLEL suggests that there should be some flexibility to the housing delivery phasing shown in the Draft Local Plan at Appendix 2 and 3 given the need to achieve detailed planning permission for the site in 2017 in order to allow time for the first phase of development to be completed in 2018.

Full text:

See attached.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.