Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Search representations
Results for Countryside Properties search
New searchObject
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Sustainability Appraisal
Representation ID: 24069
Received: 19/03/2019
Respondent: Countryside Properties
Agent: Strutt & Parker LLP
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
The SA Report is simplistic in its approach to individual site assessment. It has used a predominantly spatial or 'GIS' approach to the assessment of each criteria, and no consideration for the positive contribution that the development of sites can make to the natural environment and local facilities. The assumption made within the Sustainability Appraisal that sites will only negatively impact the Green Belt and other landscape and natural environment designations has contributed to the unjustified omission of sites from allocation, such as site 030A.
1. Introduction
1.1 These representations are submitted by Strutt & Parker on behalf of Countryside Properties (UK) Ltd in relation to the Brentwood Borough Council Pre-Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our clients' land at 030A, Land at Bayley's Mead, Hutton, Brentwood. A plan showing the site is provided as Appendix A to this representation.
1.2 Countryside was founded in Essex 60 years ago by Alan Cherry and has since established a reputation for delivering high quality developments. With the ethos 'creating places people love', Countryside's achievements are exemplified through having won more Housing Design Awards than any other house builder.
1.3 Countryside is a major development and place-maker, having secured planning permission and building out developments in varying scales: from smaller 30 dwelling schemes on the edge of village's through to large urban extensions of 3,500 new homes plus associated community facilities. Countryside has a proven track record of delivery. The company is headquartered in Brentwood and has a proud legacy of local sites such as Clements Park and the Square on Hart Street.
1.4 As the Council will be aware, representations have previously been made on behalf of Countryside Properties and in respect of both sites 030A on the Preferred Options Consultation in October 2013 and the Strategic Growth Options Consultation February 2015, and the Regulation 18 Local Plan in March 2018.
1.5 Site 030A measures approximately 2.36 hectares. The Council have previously confirmed the net developable area of the site as 1.66 hectares, with the ability to provide an estimated 30 dwellings on site. The site is situated within the Green Belt.
1.6 Whilst the Plan is considered effective in meeting the minimum housing requirements through the proposed allocations, an unjustified lack of housing provision to exceed the minimum requirements, and to provide an appropriate buffer and flexibility for the future, does prevent the Plan from being considered sound as a whole.
1.7 Site 030A has been discounted as a site for residential development through the Local Plan process, for reasons which are considered in more detail later within this representation. We consider the rejection of the site to be unjustified, and to result in a PSLP which does not promote sustainable development and as such is unsound.
1.8 The allocation of the site, at Bayley's Mead, Hutton, for residential development would represent a sustainable and deliverable proposal to help meet housing need over the coming plan period and ensure the soundness of the Local Plan.
1.9 As a minimum, the site should be safeguarded for potential future release from the Green Belt to ensure that the Green Belt remains protected throughout the entire plan period, in accordance with Paragraph 139 of the NPPF.
1.10 This representation set out comments on the Regulation 19 Draft Local Plan, as well as providing detail on the sustainability and deliverability of the site with regards to technical considerations and latest assessment work.
2. Brentwood Local Plan Regulation 19 Consultation
Plan Period
2.1. The Draft Local Plan is proposed to guide development in the Borough of Brentwood until 2033. The National Planning Policy Framework (NPPF, 2019) makes clear at Paragraph 22 that strategic policies within Local Plans should look ahead over a minimum of 15 years.
2.2. At this stage it would be optimistic to assume that adoption of the Draft Plan, which forms the subject of this representation, will happen within 2019 and therefore the plan will only address development needs in the area for a maximum of 14 years.
2.3. This shortfall is particularly relevant in respect of Green Belt, whereby a failure to ensure that development needs are planned for over a sufficient period of time would likely result in an early review of Green Belt being required. This review ahead of a new Local Plan would be contrary to the NPPF (paragraph 136), and also undermine one of the two essential characteristics of the Green Belt: its permanence (NPPF, Paragraph 133).
Total Housing Requirement
2.4. Paragraph 4.13 of the PSLP states that the Borough's housing requirement is 350 dwellings per annum. Paragraph 4.12 confirms that this figure is calculated using the Standard Method (as per the NPPF and respective Planning Practice Guidance(PPG)). We note that the PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method (Paragraph: 004 Reference ID: 2a-004-20190220).
2.5. On this basis, the relevant subnational population projections indicate an average annual increase of 293.2 households in the Borough between 2019 and 2029. The latest (2017) ratio of median house price to median gross annual workplace-based earnings for the Borough published by the ONS is 11.23. Once the Standard Method is applied using these figures, the result is a requirement of 452 dwellings per annum.
2.6. The NPPF requires for Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change.
2.7. As mentioned previously, the Plan should also ensure that any revised Green Belt boundary should be robust enough to be maintained beyond the Plan period and therefore account for development needs beyond 2033 (or a revised later end date to the Plan period to ensure strategic policies will cover at least 15 years).
2.8. A further factor is the need to consider unmet needs of neighbouring authorities (NPPF paragraph 35). Councils have a duty to cooperate with one another on strategic matters, including on unmet housing needs (paragraphs 24 to 27 of the NPPF). The PSLP does not make an allowance for any unmet needs from neighbouring authorities.
2.9. Whilst the South Essex authorities are working together on a joint strategic plan, the Local Plans for each authority must still demonstrate joint working and a consideration of unmet needs where required. A number of nearby authorities have identified difficulties in meeting their own housing needs, including Castle Point, Rochford and Southend. We also not that Epping Forest District Council in particualr is at an advanced stage in the preparation of a Local Plan (at the time of writing it is currently being examined) which proposes to deliver 11,400 dwellings between 2011 and 2033 (518 dwellings per annum), against a requirement (based on the Standard Method) of 944 dwellings per annum.
2.10. Furthermore, the Borough is located within close proximity of London, with the emerging Local Plan identifying high housing delivery on outer London Boroughs and that London will fall short of meeting its housing needs by 10,000 homes over the next ten years. Unmet need from London could therefore be required to be met by nearby authorities, including Brentwood.
2.11. Whilst no authority has formally approached Brentwood in relation to unmet need, it is not inconceivable that an authority will do. Under the current PSLP there is no flexibility to meet any unmet needs from neighbouring authorities, requiring a plan review should a request to meet unmet needs be received once the plan is adopted.
2.12. Allocating additional sites would provide greater flexibility should a request to meet unmet needs be forthcoming, avoiding the need for an early plan review. This flexibility should also be provided in accordance with paragraph 11 of the NPPF and to accommodate additional need arising from extending the plan period.
2.13. The PSLP considers it appropriate to apply a 20% uplift to the identified housing target of 350 dwellings per annum, resulting in a proposed target of 456 dwellings per annum. The rationale for this buffer is unclear with separate references to the buffer advising that it allows for an additional housing land supply to be maintained, but also that it serves to safeguard against any potential uplift to the standard methodology for calculating housing need, pending the outcome of the Government's 'Technical consultation on updates to national planning policy and guidance'.
2.14. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility, Green Belt protection or unmet need from neighbouring authorities in addition to the minimum requirement. The plan is therefore considered ineffective in its current form and has not been positively prepared to provide an appropriate level of contingency in terms of housing delivery, or to comply with national planning policies. As such we consider the PSLP to be unsound.
2.15. As a minimum, we consider that the PSLP's housing need should be amended to at least ensure that an additional year's worth of housing need can be accommodated, and so that the relevant strategic policies of the Plan cover at 15 years from adoption. Realistically, we expect that an additional 2 years' worth of housing may be required to support a plan period up to 2035. Moreover, in respect of the fact that the authority is predominantly Green Belt, even if the plan period is extended until 2035, policies should account for potential development needs beyond this period. The allocation of sites for housing in Hutton, including that at Bayleys Mead, would provide for additional housing delivery in a sustainable location and help to ensure that the Plan can be found sound.
Five-year Housing Land Supply and Housing Trajectory
2.16. The Council is required to demonstrate a five-year housing land supply at any point in the plan period (Paragraph: 038 Reference ID: 3-038-20180913).
2.17. The NPPF (Paragraph 73) confirms that a 20% buffer should be applied to the initial calculation for a five year housing land supply requirement, in the event that the results of the Housing Delivery Test show that there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. From November 2018 significant under delivery indicates that delivery was below 85% of the requirement for the Borough. The PPG (Paragraph: 037 Reference ID: 3-037-20180913) also confirms that the requirement for a 20% buffer also applies where a Local Planning Authority are seeking to confirm their five-year housing land supply through a recently adopted Local Plan.
2.18. The results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years and this is therefore well below the threshold for the 20% buffer requirement.
2.19. The Borough's most recent reported five-year housing land supply (Five Year Housing Land Supply Statement as at 31 March 2018 (November 2018)) ('HLSS') is 4.1 years. This is predicated on a requirement which, when considered in relation to the latest guidance, understates need; and a supply which, again when considered in relation to latest guidance, overstates supply. As such, the actual housing land supply is considerably less.
2.20. Looking at this in detail, the HLSS considers an annual need of 343 dwellings, resulting in a total requirement once the 20% has been applied of 2,058 dwellings. However, applying the latest guidance and the Standard Method, the Borough's housing requirement is 452 dwellings per annum. Applying the 20% buffer, this results in a five-year requirement of 2,712 dwellings.
2.21. In terms of supply, the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years. As per the Glossary contained within Annex 2 of the NPPF, such sites cannot be considered deliverable for the purposes of the five-year housing land supply. Table 1 of the HLSS suggests that at least 1,042 dwellings in the reported supply did not have planning permission. Once these are removed from the supply calculation, the five-year supply comprises 653 dwellings. It is unclear if and how many of the dwellings categorised as having extant planning permission are on major sites which only benefit from outline permission. Such sites would also have to be discounted. As such, the figure of 653 dwellings may overstate housing supply.
2.22. A five-year supply of 653 dwellings compared to a requirement of 2,712 represents a 1.2-year housing land supply. This acute housing land supply shortage demonstrates the importance of allocating sites through the Local Plan which can be delivered early in the plan period, and support the existing supply of housing. It also emphasises the need to avoid over-reliance on large strategic sites which inevitably take longer to deliver.
2.23. The housing trajectory provided as Appendix 1 to the PSLP projects that it will enable completion of 2,305 dwellings between 2019/20 and 2023/24.
2.24. Having regard to the Standard Method and the need to apply a 20% buffer to the housing requirement, the total five-year requirement for the Borough is 2,712 dwellings. Therefore, even before critical review of the supply, the PSLP will not provide a five-year supply of housing.
2.25. Furthermore, Dunton Hills Garden Village is a proposed major strategic development, intended to provide 4,000 dwellings, 5.5 hectares of employment land, two new primary schools, secondary school, new village shopping centre, new transport infrastructure, and new community and health infrastructure. Delivery will require the coordination and input of multiple landowners, developers, infrastructure providers and other stakeholders.
2.26. Once allocated, the PSLP proposes a masterplan and design guidance will be required to be prepared. Following this, an outline application will need to be prepared, submitted, and determined; followed by reserved matters. It will also be necessary to discharge all planning conditions and S106 obligations.
2.27. As such, we question the likelihood of 100 homes being completed at Dunton Hills Garden Village as early as 2022/23. This does not in itself mean that Dunton Hills Garden Village proposals cannot form part of a sound Local Plan, but it does demonstrate the unsuitability of relying on large strategic sites for short term housing delivery, and means that additional smaller sites capable of providing homes in the early years of the plan period also need to be allocated in order to ensure the Local Plan is sound.
2.28. It is evident that whilst the Plan can demonstrate housing delivery appropriate to meet minimum recognised requirements, the suggested inability of the Plan to ensure a consistent five-year supply is inconsistent with national policy, which requires that local planning authorities should identify and update annually a supply of specific deliverable sites sufficient to provide a minimum of five years' worth of housing against their housing requirement set out in adopted strategic policies. The PSLP should therefore support this requirement through the allocation of smaller scale sites that can be delivered over short timescales to be found sound. Land at Bayleys Mead is a site that would cater to this need, with its deliverability discussed in greater detail later on in this representation.
Proposed Approach to Hutton
2.29. Within the PSLP, the Borough's settlement hierarchy identifies Hutton as Category 1 - an 'urban neighbourhood'. A Category 1 settlement is defined as having a wide range of services, and are typically highly accessible and well served by public transport provision. Hutton has an established local centre which benefits from a range of services, facilities, access to public transport, and employment opportunities.
2.30. The town is situated approximately 30km from Central London, 12km from Chelmsford and well-connected in respect of regional and national infrastructure. Brentwood and Shenfield are accessible along the A12 corridor.
2.31. Hutton is a highly sustainable location, and therefore well-placed to accommodate a proportion of the Borough's housing need. In addition, the Local Plan should manage growth of such settlements to sustain and enhance their vitality.
2.32. Irrespective of the above, the PSLP proposes no growth for Hutton, in contrast to the level of growth afforded to other settlements identified as Category 1 settlements, or also those below Hutton, within the Borough's settlement hierarchy. We have concerns therefore that the PSLP fails to support the sustainable growth of Hutton and that this omission is unjustified and inconsistent with national policy.
2.33. To ensure the soundness of the Local Plan, land should be allocated in Hutton to protect the future of this settlement and ensure sustainable growth.
Green Belt
2.34. A Green Belt Study (November 2018) supports the PSLP. This study provides an assessment of Green Belt parcels against the five purposes of the Green Belt, as set out within the NPPF.
2.35. The study includes an 'assessment of Housing Sites (being considered as part of the SHLAA) within the Green Belt and their relative contribution to the purposes of the Green Belt designation'.
2.36. The site has been assessed against the five purposes of the Green Belt, as part of the Green Belt Study methodology as follows:
Purpose 1: To check the unrestricted sprawl of large built up areas
Parcel 14 is defined by the Council as 'partly contained', and recognises that it abuts a large built up area. This categorisation does however advise that the boundary is 'weak/degraded/unclear'. The site 030A is contained on two out of four boundaries by built form however and on remaining boundaries by established vegetation and hedgerows that could be incorporated and enhanced as part of a landscaping scheme that would support the redevelopment of the site. We consider that the site boundaries are clearly defined and the site is therefore well-contained. A conclusion of containment should not consider built form exclusively.
Purpose 2: To prevent neighbouring towns from merging into one another
The site is adjacent the eastern limit of Hutton Mount and the Green Belt Study correctly recognises that its development would retain separation from neighbouring towns. The next settlement to the east is Billericay and this is some distance away with a large green gap between the two. Other parts of Hutton already extend closer to Billericay without posing any risk of merging.
Purpose 3: To assist in safeguarding the countryside from encroachment
The site is defined by the Council as 'Functional Countryside' (FC). The assessment defines Functional Countryside as "access land, public area (park), high number of PRoW and important routes e.g. National Trail'. The site itself is overgrown, in private ownership, covered in dense vegetation, and not suitable for public access. It is not agricultural and is therefore not functional and this assessment of the site is incorrect.
Purpose 4: To preserve the setting and special character of historic towns
Brentwood Borough Council have recognised that site 030A has no physical of visual relationship with the Historic Town. It is some distance from the town centre with no direct relationship. It is directly associated with contemporary housing developments at Bayley's Mead and surrounding roads, which present limited historic character.
Purpose 5: To assist in urban regeneration, by encouraging the recycling of derelict and other urban land
Brentwood Borough Council have not provided an analysis for Purpose 5.
2.37. Overall, Brentwood Borough Council have assessed the site as having a moderate overall contribution to the Green Belt, despite the favourable assessment of the site. Where the site was assessed to have an important role on the Green Belt, we have outlined above that these elements of the assessment are incorrect and not reflective of the sites true characteristics.
2.38. The development of this Green Belt site, which has limited environmental value and offers a minimal contribution to the Green Belt when assessed against its five intended purposes, would help to support housing delivery in a sustainable location in the Brentwood Borough, whilst protecting other Green Belt sites of much higher environmental value.
2.39. The weaknesses and inconsistencies recognised in the individual site assessments made demonstrate a potential flaw in the evidence base for the Local Plan and could result in the unjustified omission of Green Belt sites from consideration for allocation as part of the new Local Plan.
2.40. The above analysis of land at Bayleys Mead, Hutton demonstrates that there remains small scale opportunities for sustainable development within the Green Belt and that the Local Plan should give consideration to the allocation of such sites alongside larger scale areas of release.
