Addendum of Focussed Changes to the Pre-Submission Local Plan (Regulation 19)

Search representations

Results for Transport for London search

New search New search

Support

Addendum of Focussed Changes to the Pre-Submission Local Plan (Regulation 19)

Sustainability Appraisal

Representation ID: 26543

Received: 17/10/2019

Respondent: Transport for London

Representation Summary:

Thank you for consulting Transport for London (TfL). I can confirm that TfL has no comments to make on the focussed changes to the pre submission Local Plan.

Object

Addendum of Focussed Changes to the Pre-Submission Local Plan (Regulation 19)

Sustainability Appraisal

Representation ID: 26691

Received: 22/11/2019

Respondent: Transport for London

Legally compliant? Not specified

Sound? Not specified

Duty to co-operate? Not specified

Representation Summary:

In written representations dated 14th March 2019 (see attachment 2), we supported the principle of the Strategic Housing Allocation R10: Brentwood Railway Station Car Park, however we did not agree with the approximate capacity of 100 homes for the following reasons:
* This capacity was not in line with the content of the Draft Brentwood Town Centre Design Guide which identified that up to "405 units per hectare is suitable around key transport nodes, such as Brentwood Station."
* Brentwood Railway Station Car Park is a brownfield site, located within a town centre and adjacent to a significant transport interchange. It is, therefore, a prime opportunity to optimise housing delivery in a highly accessible location in line with National Planning Policy Framework (NPPF) paragraphs 103 and 118 (D).
* Feasibility studies indicated that a decked design could allow a greater density to be achieved on the site whilst still providing a compatible and neighbourly form of development.
* The draft site allocation boundary did not include a section of car park towards the east. The whole parcel of land which TfL has an interest in and for which we are exploring development feasibility measures 1.39ha.
we suggested that the indicative density was increased. A density of 405 units per hectare would better reflect the sites capacity; if this figure is applied to the site area of 1.39 hectares this would equate to around 560 homes. This is considered a more realistic housing figure for the site, to ensure that the site is fully optimised and the Addendum of Focussed Changes should be amended accordingly.