Object

Addendum of Focussed Changes to the Pre-Submission Local Plan (Regulation 19)

Policy R19: Land at Priests Lane, Shenfield (page 292)

Representation ID: 26767

Received: 26/11/2019

Respondent: Ursuline Sisters

Agent: JTS Partnership LLP

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Strongly object to the 5 proposed changes, particularly to R19 (change 3). The basis of this objection is that the proposed delivery of the housing, as set out within Appendix 1 of the Consultation Document is not achievable or viable, and that the Plan should be considered as unsound. Furthermore the reallocation of the 30 units from Policy R19 is not justified or supported by any evidence and ignores the evidence presented by the landowner.

In respect of the reduction in numbers at Policy R19 Land at Priests Lane, there is no justification or evidential support for such a reduction. The landowner has provided
Highways evidence to support much higher degrees of provision that will see the efficient use of land as required by the NPPF. Also highlighted are the many highway and pedestrian improvements that will enhance pedestrian accessibility and the wider highway network.
There is great uncertainty about the ability to deliver the full DHGV allocation within the Plan Period. With a significant reliance on that allocation to achieve the full Housing Supply, it is not sustainable to remove the provision delivery of achievable units from other
sites where such can be delivered in the early part of the Plan Period. The projected delivery of the DHGV allocation in terms of its commencement and the ongoing
delivery rate through the Plan Period is considered to be unrealistic and unviable. It relies on achieving the delivery of the first units within 2 to 3 years of the Adoption of the Local Plan and then delivering housing at a very high rate through the final 7 years of the Plan Period. While these targets may be achievable in the best case scenario, the NLP study supports the opinion that for large projects, delivery is likely to take a much greater
amount of time. The Council provide no evidence to support such lofty targets. These best case scenario projections should not be adopted as realistic delivery targets
through the Plan Period. Reallocating 70 units to the latter stages of the Housing Trajectory only increase the likelihood of a failure to meet the full housing supply through the Plan Period.