Strategic Environmental Assessment/Sustainability Appraisal (SEA/SA)
2.41. The PSLP is supported by a range of technical work, including the Sustainability Appraisal (SA) January 2019. The SA presents a number of sustainability issues/objectives which have been established through SA scoping. Together, these sustainability topics and objectives provide a methodological framework for the appraisal of potential allocation sites - including site 030A.
2.42. The SA indicates that the allocation of site 030A would have positive effects in relation to the SA objectives. The SA analysis states that site 030A is in good proximity to a secondary school (less than 1.5km), but in 'red' proximity from a GP surgery and a primary school. Willowbrook Primary School is located within 1 mile of the site, which is considered to be within walking distance to the site. The nearest GP Surgery, Mount Avenue Surgery is located 1.5 miles from the site. Mount Avenue Surgery is defined in the Regulation 18 document to be 1 of 3 surgeries within the District which has an average of 0.58 GPs per 1,000 patients, which is the national average. Furthermore, Mount Avenue Surgery has a large catchment area, therefore it is considered that it would provide service to those living at the site. Furthermore, Brentwood Community Hospital is located less than 3 miles from the site.
2.43. The SA, through its analysis also states that the site at Bayley's Mead is in an area that 'performs poorly' in respect of its proximity to Ancient Woodland, Local Wildlife Site, Woodland and Green Belt. The proposed development of the site will not unacceptably impact on Ancient Woodland, Woodland or a Local Wildlife Site. This scoring is considered to be highly assumptive and rules out the potential of sites being landscaping led and providing opportunities for the enhancement such features and local biodiversity. Being within 400m of a local wildlife site does not necessarily mean that there will be direct impacts on the site.
2.44. In relation to Green Belt, the assessment is binary in it's approach - if a potential site falls within the defined Green Belt, it will be given an 'Amber' score. Whilst the methodology notes that the Green Belt is not specifically a landscape designation, and as such potential effects on the setting have not been appraised, a blanket 'amber' score on anything seems arbitrary.
2.45. A Green Belt Review of the Borough, and the contribution that each individual site makes to the Green Belt has been undertaken and this is discussed in more detail in the following section of this representation. This recognition of differing value across individual sites should have influenced scoring for this element of the SA, and replaced the non-conducive binary approach taken.
2.46. In general, we consider that the SA Report is simplistic in its approach to individual site assessment. The SA has used a predominantly spatial or 'GIS' (use of Geographical Information Systems) approach to the assessment of each criteria, using the distance between the site and various factors to judge the extent to which it either achieves or opposes certain objectives. It has had no consideration for the positive contribution that the development of sites can make to the natural environment and local facilities.
2.47. The assumption made within the Sustainability Appraisal that sites will only negatively impact the Green Belt and other landscape and natural environment designations has contributed to the unjustified omission of sites from allocation as part of the Local Plan which has subsequently resulted in the plan being unsound.
3. Site Deliverability
3.1. The site represents a deliverable, sustainable and achievable site for residential development. There have been technical reports and associated documents completed which demonstrate this. The below section provides a summary of these documents.
Access & Connectivity
3.2. The site is considered to have good access and connectivity to the surrounding area. The vehicular and pedestrian access to the site is proposed to be from Bayley's Mead. The access arrangement was considered as satisfactory through the 2013 Draft Site Assessment.
3.3. The site is approximately 1.3 miles from Shenfield Station (approximately a 25 minute walk / 8 minute cycle). Shenfield Station provides frequent services to London Liverpool Street, Chelmsford, Colchester and Ipswich and settlements between. These destinations also provide connections to the wider national transport network. Shenfield Station is also the terminus for the new Elizabeth Line which is part of Crossrail. Crossrail provides frequent services into Central London.
3.4. A public bus stop is located approximately 200m from the site. This bus stop provides frequent services to Basildon Town Centre, Brentwood High Street, Billericay and Shenfield Rail Station, amongst services to smaller neighbouring settlements.
3.5. The site is well connected to the surrounding road network. The site is located approximately 2.5 miles from the A12. The A12 provides efficient access to settlements across Essex and East Anglia such as Chelmsford, Colchester and Ipswich, as well as a direct connection to the M25.
3.6. The site is immediately adjacent St Martin's School, a large seconday school and sixth form. There are also a number of primary schools in the area, including Willowbrook Primary School and Hutton All Saints Primary School which are both less than a mile from the site.
3.7. Given the high access and connectivity levels of the site, it is evident that Site 030A is within a sustainable location and should therefore be considered as a site for residential development.
Ecology
3.8. An ecological appraisal was undertaken by Green Environmental Consultants Ltd. In September 2013.
3.9. The ecological appraisal states that the site is abandoned farmland which is being colonised by scrub and tree species from woody boundary habitats. There are mature trees, mostly on two of the boundaries which may be used by bats of nesting birds. Otherwise the potential of the site is poor.
3.10. The ecological appraisal recommends further bat survey work to be undertaken on site and for the mature boundary trees to be protected and enhanced.
3.11. The ecological appraisal concludes that there are no significant or major impacts on a significant resource to be expected through the development of the site, but recognises that loss of scrub and some trees is likely to occur. This could be easily mitigated and enhanced through a landscaping scheme to support any future development on the site.
Geo-Environmental/Engineering
3.12. A preliminary engineering appraisal was undertaken in February 2013. This appraisal includes details on foundations, highways, drainage and contamination.
3.13. The geo-environmental appraisal concludes that there are no significant physical geo-environmental constraints to development on the site.
Drainage
3.14. The preliminary engineering appraisal states that foul water from the proposed development would discharge to the existing pumping facility and thereafter to the sewer in Hanging Hill Lane.
3.15. The appraisal states that storm run-off from the developed site would discharge at the ditch.
3.16. The existing surface water catchment for the local residential area drains into a 600mm diameter pipe which discharges via a headwall into the western end of the northernmost ditch within the site. This ditch runs across the site and continues eastwards beyond. The Environment Agency map indicates that an interconnecting ditch system eventually outfalls to the River Can. The appraisal states that drainage storage is likely to be provided through the design of a sustainable urban drainage system which may include a combination of contributing elements, swales, ponds and underground cellular storage.
Contamination
3.17. The preliminary engineering appraisal states that an intrusive soil investigation will be required to confirm whether the soil on site is contaminated. The appraisal states that in view of the perceived history of the land, this is unlikely to be the case.
Highways
3.18. The preliminary engineering appraisal states that the current width of Bayley's Mead is 5.5m which could support a development of 30 dwellings.
3.19. The appraisal states that the sight line visibility from Bayley's Mead onto Hanging Hill Lane is about 2.4m x 65m to the right hand side with the 'y' distance being much greater to the left. The requirement for a 30mph road is 2.4 x 43m. Even if measured vehicle speeds in Hanging Hill Lane are greater, for example up to 37mph, then the visibility requirement for that speed (2.4 x 59m) is still achieved.
3.20. The appraisal concludes that there is no objective reason as to why the existing access road could not support the development of Site 030A.
4. Summary
4.1. Whilst the current proposed allocations and strategic policies of the PSLP appropriately address the minimum requirement of housing recognised for the Plan period, we have reason to query the appropriate length of the Plan period, and a lack of flexibility in the housing provision and such consider the Plan unsound due to its inability to comply with national planning policy, the unjustified omission of a housing supply which exceeds minimum requirements, and given that the Plan has not been positively prepared to account for potential changes to the market and housing requirements beyond those forecast.
4.2. There is evidently a case for Site 030A to be further considered as a sustainable opportunity in respect of Brentwood Borough Council needing to further increase their housing delivery over the plan period. The development of this site would not impact the function of the Green Belt in this location and is immediately adjacent to Hutton, a 'main town' with facilities and services that could support sustainable growth. Development here would also accord with the Brentwood Borough Council Spatial Strategy which directs growth towards the A12 transport corridor.
4.3. The analysis and content within the accompanying studies evidence the deliverability, achievability and suitability of the site for development and why it should therefore be allocated by Brentwood Borough Council as a site for residential development to aid the Plan in being sound. We consider there to be outstanding opportunities for the plan to identify sustainable sites that are suitable for delivering housing over short timescales to ensure that the Plan is flexible and robust, and well-prepared to meet housing needs over the entirety of the plan period.
4.4. Development of the site is supported by a wealth of technical evidence that confirms its suitability, including in relation to the lack of harm to its development to the purposes of the Green Belt. The reasons given for the rejection of the Site are therefore based on a number of assumptions and simplistic conclusions.
4.5. The exclusion of Site 030A is unjustified, and overlooks an opportunity to correct other soundness deficiencies in respect of the Local Plan, including in relation to the overall quantum of housing proposed and the lack of support for any growth of Hutton. The allocation of Site 030A for development will assist in correcting shortfalls in respect of the Local Plan, enabling it to be a sound plan.
4.6. We note the requirements set out under Paragraph 139 which confirms that when defining Green Belt boundaries and where sites may not be allocated for development at the present time, plans should "identify areas of safeguarded land between the urban area and the Green Belt, in order to meet longer-term development needs stretching well beyond the plan period".
4.7. As a minimum therefore, land at Bayleys Mead should be safeguarded for future Green Belt release as and when a need may arise given its highly sustainable location and suitability to be developed without incurring encroachment between Hutton and the main Brentwood urban area.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Local Housing Need
Representation ID: 24070
Received: 19/03/2019
Respondent: Countryside Properties
Agent: Strutt & Parker LLP
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
The PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method, for Brentwood, the result is a requirement of 452 dwellings per annum. The NPPF requires for Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change. A further factor is the need to consider unmet needs of neighbouring authorities. The proposed annual housing target of the Plan only fractionally exceeds the minimum housing requirement.
Support
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
POLICY R16 & R17: LAND OFF DODDINGHURST ROAD
Representation ID: 24081
Received: 19/03/2019
Respondent: Countryside Properties
Agent: Strutt & Parker LLP
Support subject to amendments to policy wording. Site is achievable, deliverable, achievable within the first five years of the plan period. Housing number: A significant amount of feasibility work has been undertaken to confirm that the site can provide at least 250 homes. The 200-unit figure in Policy R16&17 has far less rationale and technical justification and may lessen the ability of this site. Access: the current wording allows for access from Doddinghurst Road only, this could have viability implications of housing delivery. We request that the policy retains flexibility for the use of the other accesses.
Amend wording in Policy R16&17 with regards to(1) unit number (2) access, so that the policy retains flexibility for the use of the other accesses from Karen Close and Russell Close as a worst case scenario, in the interests of protecting the deliverability of the southern parcel of the site, particularly as these routes of access have been previously agreed with Essex County Council Highways.
Amend wordings in relation to the timing of the delivery in Appendix 1 and paragraph 9.160.
1. Introduction
1.1 These representations are submitted by Strutt & Parker on behalf of Countryside Properties (UK) Ltd in relation to the Brentwood Borough Council Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our clients land at Doddinghurst Road (North & South of the A12), which has been allocated under Policy R16 & 17 of the PSLP. A plan showing the site is provided as Appendix A to this representation.
1.2 Countryside was founded in Essex 60 years ago by Alan Cherry and has since established a reputation for delivering high quality developments. With the ethos 'creating places people love', Countryside's achievements are exemplified through having won more Housing Design Awards than any other house builder.
1.3 Countryside is a major development and place-maker, having secured planning permission and building out developments in varying scales: from smaller 30 dwelling schemes on the edge of village's through to large urban extensions of 3,500 new homes plus associated community facilities. Countryside has a proven track record of delivery. The company is headquartered in Brentwood and has a proud legacy of local sites such as Clements Park and the Square on Hart Street.
1.4 The representations set out Countryside's position in relation to the residential site allocation of R16 and R17, both parcels of which fall within their control. The proposed allocation provides for around 200 dwellings and is an important contribution towards BBC's land supply for Brentwood Borough's Draft Plan. The representations provide comments on the relevant policies relating to those interests in the Draft Plan.
1.5 As the Council will be aware, representations have previously been made on behalf of Countryside Properties and in respect of the two parcels of land, towards the Preferred Options Consultation in October 2013 and the Strategic Growth Options Consultation February 2015, and the Regulation 18 Local Plan in March 2018. As a result of these representations, and the discussions that have been held with officers at Brentwood Borough Council alongside the Local Plan process, the two parcels either side of the A12 at Doddinghurst Road have been proposed as a housing allocation within PSLP. From here, the two parcels of land are referred to as "the site", in respect of their joint allocation and policy.
1.6 Countryside's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to the elements of the Housing and Development Management Policies and the housing trajectory relating to the delivery of Policy R16 and R17 during the Plan period.
1.7 Where such concerns are raised, specific changes to the relevant polices are sought and these are indicated in the following representations in order to assist the Council to make the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy.
1.8 Site 023A measures at approximately 5.99ha and Site 023B measures at approximately 2.2ha. The Council have defined the total net developable area of the two sites as 6.14ha. The site is currently designated as Green Belt in the adopted development plan.
1.9 The PSLP has recognised the sustainability of the site and enclosed character, and have therefore proposed it for removal from the Green Belt and for its allocation to provide housing. We support this allocation but do however have some concerns over other policies in the PSLP that may have implications for the efficient and timely delivery of this site.
2. Brentwood Local Plan Regulation 19 Consultation
Housing Need
2.1. Paragraph 4.13 of the PSLP states that the Borough's housing requirement is 350 dwellings per annum. Paragraph 4.12 confirms that this figure is calculated using the Standard Method (as per the NPPF and respective Planning Practice Guidance(PPG)). We note that the PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method (Paragraph: 004 Reference ID: 2a-004-20190220).
2.2. On this basis, the relevant subnational population projections indicate an average annual increase of 293.2 households in the Borough between 2019 and 2029. The latest (2017) ratio of median house price to median gross annual workplace-based earnings for the Borough published by the ONS is 11.23. Once the Standard Method is applied using these figures this results in a requirement of 452 dwellings per annum.
2.3. The NPPF requires Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change.
2.4. At paragraph 4.16 the PSLP considers it appropriate to apply a 20% uplift to the identified housing target of 350 dwellings per annum, resulting in a proposed target of 456 dwellings per annum. The rationale for this buffer is unclear with separate references to the buffer advising that it allows for an additional housing land supply to maintained, but also that it serves to safeguard against any potential uplift to the standard methodology for calculating housing need, pending the outcome of the Government's 'Technical consultation on updates to national planning policy and guidance'.
2.5. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility or Green Belt protection. Moreover, the figure does not allow provision for unmet need from neighbouring authorities in addition to the minimum requirement.
2.6. At 4.18 the PSLP confirms the Council have not been able to identify a five-year housing land supply to deliver the annualised requirement. Further to this, at 4.19 the PSLP confirms that there is a high proportion of designated Green Belt within the Borough, making it extremely difficult to achieve a five-year supply due to the fact that sites on the edge of settlements, currently within the Green Belt are not available for development purposes until the adoption of the Plan.
2.7. The Borough has a limited amount of previously developed land within its authority to provide for short term delivery, as such Green Belt release is required in order to meet the Authorities housing need and deliver within the short, medium and long term, as stated at paragraph 2.54 of the PSLP. The approach to amend the Green Belt boundaries is therefore supported.
2.8. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility, Green Belt protection or unmet need from neighbouring authorities in addition to the minimum requirement.
2.9. In respect of the above, whilst the current PSLP and associated housing allocations seek to go some way in delivering housing that will support the recognised needs of the Borough over the next 15 years, there is clearly a need to increase this provision. Whilst this could be helped through the identification of additional sites, ensuring the delivery and efficient use of the sites that are allocated for housing will also provide a degree of buffer. Further commentary and recommendations in this regard are provided later within this representation.
Five-year Housing Land Supply and Housing Trajectory
2.10. The Council is required to demonstrate a five-year housing land supply at any point in the plan period (Paragraph: 038 Reference ID: 3-038-20180913).
2.11. The NPPF (Paragraph 73) confirms that a 20% buffer should be applied to the initial calculation for a five-year housing land supply requirement, in the event that the results of the Housing Delivery Test show that there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. From November 2018, significant under delivery indicates that delivery was below 85% of the requirement for the Borough. The PPG (Paragraph: 037 Reference ID: 3-037-20180913) also confirms that the requirement for a 20% buffer also applies where a Local Planning Authority are seeking to confirm their five-year housing land supply through a recently adopted Local Plan.
