Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Search representations
Results for Essex County Council search
New searchObject
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Land adjacent to A12 and Slip Road, Ingatestone
Representation ID: 22508
Received: 19/03/2019
Respondent: Essex County Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
2. Justified.
3. Effective.
4. Consistent with National Policy.
Request additional paragraph after paragraph 9.229 to ensure factual representation of the current position in respect of flooding, in line with paragraphs 155 and 156 of the NPPF.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
POLICY E08: LAND ADJACENT TO A12 AND SLIP ROAD, INGATESTONE
Representation ID: 22510
Received: 18/03/2019
Respondent: Essex County Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
3. Effective.
Criterion B. a. of Policy E08 states that vehicular access should be via Roman Way
ECC have previously advised that vehicular access via Roman Road may not be able to meet highway standards, and that BBC need to provide the evidence to demonstrate that safe and suitable access(es), for all highway users, including pedestrians and cyclists can be achieved. This will need to be undertaken in consultation with ECC as the Highway Authority, and Highways England who control the A12 and its slip roads.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
9.227
Representation ID: 22511
Received: 18/03/2019
Respondent: Essex County Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
3. Effective.
Paragraph 9.227 makes reference to the main vehicular access for the site to be from Roman Road.
ECC have previously advised that vehicular access via Roman Road may not be able to meet highway standards, and that BBC need to provide the evidence to demonstrate that safe and suitable access(es), for all highway users, including pedestrians and cyclists can be achieved. This will need to be undertaken in consultation with ECC as the Highway Authority, and Highways England who control the A12 and its slip roads.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Residential-led Site Allocations
Representation ID: 22513
Received: 19/03/2019
Respondent: Essex County Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
3. Effective.
Within the site allocation proformas there is an inconsistency in the format between the employment and residential allocations (employment years 1-5 etc, residential
2012/22 - 2022/23).
It is recommended that one format is used.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Employment Site Allocations
Representation ID: 22514
Received: 19/03/2019
Respondent: Essex County Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
3. Effective.
Within the site allocation proformas there is an inconsistency in the format between the employment and residential allocations (employment years 1-5 etc, residential
2012/22 - 2022/23).
It is recommended that one format is used.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
E11 - Brentwood Enterprise Park
Representation ID: 22515
Received: 18/03/2019
Respondent: Essex County Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
2. Justified
3. Effective
Access is stated as being M25 Junction 29 and/or Warley street (B186).
Currently unclear how access to site can be achieved directly from J29 of M25 as consequence of Lower Thames Crossing improvements to this junction,which includes segregated left turn slip road from the A127 to M25 southbound.BBC therefore need to demonstrate that suitable access arrangements for all modes of travel can be achieved, including appropriate mitigation/improvements. BBC should also demonstrate what discussions have taken place with Highways England, ECC as Highway Authority, and the site promoter to ensure that access arrangements are deliverable and agreed.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Table 1: Monitoring Framework. Broad parameters for monitoring policy implementation
Representation ID: 22516
Received: 18/03/2019
Respondent: Essex County Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Chapter 8 Natural Environment NE01.
3. Effective.
Additional monitoring point required.