2.12. The results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years and this is therefore well below the threshold for the 20% buffer requirement.
2.13. The Borough's most recent reported five-year housing land supply (Five Year Housing Land Supply Statement as at 31 March 2018 (November 2018) ('HLSS') is 4.1 years. This is predicated on a requirement which, when considered in relation to the latest guidance, understates need; and a supply which, again when considered in relation to latest guidance, overstates supply. As such, the actual housing land supply is noticeably less.
2.14. Looking at this in detail, the HLSS considers an annual need of 343 dwellings, resulting in a total requirement once the 20% has been applied of 2,058 dwellings. However, applying the latest guidance and the Standard Method, the Borough's housing requirement is 452 dwellings per annum. Applying the 20% buffer, this results in a five-year requirement of 2,712 dwellings.
2.15. In terms of supply, the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years. As per the Glossary contained within Annex 2 of the NPPF, such sites cannot be considerable deliverable for the purposes of the five-year housing land supply. Table 1 of the HLSS suggests that at least 1,042 dwellings in the reported supply did not have planning permission. Once these are removed from the supply calculation, the five-year supply comprises 653 dwellings. It is unclear if and how many of the dwellings categorised as having extant planning permission are on major sites which only benefit from outline permission. Such sites would also have to be discounted. As such, the figure of 653 dwellings may overstate housing supply.
2.16. A five-year supply of 653 dwellings compared to a requirement of 2,712 represents a 1.2-year housing land supply. This acute housing land supply shortage demonstrates the importance of allocating sites through the Local Plan which can delivery early in the plan period, and support the existing supply of housing. It also emphasises the need to avoid over-reliance on large strategic sites which inevitably take longer to deliver.
2.17. The housing trajectory provided as Appendix 1 to the PSLP projects that it will enable completion of 2,305 dwellings between 2019/20 and 2023/24.
2.18. Having regard to the Standard Method and the need to apply a 20% buffer to the housing requirement, the total five-year requirement for the Borough is 2,712 dwellings. Therefore, even before critical review of the supply, the PSLP will not provide a five-year supply of housing.
2.19. Furthermore, and in respect of the projected supply, we are concerned to note that Dunton Hills Garden Village is anticipated to deliver housing completions from 2022/23, falling within the first five years of the plan.
2.20. Dunton Hills Garden Village is a proposed major strategic development, intended to provide a new settlement supported by a range of facilities and infrastructure. Delivery will require the coordination and input of multiple landowners, developers, infrastructure providers and other stakeholders. Once allocated, the PSLP proposes a masterplan and design guidance will be required to be prepared to ensure that a cohesive approach is taken to the development of the Garden Village.
2.21. As such, it is a concern that 100 homes will be completed at Dunton Hills Garden Village as early as 2022/23. This does not in itself mean that Dunton Hills Garden Village proposals cannot form part of a sound Local Plan, but it does again demonstrate an inability to rely on large strategic sites for short term housing delivery, and emphasises the need for smaller sites to be supported by policies which will allow their short term delivery to ensure the Local Plan is sound.
Policy R16 & R17: Land off Doddinghurst Road
2.22. Policy R16 & R17 proposes the release of the site from the Green Belt and allocation for around 200 new homes. This approach is supported as an achievable and deliverable solution to contributing towards the Borough's housing land supply to meet the housing need requirement.
2.23. Having regard to the PSLP's housing trajectory, paragraph 9.160 the PSLP states the dwellings are anticipated to be delivered between 2023/24 and 2026/27. We do not support this assumption and object to the timing of the delivery of this site, as set out in the above mentioned paragraph and Appendix 1 of the PSLP. As the Council will be aware, representations have been made to earlier iterations of the emerging Local Plan to confirm the site is available, deliverable and achievable within the first five years of the plan period.
2.24. As currently proposed the trajectory is unsound in relation to this site, and as such is not justified. This is because the site can be delivered earlier than the stated timescales in Appendix 1 of the PSLP. In order to make the housing trajectory sound, amendments to the trajectory must be made to reflect the earlier delivery of the site in the plan period. The proposed amendments would result in a justified approach and a sound policy.
2.25. In addition to amending the housing trajectory to reflect the realistic and earlier delivery of the site, as proposed by a developer with an option on the land, the inclusion of the site within the first five years on the plan period will assist BBC with their five-year housing land supply position, not only assisting in housing delivery of the PSLP is effective and can be found sound at Examination.
Unit Numbers
2.26. Whilst we are supportive of the allocation, we raise concerns in relation to the wording of allocation policies such as Policy R16 & R17 should take this requirement for flexibility into account and worded as such to provide "at least 200 homes", as opposed to "around 200 homes". We consider that this would provide greater certainty on the number of homes to be delivered as part of each allocation for Brentwood Borough Council, and also allows for the delivery of additional units where appropriate opportunities may arise.
2.27. For sites R16 and R17, a significant amount of feasibility work has been undertaken to establish any site constraints, and as a result of this, Countryside are confident in the ability for the site to provide at least 250 homes. We have concerns that the respective policy's current format may be interpreted to confirm the optimum use of the site, rather than a lower limit. In fact, the 200-unit figure has been produced by Brentwood Borough Council with far less rationale and technical justification than has been undertaken by Countryside Properties and may lessen the ability of this site and other policies with similar wording to support Brentwood's need for a buffer and flexibility in their housing land supply.
Access
2.28. It is noted that there has been a change in wording of Part B (b) of Policy R16 & R17 from the November 2018 Proposed Submission Local Plan presented to Committee, and that now being consulted on (February 2019), with no explanation. The previous iteration of the policy required vehicular access to be provided from "Doddinghurst Road for both site and/or Karen Close and Russell Close". The current policy is worded to allow for vehicular access from Doddinghurst Road only.
2.29. Whilst access from Doddinghurst Road is accepted as the preferred strategy for all parties, initial appraisal work in this respect has recognised a potential requirement for significant levelling and land movement which could have implications on the viability of housing delivery on the site. It is therefore requested that the policy retains flexibility for the use of the other accesses from Karen Close and Russell Close as a worst case scenario, in the interests of protecting the deliverability of the southern parcel of the site, particularly as these routes of access have been previously agreed with Essex County Council Highways.
Policy SP03 Health Impact Assessments
2.30. The Policy requires planning applications for developments of 50 or more to be dwellings, non-residential development of 1,000sqm or more or schemes for C2 class developments to be supported by HIAs. The HBF response to this policy is unsupportive and they consider the policy to be unsound as it is not consistent with national policy and is ineffective.
2.31. We are in agreement with the HBF's response, dated 17th March 2019, in relation to the requirement for HIAs to be provided for 50 or more dwellings and consider the requirement to be unnecessary and an additional burden on applicants. Referring to the PPG we note that HIAs may be useful tools, however the PPG also expresses the importance of the local plan needing to consider the wider health issues in an area and ensuring the policies respond to these concerns. The guidance is provided below for completeness.
2.32. Paragraph: 002 Reference ID: 53-002-20140306 confirms that provision of the required health infrastructure should be supported and taken into account at local and neighbourhood plan making, and when determining planning applications.
2.33. Referring to National policy, paragraph 20 states that Strategic Policies should set out an overall strategy for the pattern, scale and quality of development, this includes infrastructure and community facilities.
2.34. In order for the local plan to be consistent with national policy, the Local Plan should already consider the impact of development on the health and wellbeing of the communities and any identified infrastructure should be addressed in policy. Therefore, whilst Countryside support the important consideration of health and wellbeing of communities where development is in line with the policies contained within the development plan a HIA should not be necessary. The requirement for a HIA should only be triggered where there is a departure from the plan, enabling the Council to assess any impacts on the health and well-being of the community as a result of said proposals.
Policy SP05 Construction Management
2.35. The Policy expects all major development schemes/developers to sign up to the Considerate Constructors Scheme, or equivalent. The scheme is a non-profit making, independent organisation which monitors construction sites signed up to the scheme, with the aim of managing and mitigating impacts arising from construction. This requirement is considered unjustified and inconsistent with national policy.
2.36. Whilst we recognise the importance of managing the potential impacts on construction sites, we consider this policy to be unsound because it is unjustified and not consistent with national policy. We would suggest that consideration for the scheme is best dealt with through planning applications and development management without it being written into formal planning policy.
2.37. We are not aware of any other adopted or emerging Local Plan which requires applicants and developers of major sites to enter into a specified construction management scheme and therefore question the reasonableness of this policy. The matter of construction management should be assessed on a case by case basis and should not be a matter for a strategic policy to prescribe. How a construction scheme is managed and mitigated should be an item for consideration by the decision taker and assessed on a case by case basis.
2.38. The imposition of Policy SP05 requires all major developments to be signed up to the Considerate Constructors Scheme regardless of the site or proposal details. It is recommended that this policy is removed.
Policy BE02 Sustainable Construction and Resource Efficiency
2.39. We consider the policy to be unsound as it is inconsistent with national policy. Part (f) of Policy BE02 requires the inclusion of renewable and decentralised energy as part of a new development, this is not consistent with national policy. Whilst Countryside recognise the importance of sustainable construction, a policy approach to such requirements does not allow for the appropriate flexibility in this regard, as recognised in the NPPF.
2.40. Paragraph 153 of the NPPF states that local plans can expect development to meet such provisions, however the NPPF also states that they are only required to comply with such policies where it is either feasible or viable. To ensure consistency with national policy part (f) of Policy BE02 should be amended to reflect this position.
Policy BE03 Carbon Reduction, Renewable Energy and Water Efficiency
2.41. It is Government policy to seek to deliver improvements to emissions from buildings through the building regulations regime. As such we do not consider it necessary to include the table at part (a) of this policy. Should a national zero carbon policy be introduced it will be achieved and applied through building regulations, as noted at paragraph 5.33.
2.42. We therefore echo those comments of the HBF's consultation response, dated 17th March 2019, and suggest that if the building regulations are updated then the Council should revisit the policy through a local plan review at that stage, but that such matters are dealt with through building regulations in the meantime to prevent unnecessary duplicate consideration of such matters through both planning and construction stages.
Policy BE04 Establishing Low Carbon and Renewable Energy Infrastructure Network
2.43. It is acknowledged that the Government support the transition to a low carbon future in a changing climate, including support towards renewable and low carbon energy and associated infrastructure. Countryside support these intentions.
2.44. Part (b) of Policy BE04 expects sites of over 500 dwellings, including where there are clusters of neighbouring sites that total over 500 units, shall incorporate decentralised energy infrastructure in line with a hierarchy however.
2.45. We raise concerns in relation to the deliverability of part (b) of the policy in relation to sites within a cluster of 500 or more dwellings given that neighbouring sites will not necessary come forward by multiple landowners and developers at similar times. The coordinating and implementation of a heat network to serve smaller scale sites as separate applications but adjacent to other similar sized sites in the locality, is unreasonable and unjustified and could result in a delay in delivery of new homes, resulting in an ineffective local plan.
2.46. It is recommended that the requirement for new development located where 'clusters' of neighbouring sites totals over 500 units should be removed from the policy in order to make the policy effective.
Policy BE10 Connecting New Developments to Digital Infrastructure
2.47. It is Government policy to support the expansion of electronic communications networks. However, we would draw the Council's attention to the Written Ministerial Statement, 25th March 2015, which announced that local planning authorities preparing Local Plans, "should not set any additional standards or requirements relating to the construction, internal layout or performance of new dwellings."
2.48. The Local Planning Authority are only allowed to adopt the three optional technical standards, in relation to construction, internal layout and performance, subject to evidenced need and viability. As such, the Council should not seek higher standards than Building Regulations, as already referred to in our response to Policy BE03. Therefore, Policy BE10 is considered unsound because it is unjustified and contrary to national policy.
2.49. We are also unaware of National Policy requiring benches and bins to be connected to mobile digital infrastructure. As such the policy is unjustified and contrary to national policy.
2.50. Countryside are committed to ensuring that all developments go as far as is practical to meet national intentions to ensure the quality, practicality and future-proofing of new housing developments. We have concerns however that by introducing a wealth of additional planning policies in these areas, there will be unnecessary duplication to building regulations, and potentially delays to planning applications which will in turn impact on the timely delivery of new homes.
3. Site Deliverability
3.1. The site represents a deliverable, sustainable and achievable site for residential development. A number of technical reports and associated documents have been completed which demonstrate this. The below section provides a summary of these documents.
Density Study
3.2. A Density Study (January 2018) has been undertaken by JTP Architects.
3.3. As per Paragraph 2.23 of this representation, the Preferred Site Allocations Document (January 2018) states that the indicative dwelling yield of the site is 200 dwellings.
3.4. The Density Study confirms that the total site area is 8.02ha and the total developable area is 6.17ha. Furthermore, it confirms that the site can accommodate up to 250 dwellings with 180 dwellings on Site 023A and 40 dwellings on parcel 023B, which results in 40 dwellings per hectare and 25 dwellings per hectare, respectively.
3.5. The Density Study also provides a Developable Area Plan which illustrates the developable area, the existing trees and root protections areas (RPA), the easements and attenuation and drainage. The plan proposed that the most significant existing trees and foliage are retained.
3.6. Furthermore, the Study characterises the existing landscape features of Site 023A as three naturally formed developable areas. This natural formation will enable an orthogonal street pattern and regular frontage and a more efficient layout of a potentially higher density.
3.7. The study characterises Site 023B as a more irregular shape due to the present underground services. Furthermore, the Density Study identifies that the site has more constrained access opportunities. This has led to a more organic layout of a potentially lower density.
3.8. Given the evidence in the Density Study, the site could accommodate up to 250 dwellings. Further detail on how the site could present a sustainable development opportunity can be found in the summaries below.
Air Quality
3.9. An Air Quality Assessment was undertaken by Ardent Consulting Engineers in February 2017. The assessment reviews air quality constraints affecting the site.
3.10. The assessment concludes that it is unlikely that the proposed development will be considered high risk in terms of construction impacts. It also suggests that there has been a general improvement in local air quality over recent years which is evidenced by the monitored concentrations which are detailed within the report. Nevertheless, the assessment recommends that mitigation measures may need to be adopted as part of the development and be further considered in due course.
3.11. The assessment recommends that the impact of any potential increase in traffic flow on the local road network should be determined by way of a detailed air quality assessment.
3.12. Given the proximity of the A12, there is the potential for the introduction of a new exposure adjacent to the A12. This is dependent on the distance between individual units and the A12 which is to be addressed through careful design by the Architects.
Archaeology
3.13. An Archaeological Desk Based Assessment was undertaken by CGMS Consulting in November 2014.
3.14. The assessment confirms that the site does not lie within an area of archaeological priority, as previously designated by Brentwood Borough Council. It confirms that the site can be considered to have a modest potential for the late prehistoric.
3.15. The assessment also confirms that the site has remained undeveloped land through its documented history.
3.16. The assessment anticipates that Essex County Council archaeological advisors may request additional archaeological mitigation measures, initially in the form of a geophysical survey.
Desktop Noise Report
3.17. A Desktop Noise Report was completed by Ardent Consulting Engineers in March 2016.
3.18. The Noise Report concludes that subject to appropriate mitigation measures, the proposed internal and external areas of the proposed development could be demonstrated to be within desirable noise levels, subject to a detailed assessment.
3.19. The report states that ambient vibration levels may be a concern due to the sites proximity to the A12. These will need to be further addressed during more detailed assessment works.
3.20. Furthermore, a Noise Feasibility Plan has also been produced by Ardent Consulting Engineers. The plan provides a number of layout recommendations for Glazing, Ventilation, Rear Gardens and Balconies and Standalone Barriers. The Noise Feasibility Plan also outlines the closest possible building line on site which has reasonable attenuation and the recommended approximate minimum effective extent of an acoustic barrier. The plan also provides dimensions between the site and the nearest channel of the A12.
Drainage Strategy
3.21. A Drainage Strategy Technical Note was produced by Ardent Consulting Engineers in 2016. The note confirms that existing foul and surface water sewers navigate the site, together with a number of watercourses which will continue to serve the site, post development.
3.22. The report also confirms that the site is within Flood Zone 1 and is therefore suitable for residential development. The note suggests that subject to further investigation and detailed design, a Flood Risk Assessment and Detailed Drainage Strategy can be prepared to support a successful planning application for the development.
Phase 1 Habitat Survey
3.23. A Phase 1 Habitat Survey was produced by SES in 2014. The survey concluded that the habitats on site have the potential to be of value to protected species, as well as being of general biodiversity value themselves. As a result, the Phase 1 Habitat Survey recommends that the following works are undertaken;
* Reptiles (presence/likely absence survey - northern site only);
* Badgers (monitoring of setts on site);
* Bats (tree inspection surveys, activity surveys);
* Breeding Bird (walkover survey during breeding bird season, generally March to August); and
* Invertebrates (walkover survey to establish value for rate and vulnerable beetles).
3.24. It is considered within the survey that any potential adverse impacts from the proposed development upon specific protected species will be able to be wholly mitigated for with careful design.
Social Infrastructure Review
3.25. A Social Infrastructure Review was produced by Quod in February 2017. The review looked to provide an assessment of the likely impact of the development of the site on the demand for school places and healthcare provision.
3.26. The review confirms that based on average household sizes for the area, it is anticipated that the site could accommodate a resident population of approximately 600 people and generate demand for 68 primary school places and 45 secondary school places.
3.27. In line with this estimated growth, the review provides a summary of the education and healthcare provision within Brentwood.
3.28. The review states that although a number of existing primary schools in the Brentwood urban area are being expanded or are due to be expanded, Essex County Council is still expecting to be facing a deficit of places by 2020/21, with the Preferred Site Allocations Document stating that there is an estimated deficit of 541 places by 2021/2022 for Primary Schools. In terms of Secondary School Provision, the Preferred Site Allocations document states that there will be an estimated deficit of 9 places by 2021/22.
3.29. In terms of healthcare provision, the report confirms that the capacity to absorb additional demand arising from developments in the Brentwood Urban Area is limited. The Preferred Site Allocations document confirms this and states that there is likely to be significant pressures on GP Surgeries due to housing growth in the Borough throughout the lifetime of the plan.
Transport
3.30. A Transport Technical Note was prepared by Ardent Consulting Engineers in January 2018. The technical note provides an initial review of the anticipated highway and transportation impacts, based on a potential development of up to 250 dwellings at the site.
3.31. The note confirms that vehicular access to the site could be provided from Doddinghurst Road for the 23A of the site and provided via the extension of Karen Close and Russell Close at the 23B parcel.
3.32. In response to local concerns regarding the suitability of existing public transport provision, the note suggests that the site could generate an additional 7 peak hour bus trips and 35 peak hour rail trips. It is considered that there is sufficient capacity to accommodate these trips. The note confirms that there does not appear to be any specific issues relating to public transport.
3.33. The technical note confirms that the impacts on surrounding roads including Doddinghurst Road and Ongar Road would not be severe and should not be a reason for the site not to be allocated.
3.34. The note confirms that there are no highways issues that would prevent the site from being allocated for residential development in the emerging Local Development Plan.
3.35. The above studies demonstrate that the site is deliverable and sustainable.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Local Housing Need
Representation ID: 24083
Received: 19/03/2019
Respondent: Countryside Properties
Agent: Strutt & Parker LLP
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
The PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method, for Brentwood, the result is a requirement of 452 dwellings per annum. The NPPF requires for Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change. A further factor is the need to consider unmet needs of neighbouring authorities. The proposed annual housing target of the Plan only fractionally exceeds the minimum housing requirement.
The Plan's housing need should be amended to cover at 15 years from adoption. Realistically, we expect that an additional 2 years' worth of housing may be required to support a plan period up to 2035. Moreover, in respect of the fact that the authority is predominantly Green Belt, even if the plan period is extended until 2035, policies should account for potential development needs beyond this period. The allocation of sites for housing in Hutton, including that at Bayleys Mead, would provide for additional housing delivery.
1. Introduction
1.1 These representations are submitted by Strutt & Parker on behalf of Countryside Properties (UK) Ltd in relation to the Brentwood Borough Council Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our clients land at Doddinghurst Road (North & South of the A12), which has been allocated under Policy R16 & 17 of the PSLP. A plan showing the site is provided as Appendix A to this representation.
1.2 Countryside was founded in Essex 60 years ago by Alan Cherry and has since established a reputation for delivering high quality developments. With the ethos 'creating places people love', Countryside's achievements are exemplified through having won more Housing Design Awards than any other house builder.
1.3 Countryside is a major development and place-maker, having secured planning permission and building out developments in varying scales: from smaller 30 dwelling schemes on the edge of village's through to large urban extensions of 3,500 new homes plus associated community facilities. Countryside has a proven track record of delivery. The company is headquartered in Brentwood and has a proud legacy of local sites such as Clements Park and the Square on Hart Street.
1.4 The representations set out Countryside's position in relation to the residential site allocation of R16 and R17, both parcels of which fall within their control. The proposed allocation provides for around 200 dwellings and is an important contribution towards BBC's land supply for Brentwood Borough's Draft Plan. The representations provide comments on the relevant policies relating to those interests in the Draft Plan.
1.5 As the Council will be aware, representations have previously been made on behalf of Countryside Properties and in respect of the two parcels of land, towards the Preferred Options Consultation in October 2013 and the Strategic Growth Options Consultation February 2015, and the Regulation 18 Local Plan in March 2018. As a result of these representations, and the discussions that have been held with officers at Brentwood Borough Council alongside the Local Plan process, the two parcels either side of the A12 at Doddinghurst Road have been proposed as a housing allocation within PSLP. From here, the two parcels of land are referred to as "the site", in respect of their joint allocation and policy.
1.6 Countryside's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to the elements of the Housing and Development Management Policies and the housing trajectory relating to the delivery of Policy R16 and R17 during the Plan period.
1.7 Where such concerns are raised, specific changes to the relevant polices are sought and these are indicated in the following representations in order to assist the Council to make the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy.
1.8 Site 023A measures at approximately 5.99ha and Site 023B measures at approximately 2.2ha. The Council have defined the total net developable area of the two sites as 6.14ha. The site is currently designated as Green Belt in the adopted development plan.
1.9 The PSLP has recognised the sustainability of the site and enclosed character, and have therefore proposed it for removal from the Green Belt and for its allocation to provide housing. We support this allocation but do however have some concerns over other policies in the PSLP that may have implications for the efficient and timely delivery of this site.
2. Brentwood Local Plan Regulation 19 Consultation
Housing Need
2.1. Paragraph 4.13 of the PSLP states that the Borough's housing requirement is 350 dwellings per annum. Paragraph 4.12 confirms that this figure is calculated using the Standard Method (as per the NPPF and respective Planning Practice Guidance(PPG)). We note that the PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method (Paragraph: 004 Reference ID: 2a-004-20190220).
2.2. On this basis, the relevant subnational population projections indicate an average annual increase of 293.2 households in the Borough between 2019 and 2029. The latest (2017) ratio of median house price to median gross annual workplace-based earnings for the Borough published by the ONS is 11.23. Once the Standard Method is applied using these figures this results in a requirement of 452 dwellings per annum.
2.3. The NPPF requires Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change.
2.4. At paragraph 4.16 the PSLP considers it appropriate to apply a 20% uplift to the identified housing target of 350 dwellings per annum, resulting in a proposed target of 456 dwellings per annum. The rationale for this buffer is unclear with separate references to the buffer advising that it allows for an additional housing land supply to maintained, but also that it serves to safeguard against any potential uplift to the standard methodology for calculating housing need, pending the outcome of the Government's 'Technical consultation on updates to national planning policy and guidance'.
2.5. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility or Green Belt protection. Moreover, the figure does not allow provision for unmet need from neighbouring authorities in addition to the minimum requirement.
2.6. At 4.18 the PSLP confirms the Council have not been able to identify a five-year housing land supply to deliver the annualised requirement. Further to this, at 4.19 the PSLP confirms that there is a high proportion of designated Green Belt within the Borough, making it extremely difficult to achieve a five-year supply due to the fact that sites on the edge of settlements, currently within the Green Belt are not available for development purposes until the adoption of the Plan.
2.7. The Borough has a limited amount of previously developed land within its authority to provide for short term delivery, as such Green Belt release is required in order to meet the Authorities housing need and deliver within the short, medium and long term, as stated at paragraph 2.54 of the PSLP. The approach to amend the Green Belt boundaries is therefore supported.
2.8. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility, Green Belt protection or unmet need from neighbouring authorities in addition to the minimum requirement.
2.9. In respect of the above, whilst the current PSLP and associated housing allocations seek to go some way in delivering housing that will support the recognised needs of the Borough over the next 15 years, there is clearly a need to increase this provision. Whilst this could be helped through the identification of additional sites, ensuring the delivery and efficient use of the sites that are allocated for housing will also provide a degree of buffer. Further commentary and recommendations in this regard are provided later within this representation.
Five-year Housing Land Supply and Housing Trajectory
2.10. The Council is required to demonstrate a five-year housing land supply at any point in the plan period (Paragraph: 038 Reference ID: 3-038-20180913).
2.11. The NPPF (Paragraph 73) confirms that a 20% buffer should be applied to the initial calculation for a five-year housing land supply requirement, in the event that the results of the Housing Delivery Test show that there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. From November 2018, significant under delivery indicates that delivery was below 85% of the requirement for the Borough. The PPG (Paragraph: 037 Reference ID: 3-037-20180913) also confirms that the requirement for a 20% buffer also applies where a Local Planning Authority are seeking to confirm their five-year housing land supply through a recently adopted Local Plan.
2.12. The results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years and this is therefore well below the threshold for the 20% buffer requirement.
2.13. The Borough's most recent reported five-year housing land supply (Five Year Housing Land Supply Statement as at 31 March 2018 (November 2018) ('HLSS') is 4.1 years. This is predicated on a requirement which, when considered in relation to the latest guidance, understates need; and a supply which, again when considered in relation to latest guidance, overstates supply. As such, the actual housing land supply is noticeably less.
2.14. Looking at this in detail, the HLSS considers an annual need of 343 dwellings, resulting in a total requirement once the 20% has been applied of 2,058 dwellings. However, applying the latest guidance and the Standard Method, the Borough's housing requirement is 452 dwellings per annum. Applying the 20% buffer, this results in a five-year requirement of 2,712 dwellings.
2.15. In terms of supply, the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years. As per the Glossary contained within Annex 2 of the NPPF, such sites cannot be considerable deliverable for the purposes of the five-year housing land supply. Table 1 of the HLSS suggests that at least 1,042 dwellings in the reported supply did not have planning permission. Once these are removed from the supply calculation, the five-year supply comprises 653 dwellings. It is unclear if and how many of the dwellings categorised as having extant planning permission are on major sites which only benefit from outline permission. Such sites would also have to be discounted. As such, the figure of 653 dwellings may overstate housing supply.
2.16. A five-year supply of 653 dwellings compared to a requirement of 2,712 represents a 1.2-year housing land supply. This acute housing land supply shortage demonstrates the importance of allocating sites through the Local Plan which can delivery early in the plan period, and support the existing supply of housing. It also emphasises the need to avoid over-reliance on large strategic sites which inevitably take longer to deliver.
2.17. The housing trajectory provided as Appendix 1 to the PSLP projects that it will enable completion of 2,305 dwellings between 2019/20 and 2023/24.
2.18. Having regard to the Standard Method and the need to apply a 20% buffer to the housing requirement, the total five-year requirement for the Borough is 2,712 dwellings. Therefore, even before critical review of the supply, the PSLP will not provide a five-year supply of housing.
2.19. Furthermore, and in respect of the projected supply, we are concerned to note that Dunton Hills Garden Village is anticipated to deliver housing completions from 2022/23, falling within the first five years of the plan.
2.20. Dunton Hills Garden Village is a proposed major strategic development, intended to provide a new settlement supported by a range of facilities and infrastructure. Delivery will require the coordination and input of multiple landowners, developers, infrastructure providers and other stakeholders. Once allocated, the PSLP proposes a masterplan and design guidance will be required to be prepared to ensure that a cohesive approach is taken to the development of the Garden Village.
2.21. As such, it is a concern that 100 homes will be completed at Dunton Hills Garden Village as early as 2022/23. This does not in itself mean that Dunton Hills Garden Village proposals cannot form part of a sound Local Plan, but it does again demonstrate an inability to rely on large strategic sites for short term housing delivery, and emphasises the need for smaller sites to be supported by policies which will allow their short term delivery to ensure the Local Plan is sound.
Policy R16 & R17: Land off Doddinghurst Road
2.22. Policy R16 & R17 proposes the release of the site from the Green Belt and allocation for around 200 new homes. This approach is supported as an achievable and deliverable solution to contributing towards the Borough's housing land supply to meet the housing need requirement.
2.23. Having regard to the PSLP's housing trajectory, paragraph 9.160 the PSLP states the dwellings are anticipated to be delivered between 2023/24 and 2026/27. We do not support this assumption and object to the timing of the delivery of this site, as set out in the above mentioned paragraph and Appendix 1 of the PSLP. As the Council will be aware, representations have been made to earlier iterations of the emerging Local Plan to confirm the site is available, deliverable and achievable within the first five years of the plan period.
2.24. As currently proposed the trajectory is unsound in relation to this site, and as such is not justified. This is because the site can be delivered earlier than the stated timescales in Appendix 1 of the PSLP. In order to make the housing trajectory sound, amendments to the trajectory must be made to reflect the earlier delivery of the site in the plan period. The proposed amendments would result in a justified approach and a sound policy.
2.25. In addition to amending the housing trajectory to reflect the realistic and earlier delivery of the site, as proposed by a developer with an option on the land, the inclusion of the site within the first five years on the plan period will assist BBC with their five-year housing land supply position, not only assisting in housing delivery of the PSLP is effective and can be found sound at Examination.
Unit Numbers
2.26. Whilst we are supportive of the allocation, we raise concerns in relation to the wording of allocation policies such as Policy R16 & R17 should take this requirement for flexibility into account and worded as such to provide "at least 200 homes", as opposed to "around 200 homes". We consider that this would provide greater certainty on the number of homes to be delivered as part of each allocation for Brentwood Borough Council, and also allows for the delivery of additional units where appropriate opportunities may arise.
2.27. For sites R16 and R17, a significant amount of feasibility work has been undertaken to establish any site constraints, and as a result of this, Countryside are confident in the ability for the site to provide at least 250 homes. We have concerns that the respective policy's current format may be interpreted to confirm the optimum use of the site, rather than a lower limit. In fact, the 200-unit figure has been produced by Brentwood Borough Council with far less rationale and technical justification than has been undertaken by Countryside Properties and may lessen the ability of this site and other policies with similar wording to support Brentwood's need for a buffer and flexibility in their housing land supply.
Access
2.28. It is noted that there has been a change in wording of Part B (b) of Policy R16 & R17 from the November 2018 Proposed Submission Local Plan presented to Committee, and that now being consulted on (February 2019), with no explanation. The previous iteration of the policy required vehicular access to be provided from "Doddinghurst Road for both site and/or Karen Close and Russell Close". The current policy is worded to allow for vehicular access from Doddinghurst Road only.
2.29. Whilst access from Doddinghurst Road is accepted as the preferred strategy for all parties, initial appraisal work in this respect has recognised a potential requirement for significant levelling and land movement which could have implications on the viability of housing delivery on the site. It is therefore requested that the policy retains flexibility for the use of the other accesses from Karen Close and Russell Close as a worst case scenario, in the interests of protecting the deliverability of the southern parcel of the site, particularly as these routes of access have been previously agreed with Essex County Council Highways.
Policy SP03 Health Impact Assessments
2.30. The Policy requires planning applications for developments of 50 or more to be dwellings, non-residential development of 1,000sqm or more or schemes for C2 class developments to be supported by HIAs. The HBF response to this policy is unsupportive and they consider the policy to be unsound as it is not consistent with national policy and is ineffective.
2.31. We are in agreement with the HBF's response, dated 17th March 2019, in relation to the requirement for HIAs to be provided for 50 or more dwellings and consider the requirement to be unnecessary and an additional burden on applicants. Referring to the PPG we note that HIAs may be useful tools, however the PPG also expresses the importance of the local plan needing to consider the wider health issues in an area and ensuring the policies respond to these concerns. The guidance is provided below for completeness.
2.32. Paragraph: 002 Reference ID: 53-002-20140306 confirms that provision of the required health infrastructure should be supported and taken into account at local and neighbourhood plan making, and when determining planning applications.
2.33. Referring to National policy, paragraph 20 states that Strategic Policies should set out an overall strategy for the pattern, scale and quality of development, this includes infrastructure and community facilities.
2.34. In order for the local plan to be consistent with national policy, the Local Plan should already consider the impact of development on the health and wellbeing of the communities and any identified infrastructure should be addressed in policy. Therefore, whilst Countryside support the important consideration of health and wellbeing of communities where development is in line with the policies contained within the development plan a HIA should not be necessary. The requirement for a HIA should only be triggered where there is a departure from the plan, enabling the Council to assess any impacts on the health and well-being of the community as a result of said proposals.
Policy SP05 Construction Management
2.35. The Policy expects all major development schemes/developers to sign up to the Considerate Constructors Scheme, or equivalent. The scheme is a non-profit making, independent organisation which monitors construction sites signed up to the scheme, with the aim of managing and mitigating impacts arising from construction. This requirement is considered unjustified and inconsistent with national policy.
2.36. Whilst we recognise the importance of managing the potential impacts on construction sites, we consider this policy to be unsound because it is unjustified and not consistent with national policy. We would suggest that consideration for the scheme is best dealt with through planning applications and development management without it being written into formal planning policy.
2.37. We are not aware of any other adopted or emerging Local Plan which requires applicants and developers of major sites to enter into a specified construction management scheme and therefore question the reasonableness of this policy. The matter of construction management should be assessed on a case by case basis and should not be a matter for a strategic policy to prescribe. How a construction scheme is managed and mitigated should be an item for consideration by the decision taker and assessed on a case by case basis.
2.38. The imposition of Policy SP05 requires all major developments to be signed up to the Considerate Constructors Scheme regardless of the site or proposal details. It is recommended that this policy is removed.
Policy BE02 Sustainable Construction and Resource Efficiency
2.39. We consider the policy to be unsound as it is inconsistent with national policy. Part (f) of Policy BE02 requires the inclusion of renewable and decentralised energy as part of a new development, this is not consistent with national policy. Whilst Countryside recognise the importance of sustainable construction, a policy approach to such requirements does not allow for the appropriate flexibility in this regard, as recognised in the NPPF.
2.40. Paragraph 153 of the NPPF states that local plans can expect development to meet such provisions, however the NPPF also states that they are only required to comply with such policies where it is either feasible or viable. To ensure consistency with national policy part (f) of Policy BE02 should be amended to reflect this position.
Policy BE03 Carbon Reduction, Renewable Energy and Water Efficiency
2.41. It is Government policy to seek to deliver improvements to emissions from buildings through the building regulations regime. As such we do not consider it necessary to include the table at part (a) of this policy. Should a national zero carbon policy be introduced it will be achieved and applied through building regulations, as noted at paragraph 5.33.
2.42. We therefore echo those comments of the HBF's consultation response, dated 17th March 2019, and suggest that if the building regulations are updated then the Council should revisit the policy through a local plan review at that stage, but that such matters are dealt with through building regulations in the meantime to prevent unnecessary duplicate consideration of such matters through both planning and construction stages.
Policy BE04 Establishing Low Carbon and Renewable Energy Infrastructure Network
2.43. It is acknowledged that the Government support the transition to a low carbon future in a changing climate, including support towards renewable and low carbon energy and associated infrastructure. Countryside support these intentions.
2.44. Part (b) of Policy BE04 expects sites of over 500 dwellings, including where there are clusters of neighbouring sites that total over 500 units, shall incorporate decentralised energy infrastructure in line with a hierarchy however.
2.45. We raise concerns in relation to the deliverability of part (b) of the policy in relation to sites within a cluster of 500 or more dwellings given that neighbouring sites will not necessary come forward by multiple landowners and developers at similar times. The coordinating and implementation of a heat network to serve smaller scale sites as separate applications but adjacent to other similar sized sites in the locality, is unreasonable and unjustified and could result in a delay in delivery of new homes, resulting in an ineffective local plan.
2.46. It is recommended that the requirement for new development located where 'clusters' of neighbouring sites totals over 500 units should be removed from the policy in order to make the policy effective.
Policy BE10 Connecting New Developments to Digital Infrastructure
2.47. It is Government policy to support the expansion of electronic communications networks. However, we would draw the Council's attention to the Written Ministerial Statement, 25th March 2015, which announced that local planning authorities preparing Local Plans, "should not set any additional standards or requirements relating to the construction, internal layout or performance of new dwellings."
2.48. The Local Planning Authority are only allowed to adopt the three optional technical standards, in relation to construction, internal layout and performance, subject to evidenced need and viability. As such, the Council should not seek higher standards than Building Regulations, as already referred to in our response to Policy BE03. Therefore, Policy BE10 is considered unsound because it is unjustified and contrary to national policy.
2.49. We are also unaware of National Policy requiring benches and bins to be connected to mobile digital infrastructure. As such the policy is unjustified and contrary to national policy.
2.50. Countryside are committed to ensuring that all developments go as far as is practical to meet national intentions to ensure the quality, practicality and future-proofing of new housing developments. We have concerns however that by introducing a wealth of additional planning policies in these areas, there will be unnecessary duplication to building regulations, and potentially delays to planning applications which will in turn impact on the timely delivery of new homes.
3. Site Deliverability
3.1. The site represents a deliverable, sustainable and achievable site for residential development. A number of technical reports and associated documents have been completed which demonstrate this. The below section provides a summary of these documents.
Density Study
3.2. A Density Study (January 2018) has been undertaken by JTP Architects.
3.3. As per Paragraph 2.23 of this representation, the Preferred Site Allocations Document (January 2018) states that the indicative dwelling yield of the site is 200 dwellings.
3.4. The Density Study confirms that the total site area is 8.02ha and the total developable area is 6.17ha. Furthermore, it confirms that the site can accommodate up to 250 dwellings with 180 dwellings on Site 023A and 40 dwellings on parcel 023B, which results in 40 dwellings per hectare and 25 dwellings per hectare, respectively.
3.5. The Density Study also provides a Developable Area Plan which illustrates the developable area, the existing trees and root protections areas (RPA), the easements and attenuation and drainage. The plan proposed that the most significant existing trees and foliage are retained.
3.6. Furthermore, the Study characterises the existing landscape features of Site 023A as three naturally formed developable areas. This natural formation will enable an orthogonal street pattern and regular frontage and a more efficient layout of a potentially higher density.
3.7. The study characterises Site 023B as a more irregular shape due to the present underground services. Furthermore, the Density Study identifies that the site has more constrained access opportunities. This has led to a more organic layout of a potentially lower density.
3.8. Given the evidence in the Density Study, the site could accommodate up to 250 dwellings. Further detail on how the site could present a sustainable development opportunity can be found in the summaries below.
Air Quality
3.9. An Air Quality Assessment was undertaken by Ardent Consulting Engineers in February 2017. The assessment reviews air quality constraints affecting the site.
3.10. The assessment concludes that it is unlikely that the proposed development will be considered high risk in terms of construction impacts. It also suggests that there has been a general improvement in local air quality over recent years which is evidenced by the monitored concentrations which are detailed within the report. Nevertheless, the assessment recommends that mitigation measures may need to be adopted as part of the development and be further considered in due course.
3.11. The assessment recommends that the impact of any potential increase in traffic flow on the local road network should be determined by way of a detailed air quality assessment.
3.12. Given the proximity of the A12, there is the potential for the introduction of a new exposure adjacent to the A12. This is dependent on the distance between individual units and the A12 which is to be addressed through careful design by the Architects.
Archaeology
3.13. An Archaeological Desk Based Assessment was undertaken by CGMS Consulting in November 2014.
3.14. The assessment confirms that the site does not lie within an area of archaeological priority, as previously designated by Brentwood Borough Council. It confirms that the site can be considered to have a modest potential for the late prehistoric.
3.15. The assessment also confirms that the site has remained undeveloped land through its documented history.
3.16. The assessment anticipates that Essex County Council archaeological advisors may request additional archaeological mitigation measures, initially in the form of a geophysical survey.
Desktop Noise Report
3.17. A Desktop Noise Report was completed by Ardent Consulting Engineers in March 2016.
3.18. The Noise Report concludes that subject to appropriate mitigation measures, the proposed internal and external areas of the proposed development could be demonstrated to be within desirable noise levels, subject to a detailed assessment.
3.19. The report states that ambient vibration levels may be a concern due to the sites proximity to the A12. These will need to be further addressed during more detailed assessment works.
3.20. Furthermore, a Noise Feasibility Plan has also been produced by Ardent Consulting Engineers. The plan provides a number of layout recommendations for Glazing, Ventilation, Rear Gardens and Balconies and Standalone Barriers. The Noise Feasibility Plan also outlines the closest possible building line on site which has reasonable attenuation and the recommended approximate minimum effective extent of an acoustic barrier. The plan also provides dimensions between the site and the nearest channel of the A12.
Drainage Strategy
3.21. A Drainage Strategy Technical Note was produced by Ardent Consulting Engineers in 2016. The note confirms that existing foul and surface water sewers navigate the site, together with a number of watercourses which will continue to serve the site, post development.
3.22. The report also confirms that the site is within Flood Zone 1 and is therefore suitable for residential development. The note suggests that subject to further investigation and detailed design, a Flood Risk Assessment and Detailed Drainage Strategy can be prepared to support a successful planning application for the development.
Phase 1 Habitat Survey
3.23. A Phase 1 Habitat Survey was produced by SES in 2014. The survey concluded that the habitats on site have the potential to be of value to protected species, as well as being of general biodiversity value themselves. As a result, the Phase 1 Habitat Survey recommends that the following works are undertaken;
* Reptiles (presence/likely absence survey - northern site only);
* Badgers (monitoring of setts on site);
* Bats (tree inspection surveys, activity surveys);
* Breeding Bird (walkover survey during breeding bird season, generally March to August); and
* Invertebrates (walkover survey to establish value for rate and vulnerable beetles).
3.24. It is considered within the survey that any potential adverse impacts from the proposed development upon specific protected species will be able to be wholly mitigated for with careful design.
Social Infrastructure Review
3.25. A Social Infrastructure Review was produced by Quod in February 2017. The review looked to provide an assessment of the likely impact of the development of the site on the demand for school places and healthcare provision.
3.26. The review confirms that based on average household sizes for the area, it is anticipated that the site could accommodate a resident population of approximately 600 people and generate demand for 68 primary school places and 45 secondary school places.
3.27. In line with this estimated growth, the review provides a summary of the education and healthcare provision within Brentwood.
3.28. The review states that although a number of existing primary schools in the Brentwood urban area are being expanded or are due to be expanded, Essex County Council is still expecting to be facing a deficit of places by 2020/21, with the Preferred Site Allocations Document stating that there is an estimated deficit of 541 places by 2021/2022 for Primary Schools. In terms of Secondary School Provision, the Preferred Site Allocations document states that there will be an estimated deficit of 9 places by 2021/22.
3.29. In terms of healthcare provision, the report confirms that the capacity to absorb additional demand arising from developments in the Brentwood Urban Area is limited. The Preferred Site Allocations document confirms this and states that there is likely to be significant pressures on GP Surgeries due to housing growth in the Borough throughout the lifetime of the plan.
Transport
3.30. A Transport Technical Note was prepared by Ardent Consulting Engineers in January 2018. The technical note provides an initial review of the anticipated highway and transportation impacts, based on a potential development of up to 250 dwellings at the site.
3.31. The note confirms that vehicular access to the site could be provided from Doddinghurst Road for the 23A of the site and provided via the extension of Karen Close and Russell Close at the 23B parcel.
3.32. In response to local concerns regarding the suitability of existing public transport provision, the note suggests that the site could generate an additional 7 peak hour bus trips and 35 peak hour rail trips. It is considered that there is sufficient capacity to accommodate these trips. The note confirms that there does not appear to be any specific issues relating to public transport.
3.33. The technical note confirms that the impacts on surrounding roads including Doddinghurst Road and Ongar Road would not be severe and should not be a reason for the site not to be allocated.
3.34. The note confirms that there are no highways issues that would prevent the site from being allocated for residential development in the emerging Local Development Plan.
3.35. The above studies demonstrate that the site is deliverable and sustainable.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Local Housing Need
Representation ID: 24086
Received: 19/03/2019
Respondent: Countryside Properties
Agent: Strutt & Parker LLP
Legally compliant? No
Sound? No
Duty to co-operate? Yes
The Plan failed to identify a five year housing land supply plus 20% buffer to make up for under delivery as required by the NPPF. The Borough's most recent reported five-year housing land supply is 4.1 years, this is predicated on a requirement, and the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years; as such, the actual housing land supply is considerably less. In addition, the results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years.
In addition to amending the housing trajectory to reflect the realistic and earlier delivery of the site, as proposed by a developer with an option on the land, the inclusion of the site within the first five years on the plan period will assist BBC with their five-year housing land supply position.
1. Introduction
1.1 These representations are submitted by Strutt & Parker on behalf of Countryside Properties (UK) Ltd in relation to the Brentwood Borough Council Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our clients land at Doddinghurst Road (North & South of the A12), which has been allocated under Policy R16 & 17 of the PSLP. A plan showing the site is provided as Appendix A to this representation.
1.2 Countryside was founded in Essex 60 years ago by Alan Cherry and has since established a reputation for delivering high quality developments. With the ethos 'creating places people love', Countryside's achievements are exemplified through having won more Housing Design Awards than any other house builder.
1.3 Countryside is a major development and place-maker, having secured planning permission and building out developments in varying scales: from smaller 30 dwelling schemes on the edge of village's through to large urban extensions of 3,500 new homes plus associated community facilities. Countryside has a proven track record of delivery. The company is headquartered in Brentwood and has a proud legacy of local sites such as Clements Park and the Square on Hart Street.
1.4 The representations set out Countryside's position in relation to the residential site allocation of R16 and R17, both parcels of which fall within their control. The proposed allocation provides for around 200 dwellings and is an important contribution towards BBC's land supply for Brentwood Borough's Draft Plan. The representations provide comments on the relevant policies relating to those interests in the Draft Plan.
1.5 As the Council will be aware, representations have previously been made on behalf of Countryside Properties and in respect of the two parcels of land, towards the Preferred Options Consultation in October 2013 and the Strategic Growth Options Consultation February 2015, and the Regulation 18 Local Plan in March 2018. As a result of these representations, and the discussions that have been held with officers at Brentwood Borough Council alongside the Local Plan process, the two parcels either side of the A12 at Doddinghurst Road have been proposed as a housing allocation within PSLP. From here, the two parcels of land are referred to as "the site", in respect of their joint allocation and policy.
1.6 Countryside's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to the elements of the Housing and Development Management Policies and the housing trajectory relating to the delivery of Policy R16 and R17 during the Plan period.
1.7 Where such concerns are raised, specific changes to the relevant polices are sought and these are indicated in the following representations in order to assist the Council to make the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy.
1.8 Site 023A measures at approximately 5.99ha and Site 023B measures at approximately 2.2ha. The Council have defined the total net developable area of the two sites as 6.14ha. The site is currently designated as Green Belt in the adopted development plan.
1.9 The PSLP has recognised the sustainability of the site and enclosed character, and have therefore proposed it for removal from the Green Belt and for its allocation to provide housing. We support this allocation but do however have some concerns over other policies in the PSLP that may have implications for the efficient and timely delivery of this site.
2. Brentwood Local Plan Regulation 19 Consultation
Housing Need
2.1. Paragraph 4.13 of the PSLP states that the Borough's housing requirement is 350 dwellings per annum. Paragraph 4.12 confirms that this figure is calculated using the Standard Method (as per the NPPF and respective Planning Practice Guidance(PPG)). We note that the PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method (Paragraph: 004 Reference ID: 2a-004-20190220).
2.2. On this basis, the relevant subnational population projections indicate an average annual increase of 293.2 households in the Borough between 2019 and 2029. The latest (2017) ratio of median house price to median gross annual workplace-based earnings for the Borough published by the ONS is 11.23. Once the Standard Method is applied using these figures this results in a requirement of 452 dwellings per annum.
2.3. The NPPF requires Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change.
2.4. At paragraph 4.16 the PSLP considers it appropriate to apply a 20% uplift to the identified housing target of 350 dwellings per annum, resulting in a proposed target of 456 dwellings per annum. The rationale for this buffer is unclear with separate references to the buffer advising that it allows for an additional housing land supply to maintained, but also that it serves to safeguard against any potential uplift to the standard methodology for calculating housing need, pending the outcome of the Government's 'Technical consultation on updates to national planning policy and guidance'.
2.5. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility or Green Belt protection. Moreover, the figure does not allow provision for unmet need from neighbouring authorities in addition to the minimum requirement.
2.6. At 4.18 the PSLP confirms the Council have not been able to identify a five-year housing land supply to deliver the annualised requirement. Further to this, at 4.19 the PSLP confirms that there is a high proportion of designated Green Belt within the Borough, making it extremely difficult to achieve a five-year supply due to the fact that sites on the edge of settlements, currently within the Green Belt are not available for development purposes until the adoption of the Plan.
2.7. The Borough has a limited amount of previously developed land within its authority to provide for short term delivery, as such Green Belt release is required in order to meet the Authorities housing need and deliver within the short, medium and long term, as stated at paragraph 2.54 of the PSLP. The approach to amend the Green Belt boundaries is therefore supported.
2.8. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility, Green Belt protection or unmet need from neighbouring authorities in addition to the minimum requirement.
2.9. In respect of the above, whilst the current PSLP and associated housing allocations seek to go some way in delivering housing that will support the recognised needs of the Borough over the next 15 years, there is clearly a need to increase this provision. Whilst this could be helped through the identification of additional sites, ensuring the delivery and efficient use of the sites that are allocated for housing will also provide a degree of buffer. Further commentary and recommendations in this regard are provided later within this representation.
Five-year Housing Land Supply and Housing Trajectory
2.10. The Council is required to demonstrate a five-year housing land supply at any point in the plan period (Paragraph: 038 Reference ID: 3-038-20180913).
2.11. The NPPF (Paragraph 73) confirms that a 20% buffer should be applied to the initial calculation for a five-year housing land supply requirement, in the event that the results of the Housing Delivery Test show that there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. From November 2018, significant under delivery indicates that delivery was below 85% of the requirement for the Borough. The PPG (Paragraph: 037 Reference ID: 3-037-20180913) also confirms that the requirement for a 20% buffer also applies where a Local Planning Authority are seeking to confirm their five-year housing land supply through a recently adopted Local Plan.
2.12. The results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years and this is therefore well below the threshold for the 20% buffer requirement.
2.13. The Borough's most recent reported five-year housing land supply (Five Year Housing Land Supply Statement as at 31 March 2018 (November 2018) ('HLSS') is 4.1 years. This is predicated on a requirement which, when considered in relation to the latest guidance, understates need; and a supply which, again when considered in relation to latest guidance, overstates supply. As such, the actual housing land supply is noticeably less.
2.14. Looking at this in detail, the HLSS considers an annual need of 343 dwellings, resulting in a total requirement once the 20% has been applied of 2,058 dwellings. However, applying the latest guidance and the Standard Method, the Borough's housing requirement is 452 dwellings per annum. Applying the 20% buffer, this results in a five-year requirement of 2,712 dwellings.
2.15. In terms of supply, the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years. As per the Glossary contained within Annex 2 of the NPPF, such sites cannot be considerable deliverable for the purposes of the five-year housing land supply. Table 1 of the HLSS suggests that at least 1,042 dwellings in the reported supply did not have planning permission. Once these are removed from the supply calculation, the five-year supply comprises 653 dwellings. It is unclear if and how many of the dwellings categorised as having extant planning permission are on major sites which only benefit from outline permission. Such sites would also have to be discounted. As such, the figure of 653 dwellings may overstate housing supply.
2.16. A five-year supply of 653 dwellings compared to a requirement of 2,712 represents a 1.2-year housing land supply. This acute housing land supply shortage demonstrates the importance of allocating sites through the Local Plan which can delivery early in the plan period, and support the existing supply of housing. It also emphasises the need to avoid over-reliance on large strategic sites which inevitably take longer to deliver.
2.17. The housing trajectory provided as Appendix 1 to the PSLP projects that it will enable completion of 2,305 dwellings between 2019/20 and 2023/24.
2.18. Having regard to the Standard Method and the need to apply a 20% buffer to the housing requirement, the total five-year requirement for the Borough is 2,712 dwellings. Therefore, even before critical review of the supply, the PSLP will not provide a five-year supply of housing.
2.19. Furthermore, and in respect of the projected supply, we are concerned to note that Dunton Hills Garden Village is anticipated to deliver housing completions from 2022/23, falling within the first five years of the plan.
2.20. Dunton Hills Garden Village is a proposed major strategic development, intended to provide a new settlement supported by a range of facilities and infrastructure. Delivery will require the coordination and input of multiple landowners, developers, infrastructure providers and other stakeholders. Once allocated, the PSLP proposes a masterplan and design guidance will be required to be prepared to ensure that a cohesive approach is taken to the development of the Garden Village.
2.21. As such, it is a concern that 100 homes will be completed at Dunton Hills Garden Village as early as 2022/23. This does not in itself mean that Dunton Hills Garden Village proposals cannot form part of a sound Local Plan, but it does again demonstrate an inability to rely on large strategic sites for short term housing delivery, and emphasises the need for smaller sites to be supported by policies which will allow their short term delivery to ensure the Local Plan is sound.
Policy R16 & R17: Land off Doddinghurst Road
2.22. Policy R16 & R17 proposes the release of the site from the Green Belt and allocation for around 200 new homes. This approach is supported as an achievable and deliverable solution to contributing towards the Borough's housing land supply to meet the housing need requirement.
2.23. Having regard to the PSLP's housing trajectory, paragraph 9.160 the PSLP states the dwellings are anticipated to be delivered between 2023/24 and 2026/27. We do not support this assumption and object to the timing of the delivery of this site, as set out in the above mentioned paragraph and Appendix 1 of the PSLP. As the Council will be aware, representations have been made to earlier iterations of the emerging Local Plan to confirm the site is available, deliverable and achievable within the first five years of the plan period.
2.24. As currently proposed the trajectory is unsound in relation to this site, and as such is not justified. This is because the site can be delivered earlier than the stated timescales in Appendix 1 of the PSLP. In order to make the housing trajectory sound, amendments to the trajectory must be made to reflect the earlier delivery of the site in the plan period. The proposed amendments would result in a justified approach and a sound policy.
2.25. In addition to amending the housing trajectory to reflect the realistic and earlier delivery of the site, as proposed by a developer with an option on the land, the inclusion of the site within the first five years on the plan period will assist BBC with their five-year housing land supply position, not only assisting in housing delivery of the PSLP is effective and can be found sound at Examination.
Unit Numbers
2.26. Whilst we are supportive of the allocation, we raise concerns in relation to the wording of allocation policies such as Policy R16 & R17 should take this requirement for flexibility into account and worded as such to provide "at least 200 homes", as opposed to "around 200 homes". We consider that this would provide greater certainty on the number of homes to be delivered as part of each allocation for Brentwood Borough Council, and also allows for the delivery of additional units where appropriate opportunities may arise.
2.27. For sites R16 and R17, a significant amount of feasibility work has been undertaken to establish any site constraints, and as a result of this, Countryside are confident in the ability for the site to provide at least 250 homes. We have concerns that the respective policy's current format may be interpreted to confirm the optimum use of the site, rather than a lower limit. In fact, the 200-unit figure has been produced by Brentwood Borough Council with far less rationale and technical justification than has been undertaken by Countryside Properties and may lessen the ability of this site and other policies with similar wording to support Brentwood's need for a buffer and flexibility in their housing land supply.
Access
2.28. It is noted that there has been a change in wording of Part B (b) of Policy R16 & R17 from the November 2018 Proposed Submission Local Plan presented to Committee, and that now being consulted on (February 2019), with no explanation. The previous iteration of the policy required vehicular access to be provided from "Doddinghurst Road for both site and/or Karen Close and Russell Close". The current policy is worded to allow for vehicular access from Doddinghurst Road only.
2.29. Whilst access from Doddinghurst Road is accepted as the preferred strategy for all parties, initial appraisal work in this respect has recognised a potential requirement for significant levelling and land movement which could have implications on the viability of housing delivery on the site. It is therefore requested that the policy retains flexibility for the use of the other accesses from Karen Close and Russell Close as a worst case scenario, in the interests of protecting the deliverability of the southern parcel of the site, particularly as these routes of access have been previously agreed with Essex County Council Highways.
Policy SP03 Health Impact Assessments
2.30. The Policy requires planning applications for developments of 50 or more to be dwellings, non-residential development of 1,000sqm or more or schemes for C2 class developments to be supported by HIAs. The HBF response to this policy is unsupportive and they consider the policy to be unsound as it is not consistent with national policy and is ineffective.
2.31. We are in agreement with the HBF's response, dated 17th March 2019, in relation to the requirement for HIAs to be provided for 50 or more dwellings and consider the requirement to be unnecessary and an additional burden on applicants. Referring to the PPG we note that HIAs may be useful tools, however the PPG also expresses the importance of the local plan needing to consider the wider health issues in an area and ensuring the policies respond to these concerns. The guidance is provided below for completeness.
2.32. Paragraph: 002 Reference ID: 53-002-20140306 confirms that provision of the required health infrastructure should be supported and taken into account at local and neighbourhood plan making, and when determining planning applications.
2.33. Referring to National policy, paragraph 20 states that Strategic Policies should set out an overall strategy for the pattern, scale and quality of development, this includes infrastructure and community facilities.
2.34. In order for the local plan to be consistent with national policy, the Local Plan should already consider the impact of development on the health and wellbeing of the communities and any identified infrastructure should be addressed in policy. Therefore, whilst Countryside support the important consideration of health and wellbeing of communities where development is in line with the policies contained within the development plan a HIA should not be necessary. The requirement for a HIA should only be triggered where there is a departure from the plan, enabling the Council to assess any impacts on the health and well-being of the community as a result of said proposals.
Policy SP05 Construction Management
2.35. The Policy expects all major development schemes/developers to sign up to the Considerate Constructors Scheme, or equivalent. The scheme is a non-profit making, independent organisation which monitors construction sites signed up to the scheme, with the aim of managing and mitigating impacts arising from construction. This requirement is considered unjustified and inconsistent with national policy.
2.36. Whilst we recognise the importance of managing the potential impacts on construction sites, we consider this policy to be unsound because it is unjustified and not consistent with national policy. We would suggest that consideration for the scheme is best dealt with through planning applications and development management without it being written into formal planning policy.
2.37. We are not aware of any other adopted or emerging Local Plan which requires applicants and developers of major sites to enter into a specified construction management scheme and therefore question the reasonableness of this policy. The matter of construction management should be assessed on a case by case basis and should not be a matter for a strategic policy to prescribe. How a construction scheme is managed and mitigated should be an item for consideration by the decision taker and assessed on a case by case basis.
2.38. The imposition of Policy SP05 requires all major developments to be signed up to the Considerate Constructors Scheme regardless of the site or proposal details. It is recommended that this policy is removed.
Policy BE02 Sustainable Construction and Resource Efficiency
2.39. We consider the policy to be unsound as it is inconsistent with national policy. Part (f) of Policy BE02 requires the inclusion of renewable and decentralised energy as part of a new development, this is not consistent with national policy. Whilst Countryside recognise the importance of sustainable construction, a policy approach to such requirements does not allow for the appropriate flexibility in this regard, as recognised in the NPPF.
2.40. Paragraph 153 of the NPPF states that local plans can expect development to meet such provisions, however the NPPF also states that they are only required to comply with such policies where it is either feasible or viable. To ensure consistency with national policy part (f) of Policy BE02 should be amended to reflect this position.
Policy BE03 Carbon Reduction, Renewable Energy and Water Efficiency
2.41. It is Government policy to seek to deliver improvements to emissions from buildings through the building regulations regime. As such we do not consider it necessary to include the table at part (a) of this policy. Should a national zero carbon policy be introduced it will be achieved and applied through building regulations, as noted at paragraph 5.33.
2.42. We therefore echo those comments of the HBF's consultation response, dated 17th March 2019, and suggest that if the building regulations are updated then the Council should revisit the policy through a local plan review at that stage, but that such matters are dealt with through building regulations in the meantime to prevent unnecessary duplicate consideration of such matters through both planning and construction stages.
Policy BE04 Establishing Low Carbon and Renewable Energy Infrastructure Network
2.43. It is acknowledged that the Government support the transition to a low carbon future in a changing climate, including support towards renewable and low carbon energy and associated infrastructure. Countryside support these intentions.
2.44. Part (b) of Policy BE04 expects sites of over 500 dwellings, including where there are clusters of neighbouring sites that total over 500 units, shall incorporate decentralised energy infrastructure in line with a hierarchy however.
2.45. We raise concerns in relation to the deliverability of part (b) of the policy in relation to sites within a cluster of 500 or more dwellings given that neighbouring sites will not necessary come forward by multiple landowners and developers at similar times. The coordinating and implementation of a heat network to serve smaller scale sites as separate applications but adjacent to other similar sized sites in the locality, is unreasonable and unjustified and could result in a delay in delivery of new homes, resulting in an ineffective local plan.
2.46. It is recommended that the requirement for new development located where 'clusters' of neighbouring sites totals over 500 units should be removed from the policy in order to make the policy effective.
Policy BE10 Connecting New Developments to Digital Infrastructure
2.47. It is Government policy to support the expansion of electronic communications networks. However, we would draw the Council's attention to the Written Ministerial Statement, 25th March 2015, which announced that local planning authorities preparing Local Plans, "should not set any additional standards or requirements relating to the construction, internal layout or performance of new dwellings."
2.48. The Local Planning Authority are only allowed to adopt the three optional technical standards, in relation to construction, internal layout and performance, subject to evidenced need and viability. As such, the Council should not seek higher standards than Building Regulations, as already referred to in our response to Policy BE03. Therefore, Policy BE10 is considered unsound because it is unjustified and contrary to national policy.
2.49. We are also unaware of National Policy requiring benches and bins to be connected to mobile digital infrastructure. As such the policy is unjustified and contrary to national policy.
2.50. Countryside are committed to ensuring that all developments go as far as is practical to meet national intentions to ensure the quality, practicality and future-proofing of new housing developments. We have concerns however that by introducing a wealth of additional planning policies in these areas, there will be unnecessary duplication to building regulations, and potentially delays to planning applications which will in turn impact on the timely delivery of new homes.
3. Site Deliverability
3.1. The site represents a deliverable, sustainable and achievable site for residential development. A number of technical reports and associated documents have been completed which demonstrate this. The below section provides a summary of these documents.
Density Study
3.2. A Density Study (January 2018) has been undertaken by JTP Architects.
3.3. As per Paragraph 2.23 of this representation, the Preferred Site Allocations Document (January 2018) states that the indicative dwelling yield of the site is 200 dwellings.
3.4. The Density Study confirms that the total site area is 8.02ha and the total developable area is 6.17ha. Furthermore, it confirms that the site can accommodate up to 250 dwellings with 180 dwellings on Site 023A and 40 dwellings on parcel 023B, which results in 40 dwellings per hectare and 25 dwellings per hectare, respectively.
3.5. The Density Study also provides a Developable Area Plan which illustrates the developable area, the existing trees and root protections areas (RPA), the easements and attenuation and drainage. The plan proposed that the most significant existing trees and foliage are retained.
3.6. Furthermore, the Study characterises the existing landscape features of Site 023A as three naturally formed developable areas. This natural formation will enable an orthogonal street pattern and regular frontage and a more efficient layout of a potentially higher density.
3.7. The study characterises Site 023B as a more irregular shape due to the present underground services. Furthermore, the Density Study identifies that the site has more constrained access opportunities. This has led to a more organic layout of a potentially lower density.
3.8. Given the evidence in the Density Study, the site could accommodate up to 250 dwellings. Further detail on how the site could present a sustainable development opportunity can be found in the summaries below.
Air Quality
3.9. An Air Quality Assessment was undertaken by Ardent Consulting Engineers in February 2017. The assessment reviews air quality constraints affecting the site.
3.10. The assessment concludes that it is unlikely that the proposed development will be considered high risk in terms of construction impacts. It also suggests that there has been a general improvement in local air quality over recent years which is evidenced by the monitored concentrations which are detailed within the report. Nevertheless, the assessment recommends that mitigation measures may need to be adopted as part of the development and be further considered in due course.
3.11. The assessment recommends that the impact of any potential increase in traffic flow on the local road network should be determined by way of a detailed air quality assessment.
3.12. Given the proximity of the A12, there is the potential for the introduction of a new exposure adjacent to the A12. This is dependent on the distance between individual units and the A12 which is to be addressed through careful design by the Architects.
Archaeology
3.13. An Archaeological Desk Based Assessment was undertaken by CGMS Consulting in November 2014.
3.14. The assessment confirms that the site does not lie within an area of archaeological priority, as previously designated by Brentwood Borough Council. It confirms that the site can be considered to have a modest potential for the late prehistoric.
3.15. The assessment also confirms that the site has remained undeveloped land through its documented history.
3.16. The assessment anticipates that Essex County Council archaeological advisors may request additional archaeological mitigation measures, initially in the form of a geophysical survey.
Desktop Noise Report
3.17. A Desktop Noise Report was completed by Ardent Consulting Engineers in March 2016.
3.18. The Noise Report concludes that subject to appropriate mitigation measures, the proposed internal and external areas of the proposed development could be demonstrated to be within desirable noise levels, subject to a detailed assessment.
3.19. The report states that ambient vibration levels may be a concern due to the sites proximity to the A12. These will need to be further addressed during more detailed assessment works.
3.20. Furthermore, a Noise Feasibility Plan has also been produced by Ardent Consulting Engineers. The plan provides a number of layout recommendations for Glazing, Ventilation, Rear Gardens and Balconies and Standalone Barriers. The Noise Feasibility Plan also outlines the closest possible building line on site which has reasonable attenuation and the recommended approximate minimum effective extent of an acoustic barrier. The plan also provides dimensions between the site and the nearest channel of the A12.
Drainage Strategy
3.21. A Drainage Strategy Technical Note was produced by Ardent Consulting Engineers in 2016. The note confirms that existing foul and surface water sewers navigate the site, together with a number of watercourses which will continue to serve the site, post development.
3.22. The report also confirms that the site is within Flood Zone 1 and is therefore suitable for residential development. The note suggests that subject to further investigation and detailed design, a Flood Risk Assessment and Detailed Drainage Strategy can be prepared to support a successful planning application for the development.
Phase 1 Habitat Survey
3.23. A Phase 1 Habitat Survey was produced by SES in 2014. The survey concluded that the habitats on site have the potential to be of value to protected species, as well as being of general biodiversity value themselves. As a result, the Phase 1 Habitat Survey recommends that the following works are undertaken;
* Reptiles (presence/likely absence survey - northern site only);
* Badgers (monitoring of setts on site);
* Bats (tree inspection surveys, activity surveys);
* Breeding Bird (walkover survey during breeding bird season, generally March to August); and
* Invertebrates (walkover survey to establish value for rate and vulnerable beetles).
3.24. It is considered within the survey that any potential adverse impacts from the proposed development upon specific protected species will be able to be wholly mitigated for with careful design.
Social Infrastructure Review
3.25. A Social Infrastructure Review was produced by Quod in February 2017. The review looked to provide an assessment of the likely impact of the development of the site on the demand for school places and healthcare provision.
3.26. The review confirms that based on average household sizes for the area, it is anticipated that the site could accommodate a resident population of approximately 600 people and generate demand for 68 primary school places and 45 secondary school places.
3.27. In line with this estimated growth, the review provides a summary of the education and healthcare provision within Brentwood.
3.28. The review states that although a number of existing primary schools in the Brentwood urban area are being expanded or are due to be expanded, Essex County Council is still expecting to be facing a deficit of places by 2020/21, with the Preferred Site Allocations Document stating that there is an estimated deficit of 541 places by 2021/2022 for Primary Schools. In terms of Secondary School Provision, the Preferred Site Allocations document states that there will be an estimated deficit of 9 places by 2021/22.
3.29. In terms of healthcare provision, the report confirms that the capacity to absorb additional demand arising from developments in the Brentwood Urban Area is limited. The Preferred Site Allocations document confirms this and states that there is likely to be significant pressures on GP Surgeries due to housing growth in the Borough throughout the lifetime of the plan.
Transport
3.30. A Transport Technical Note was prepared by Ardent Consulting Engineers in January 2018. The technical note provides an initial review of the anticipated highway and transportation impacts, based on a potential development of up to 250 dwellings at the site.
3.31. The note confirms that vehicular access to the site could be provided from Doddinghurst Road for the 23A of the site and provided via the extension of Karen Close and Russell Close at the 23B parcel.
3.32. In response to local concerns regarding the suitability of existing public transport provision, the note suggests that the site could generate an additional 7 peak hour bus trips and 35 peak hour rail trips. It is considered that there is sufficient capacity to accommodate these trips. The note confirms that there does not appear to be any specific issues relating to public transport.
3.33. The technical note confirms that the impacts on surrounding roads including Doddinghurst Road and Ongar Road would not be severe and should not be a reason for the site not to be allocated.
3.34. The note confirms that there are no highways issues that would prevent the site from being allocated for residential development in the emerging Local Development Plan.
3.35. The above studies demonstrate that the site is deliverable and sustainable.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Appendix 1: Local Development Plan Housing Trajectory
Representation ID: 24089
Received: 19/03/2019
Respondent: Countryside Properties
Agent: Strutt & Parker LLP
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Concerned to note that Dunton Hills Garden Village is anticipated to deliver housing completions from 2022/23, falling within the first five years of the plan. DHGV is a proposed major strategic development, intended to provide a new settlement supported by a range of facilities and infrastructure, and delivery of which will require a long process, therefore should not be relied on for short term housing delivery. To ensure the Local Plan is sound, there is a need for smaller sites to be supported by policies which will allow their short term delivery.
To ensure the Local Plan is sound, there is a need for smaller sites to be supported by policies which will allow their short term delivery.
1. Introduction
1.1 These representations are submitted by Strutt & Parker on behalf of Countryside Properties (UK) Ltd in relation to the Brentwood Borough Council Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our clients land at Doddinghurst Road (North & South of the A12), which has been allocated under Policy R16 & 17 of the PSLP. A plan showing the site is provided as Appendix A to this representation.
1.2 Countryside was founded in Essex 60 years ago by Alan Cherry and has since established a reputation for delivering high quality developments. With the ethos 'creating places people love', Countryside's achievements are exemplified through having won more Housing Design Awards than any other house builder.
1.3 Countryside is a major development and place-maker, having secured planning permission and building out developments in varying scales: from smaller 30 dwelling schemes on the edge of village's through to large urban extensions of 3,500 new homes plus associated community facilities. Countryside has a proven track record of delivery. The company is headquartered in Brentwood and has a proud legacy of local sites such as Clements Park and the Square on Hart Street.
1.4 The representations set out Countryside's position in relation to the residential site allocation of R16 and R17, both parcels of which fall within their control. The proposed allocation provides for around 200 dwellings and is an important contribution towards BBC's land supply for Brentwood Borough's Draft Plan. The representations provide comments on the relevant policies relating to those interests in the Draft Plan.
1.5 As the Council will be aware, representations have previously been made on behalf of Countryside Properties and in respect of the two parcels of land, towards the Preferred Options Consultation in October 2013 and the Strategic Growth Options Consultation February 2015, and the Regulation 18 Local Plan in March 2018. As a result of these representations, and the discussions that have been held with officers at Brentwood Borough Council alongside the Local Plan process, the two parcels either side of the A12 at Doddinghurst Road have been proposed as a housing allocation within PSLP. From here, the two parcels of land are referred to as "the site", in respect of their joint allocation and policy.
1.6 Countryside's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to the elements of the Housing and Development Management Policies and the housing trajectory relating to the delivery of Policy R16 and R17 during the Plan period.
1.7 Where such concerns are raised, specific changes to the relevant polices are sought and these are indicated in the following representations in order to assist the Council to make the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy.
1.8 Site 023A measures at approximately 5.99ha and Site 023B measures at approximately 2.2ha. The Council have defined the total net developable area of the two sites as 6.14ha. The site is currently designated as Green Belt in the adopted development plan.
1.9 The PSLP has recognised the sustainability of the site and enclosed character, and have therefore proposed it for removal from the Green Belt and for its allocation to provide housing. We support this allocation but do however have some concerns over other policies in the PSLP that may have implications for the efficient and timely delivery of this site.
2. Brentwood Local Plan Regulation 19 Consultation
Housing Need
2.1. Paragraph 4.13 of the PSLP states that the Borough's housing requirement is 350 dwellings per annum. Paragraph 4.12 confirms that this figure is calculated using the Standard Method (as per the NPPF and respective Planning Practice Guidance(PPG)). We note that the PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method (Paragraph: 004 Reference ID: 2a-004-20190220).
2.2. On this basis, the relevant subnational population projections indicate an average annual increase of 293.2 households in the Borough between 2019 and 2029. The latest (2017) ratio of median house price to median gross annual workplace-based earnings for the Borough published by the ONS is 11.23. Once the Standard Method is applied using these figures this results in a requirement of 452 dwellings per annum.
2.3. The NPPF requires Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change.
2.4. At paragraph 4.16 the PSLP considers it appropriate to apply a 20% uplift to the identified housing target of 350 dwellings per annum, resulting in a proposed target of 456 dwellings per annum. The rationale for this buffer is unclear with separate references to the buffer advising that it allows for an additional housing land supply to maintained, but also that it serves to safeguard against any potential uplift to the standard methodology for calculating housing need, pending the outcome of the Government's 'Technical consultation on updates to national planning policy and guidance'.
2.5. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility or Green Belt protection. Moreover, the figure does not allow provision for unmet need from neighbouring authorities in addition to the minimum requirement.
2.6. At 4.18 the PSLP confirms the Council have not been able to identify a five-year housing land supply to deliver the annualised requirement. Further to this, at 4.19 the PSLP confirms that there is a high proportion of designated Green Belt within the Borough, making it extremely difficult to achieve a five-year supply due to the fact that sites on the edge of settlements, currently within the Green Belt are not available for development purposes until the adoption of the Plan.
2.7. The Borough has a limited amount of previously developed land within its authority to provide for short term delivery, as such Green Belt release is required in order to meet the Authorities housing need and deliver within the short, medium and long term, as stated at paragraph 2.54 of the PSLP. The approach to amend the Green Belt boundaries is therefore supported.
2.8. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility, Green Belt protection or unmet need from neighbouring authorities in addition to the minimum requirement.
2.9. In respect of the above, whilst the current PSLP and associated housing allocations seek to go some way in delivering housing that will support the recognised needs of the Borough over the next 15 years, there is clearly a need to increase this provision. Whilst this could be helped through the identification of additional sites, ensuring the delivery and efficient use of the sites that are allocated for housing will also provide a degree of buffer. Further commentary and recommendations in this regard are provided later within this representation.
Five-year Housing Land Supply and Housing Trajectory
2.10. The Council is required to demonstrate a five-year housing land supply at any point in the plan period (Paragraph: 038 Reference ID: 3-038-20180913).
2.11. The NPPF (Paragraph 73) confirms that a 20% buffer should be applied to the initial calculation for a five-year housing land supply requirement, in the event that the results of the Housing Delivery Test show that there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. From November 2018, significant under delivery indicates that delivery was below 85% of the requirement for the Borough. The PPG (Paragraph: 037 Reference ID: 3-037-20180913) also confirms that the requirement for a 20% buffer also applies where a Local Planning Authority are seeking to confirm their five-year housing land supply through a recently adopted Local Plan.
2.12. The results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years and this is therefore well below the threshold for the 20% buffer requirement.
2.13. The Borough's most recent reported five-year housing land supply (Five Year Housing Land Supply Statement as at 31 March 2018 (November 2018) ('HLSS') is 4.1 years. This is predicated on a requirement which, when considered in relation to the latest guidance, understates need; and a supply which, again when considered in relation to latest guidance, overstates supply. As such, the actual housing land supply is noticeably less.
2.14. Looking at this in detail, the HLSS considers an annual need of 343 dwellings, resulting in a total requirement once the 20% has been applied of 2,058 dwellings. However, applying the latest guidance and the Standard Method, the Borough's housing requirement is 452 dwellings per annum. Applying the 20% buffer, this results in a five-year requirement of 2,712 dwellings.
2.15. In terms of supply, the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years. As per the Glossary contained within Annex 2 of the NPPF, such sites cannot be considerable deliverable for the purposes of the five-year housing land supply. Table 1 of the HLSS suggests that at least 1,042 dwellings in the reported supply did not have planning permission. Once these are removed from the supply calculation, the five-year supply comprises 653 dwellings. It is unclear if and how many of the dwellings categorised as having extant planning permission are on major sites which only benefit from outline permission. Such sites would also have to be discounted. As such, the figure of 653 dwellings may overstate housing supply.
2.16. A five-year supply of 653 dwellings compared to a requirement of 2,712 represents a 1.2-year housing land supply. This acute housing land supply shortage demonstrates the importance of allocating sites through the Local Plan which can delivery early in the plan period, and support the existing supply of housing. It also emphasises the need to avoid over-reliance on large strategic sites which inevitably take longer to deliver.
2.17. The housing trajectory provided as Appendix 1 to the PSLP projects that it will enable completion of 2,305 dwellings between 2019/20 and 2023/24.
2.18. Having regard to the Standard Method and the need to apply a 20% buffer to the housing requirement, the total five-year requirement for the Borough is 2,712 dwellings. Therefore, even before critical review of the supply, the PSLP will not provide a five-year supply of housing.
2.19. Furthermore, and in respect of the projected supply, we are concerned to note that Dunton Hills Garden Village is anticipated to deliver housing completions from 2022/23, falling within the first five years of the plan.
2.20. Dunton Hills Garden Village is a proposed major strategic development, intended to provide a new settlement supported by a range of facilities and infrastructure. Delivery will require the coordination and input of multiple landowners, developers, infrastructure providers and other stakeholders. Once allocated, the PSLP proposes a masterplan and design guidance will be required to be prepared to ensure that a cohesive approach is taken to the development of the Garden Village.
2.21. As such, it is a concern that 100 homes will be completed at Dunton Hills Garden Village as early as 2022/23. This does not in itself mean that Dunton Hills Garden Village proposals cannot form part of a sound Local Plan, but it does again demonstrate an inability to rely on large strategic sites for short term housing delivery, and emphasises the need for smaller sites to be supported by policies which will allow their short term delivery to ensure the Local Plan is sound.
Policy R16 & R17: Land off Doddinghurst Road
2.22. Policy R16 & R17 proposes the release of the site from the Green Belt and allocation for around 200 new homes. This approach is supported as an achievable and deliverable solution to contributing towards the Borough's housing land supply to meet the housing need requirement.
2.23. Having regard to the PSLP's housing trajectory, paragraph 9.160 the PSLP states the dwellings are anticipated to be delivered between 2023/24 and 2026/27. We do not support this assumption and object to the timing of the delivery of this site, as set out in the above mentioned paragraph and Appendix 1 of the PSLP. As the Council will be aware, representations have been made to earlier iterations of the emerging Local Plan to confirm the site is available, deliverable and achievable within the first five years of the plan period.
2.24. As currently proposed the trajectory is unsound in relation to this site, and as such is not justified. This is because the site can be delivered earlier than the stated timescales in Appendix 1 of the PSLP. In order to make the housing trajectory sound, amendments to the trajectory must be made to reflect the earlier delivery of the site in the plan period. The proposed amendments would result in a justified approach and a sound policy.
2.25. In addition to amending the housing trajectory to reflect the realistic and earlier delivery of the site, as proposed by a developer with an option on the land, the inclusion of the site within the first five years on the plan period will assist BBC with their five-year housing land supply position, not only assisting in housing delivery of the PSLP is effective and can be found sound at Examination.
Unit Numbers
2.26. Whilst we are supportive of the allocation, we raise concerns in relation to the wording of allocation policies such as Policy R16 & R17 should take this requirement for flexibility into account and worded as such to provide "at least 200 homes", as opposed to "around 200 homes". We consider that this would provide greater certainty on the number of homes to be delivered as part of each allocation for Brentwood Borough Council, and also allows for the delivery of additional units where appropriate opportunities may arise.
2.27. For sites R16 and R17, a significant amount of feasibility work has been undertaken to establish any site constraints, and as a result of this, Countryside are confident in the ability for the site to provide at least 250 homes. We have concerns that the respective policy's current format may be interpreted to confirm the optimum use of the site, rather than a lower limit. In fact, the 200-unit figure has been produced by Brentwood Borough Council with far less rationale and technical justification than has been undertaken by Countryside Properties and may lessen the ability of this site and other policies with similar wording to support Brentwood's need for a buffer and flexibility in their housing land supply.
Access
2.28. It is noted that there has been a change in wording of Part B (b) of Policy R16 & R17 from the November 2018 Proposed Submission Local Plan presented to Committee, and that now being consulted on (February 2019), with no explanation. The previous iteration of the policy required vehicular access to be provided from "Doddinghurst Road for both site and/or Karen Close and Russell Close". The current policy is worded to allow for vehicular access from Doddinghurst Road only.
2.29. Whilst access from Doddinghurst Road is accepted as the preferred strategy for all parties, initial appraisal work in this respect has recognised a potential requirement for significant levelling and land movement which could have implications on the viability of housing delivery on the site. It is therefore requested that the policy retains flexibility for the use of the other accesses from Karen Close and Russell Close as a worst case scenario, in the interests of protecting the deliverability of the southern parcel of the site, particularly as these routes of access have been previously agreed with Essex County Council Highways.
Policy SP03 Health Impact Assessments
2.30. The Policy requires planning applications for developments of 50 or more to be dwellings, non-residential development of 1,000sqm or more or schemes for C2 class developments to be supported by HIAs. The HBF response to this policy is unsupportive and they consider the policy to be unsound as it is not consistent with national policy and is ineffective.
2.31. We are in agreement with the HBF's response, dated 17th March 2019, in relation to the requirement for HIAs to be provided for 50 or more dwellings and consider the requirement to be unnecessary and an additional burden on applicants. Referring to the PPG we note that HIAs may be useful tools, however the PPG also expresses the importance of the local plan needing to consider the wider health issues in an area and ensuring the policies respond to these concerns. The guidance is provided below for completeness.
2.32. Paragraph: 002 Reference ID: 53-002-20140306 confirms that provision of the required health infrastructure should be supported and taken into account at local and neighbourhood plan making, and when determining planning applications.
2.33. Referring to National policy, paragraph 20 states that Strategic Policies should set out an overall strategy for the pattern, scale and quality of development, this includes infrastructure and community facilities.
2.34. In order for the local plan to be consistent with national policy, the Local Plan should already consider the impact of development on the health and wellbeing of the communities and any identified infrastructure should be addressed in policy. Therefore, whilst Countryside support the important consideration of health and wellbeing of communities where development is in line with the policies contained within the development plan a HIA should not be necessary. The requirement for a HIA should only be triggered where there is a departure from the plan, enabling the Council to assess any impacts on the health and well-being of the community as a result of said proposals.
Policy SP05 Construction Management
2.35. The Policy expects all major development schemes/developers to sign up to the Considerate Constructors Scheme, or equivalent. The scheme is a non-profit making, independent organisation which monitors construction sites signed up to the scheme, with the aim of managing and mitigating impacts arising from construction. This requirement is considered unjustified and inconsistent with national policy.
2.36. Whilst we recognise the importance of managing the potential impacts on construction sites, we consider this policy to be unsound because it is unjustified and not consistent with national policy. We would suggest that consideration for the scheme is best dealt with through planning applications and development management without it being written into formal planning policy.
2.37. We are not aware of any other adopted or emerging Local Plan which requires applicants and developers of major sites to enter into a specified construction management scheme and therefore question the reasonableness of this policy. The matter of construction management should be assessed on a case by case basis and should not be a matter for a strategic policy to prescribe. How a construction scheme is managed and mitigated should be an item for consideration by the decision taker and assessed on a case by case basis.
2.38. The imposition of Policy SP05 requires all major developments to be signed up to the Considerate Constructors Scheme regardless of the site or proposal details. It is recommended that this policy is removed.
Policy BE02 Sustainable Construction and Resource Efficiency
2.39. We consider the policy to be unsound as it is inconsistent with national policy. Part (f) of Policy BE02 requires the inclusion of renewable and decentralised energy as part of a new development, this is not consistent with national policy. Whilst Countryside recognise the importance of sustainable construction, a policy approach to such requirements does not allow for the appropriate flexibility in this regard, as recognised in the NPPF.
2.40. Paragraph 153 of the NPPF states that local plans can expect development to meet such provisions, however the NPPF also states that they are only required to comply with such policies where it is either feasible or viable. To ensure consistency with national policy part (f) of Policy BE02 should be amended to reflect this position.
Policy BE03 Carbon Reduction, Renewable Energy and Water Efficiency
2.41. It is Government policy to seek to deliver improvements to emissions from buildings through the building regulations regime. As such we do not consider it necessary to include the table at part (a) of this policy. Should a national zero carbon policy be introduced it will be achieved and applied through building regulations, as noted at paragraph 5.33.
2.42. We therefore echo those comments of the HBF's consultation response, dated 17th March 2019, and suggest that if the building regulations are updated then the Council should revisit the policy through a local plan review at that stage, but that such matters are dealt with through building regulations in the meantime to prevent unnecessary duplicate consideration of such matters through both planning and construction stages.
Policy BE04 Establishing Low Carbon and Renewable Energy Infrastructure Network
2.43. It is acknowledged that the Government support the transition to a low carbon future in a changing climate, including support towards renewable and low carbon energy and associated infrastructure. Countryside support these intentions.
2.44. Part (b) of Policy BE04 expects sites of over 500 dwellings, including where there are clusters of neighbouring sites that total over 500 units, shall incorporate decentralised energy infrastructure in line with a hierarchy however.
2.45. We raise concerns in relation to the deliverability of part (b) of the policy in relation to sites within a cluster of 500 or more dwellings given that neighbouring sites will not necessary come forward by multiple landowners and developers at similar times. The coordinating and implementation of a heat network to serve smaller scale sites as separate applications but adjacent to other similar sized sites in the locality, is unreasonable and unjustified and could result in a delay in delivery of new homes, resulting in an ineffective local plan.
2.46. It is recommended that the requirement for new development located where 'clusters' of neighbouring sites totals over 500 units should be removed from the policy in order to make the policy effective.
Policy BE10 Connecting New Developments to Digital Infrastructure
2.47. It is Government policy to support the expansion of electronic communications networks. However, we would draw the Council's attention to the Written Ministerial Statement, 25th March 2015, which announced that local planning authorities preparing Local Plans, "should not set any additional standards or requirements relating to the construction, internal layout or performance of new dwellings."
2.48. The Local Planning Authority are only allowed to adopt the three optional technical standards, in relation to construction, internal layout and performance, subject to evidenced need and viability. As such, the Council should not seek higher standards than Building Regulations, as already referred to in our response to Policy BE03. Therefore, Policy BE10 is considered unsound because it is unjustified and contrary to national policy.
2.49. We are also unaware of National Policy requiring benches and bins to be connected to mobile digital infrastructure. As such the policy is unjustified and contrary to national policy.
2.50. Countryside are committed to ensuring that all developments go as far as is practical to meet national intentions to ensure the quality, practicality and future-proofing of new housing developments. We have concerns however that by introducing a wealth of additional planning policies in these areas, there will be unnecessary duplication to building regulations, and potentially delays to planning applications which will in turn impact on the timely delivery of new homes.
3. Site Deliverability
3.1. The site represents a deliverable, sustainable and achievable site for residential development. A number of technical reports and associated documents have been completed which demonstrate this. The below section provides a summary of these documents.
Density Study
3.2. A Density Study (January 2018) has been undertaken by JTP Architects.
3.3. As per Paragraph 2.23 of this representation, the Preferred Site Allocations Document (January 2018) states that the indicative dwelling yield of the site is 200 dwellings.
3.4. The Density Study confirms that the total site area is 8.02ha and the total developable area is 6.17ha. Furthermore, it confirms that the site can accommodate up to 250 dwellings with 180 dwellings on Site 023A and 40 dwellings on parcel 023B, which results in 40 dwellings per hectare and 25 dwellings per hectare, respectively.
3.5. The Density Study also provides a Developable Area Plan which illustrates the developable area, the existing trees and root protections areas (RPA), the easements and attenuation and drainage. The plan proposed that the most significant existing trees and foliage are retained.
3.6. Furthermore, the Study characterises the existing landscape features of Site 023A as three naturally formed developable areas. This natural formation will enable an orthogonal street pattern and regular frontage and a more efficient layout of a potentially higher density.
3.7. The study characterises Site 023B as a more irregular shape due to the present underground services. Furthermore, the Density Study identifies that the site has more constrained access opportunities. This has led to a more organic layout of a potentially lower density.
3.8. Given the evidence in the Density Study, the site could accommodate up to 250 dwellings. Further detail on how the site could present a sustainable development opportunity can be found in the summaries below.
Air Quality
3.9. An Air Quality Assessment was undertaken by Ardent Consulting Engineers in February 2017. The assessment reviews air quality constraints affecting the site.
3.10. The assessment concludes that it is unlikely that the proposed development will be considered high risk in terms of construction impacts. It also suggests that there has been a general improvement in local air quality over recent years which is evidenced by the monitored concentrations which are detailed within the report. Nevertheless, the assessment recommends that mitigation measures may need to be adopted as part of the development and be further considered in due course.
3.11. The assessment recommends that the impact of any potential increase in traffic flow on the local road network should be determined by way of a detailed air quality assessment.
3.12. Given the proximity of the A12, there is the potential for the introduction of a new exposure adjacent to the A12. This is dependent on the distance between individual units and the A12 which is to be addressed through careful design by the Architects.
Archaeology
3.13. An Archaeological Desk Based Assessment was undertaken by CGMS Consulting in November 2014.
3.14. The assessment confirms that the site does not lie within an area of archaeological priority, as previously designated by Brentwood Borough Council. It confirms that the site can be considered to have a modest potential for the late prehistoric.
3.15. The assessment also confirms that the site has remained undeveloped land through its documented history.
3.16. The assessment anticipates that Essex County Council archaeological advisors may request additional archaeological mitigation measures, initially in the form of a geophysical survey.
Desktop Noise Report
3.17. A Desktop Noise Report was completed by Ardent Consulting Engineers in March 2016.
3.18. The Noise Report concludes that subject to appropriate mitigation measures, the proposed internal and external areas of the proposed development could be demonstrated to be within desirable noise levels, subject to a detailed assessment.
3.19. The report states that ambient vibration levels may be a concern due to the sites proximity to the A12. These will need to be further addressed during more detailed assessment works.
3.20. Furthermore, a Noise Feasibility Plan has also been produced by Ardent Consulting Engineers. The plan provides a number of layout recommendations for Glazing, Ventilation, Rear Gardens and Balconies and Standalone Barriers. The Noise Feasibility Plan also outlines the closest possible building line on site which has reasonable attenuation and the recommended approximate minimum effective extent of an acoustic barrier. The plan also provides dimensions between the site and the nearest channel of the A12.
Drainage Strategy
3.21. A Drainage Strategy Technical Note was produced by Ardent Consulting Engineers in 2016. The note confirms that existing foul and surface water sewers navigate the site, together with a number of watercourses which will continue to serve the site, post development.
3.22. The report also confirms that the site is within Flood Zone 1 and is therefore suitable for residential development. The note suggests that subject to further investigation and detailed design, a Flood Risk Assessment and Detailed Drainage Strategy can be prepared to support a successful planning application for the development.
Phase 1 Habitat Survey
3.23. A Phase 1 Habitat Survey was produced by SES in 2014. The survey concluded that the habitats on site have the potential to be of value to protected species, as well as being of general biodiversity value themselves. As a result, the Phase 1 Habitat Survey recommends that the following works are undertaken;
* Reptiles (presence/likely absence survey - northern site only);
* Badgers (monitoring of setts on site);
* Bats (tree inspection surveys, activity surveys);
* Breeding Bird (walkover survey during breeding bird season, generally March to August); and
* Invertebrates (walkover survey to establish value for rate and vulnerable beetles).
3.24. It is considered within the survey that any potential adverse impacts from the proposed development upon specific protected species will be able to be wholly mitigated for with careful design.
Social Infrastructure Review
3.25. A Social Infrastructure Review was produced by Quod in February 2017. The review looked to provide an assessment of the likely impact of the development of the site on the demand for school places and healthcare provision.
3.26. The review confirms that based on average household sizes for the area, it is anticipated that the site could accommodate a resident population of approximately 600 people and generate demand for 68 primary school places and 45 secondary school places.
3.27. In line with this estimated growth, the review provides a summary of the education and healthcare provision within Brentwood.
3.28. The review states that although a number of existing primary schools in the Brentwood urban area are being expanded or are due to be expanded, Essex County Council is still expecting to be facing a deficit of places by 2020/21, with the Preferred Site Allocations Document stating that there is an estimated deficit of 541 places by 2021/2022 for Primary Schools. In terms of Secondary School Provision, the Preferred Site Allocations document states that there will be an estimated deficit of 9 places by 2021/22.
3.29. In terms of healthcare provision, the report confirms that the capacity to absorb additional demand arising from developments in the Brentwood Urban Area is limited. The Preferred Site Allocations document confirms this and states that there is likely to be significant pressures on GP Surgeries due to housing growth in the Borough throughout the lifetime of the plan.
Transport
3.30. A Transport Technical Note was prepared by Ardent Consulting Engineers in January 2018. The technical note provides an initial review of the anticipated highway and transportation impacts, based on a potential development of up to 250 dwellings at the site.
3.31. The note confirms that vehicular access to the site could be provided from Doddinghurst Road for the 23A of the site and provided via the extension of Karen Close and Russell Close at the 23B parcel.
3.32. In response to local concerns regarding the suitability of existing public transport provision, the note suggests that the site could generate an additional 7 peak hour bus trips and 35 peak hour rail trips. It is considered that there is sufficient capacity to accommodate these trips. The note confirms that there does not appear to be any specific issues relating to public transport.
3.33. The technical note confirms that the impacts on surrounding roads including Doddinghurst Road and Ongar Road would not be severe and should not be a reason for the site not to be allocated.
3.34. The note confirms that there are no highways issues that would prevent the site from being allocated for residential development in the emerging Local Development Plan.
3.35. The above studies demonstrate that the site is deliverable and sustainable.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Appendix 1: Local Development Plan Housing Trajectory
Representation ID: 24090
Received: 19/03/2019
Respondent: Countryside Properties
Agent: Strutt & Parker LLP
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Site R16&17can be delivered earlier than the stated timescales in Appendix 1 of the PSLP. In order to make the housing trajectory sound, amendments to the trajectory must be made to reflect the earlier delivery of the site in the plan period.
Amendments to the trajectory must be made to reflect the earlier delivery of site R16&17 in the plan period.
1. Introduction
1.1 These representations are submitted by Strutt & Parker on behalf of Countryside Properties (UK) Ltd in relation to the Brentwood Borough Council Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our clients land at Doddinghurst Road (North & South of the A12), which has been allocated under Policy R16 & 17 of the PSLP. A plan showing the site is provided as Appendix A to this representation.
1.2 Countryside was founded in Essex 60 years ago by Alan Cherry and has since established a reputation for delivering high quality developments. With the ethos 'creating places people love', Countryside's achievements are exemplified through having won more Housing Design Awards than any other house builder.
1.3 Countryside is a major development and place-maker, having secured planning permission and building out developments in varying scales: from smaller 30 dwelling schemes on the edge of village's through to large urban extensions of 3,500 new homes plus associated community facilities. Countryside has a proven track record of delivery. The company is headquartered in Brentwood and has a proud legacy of local sites such as Clements Park and the Square on Hart Street.
1.4 The representations set out Countryside's position in relation to the residential site allocation of R16 and R17, both parcels of which fall within their control. The proposed allocation provides for around 200 dwellings and is an important contribution towards BBC's land supply for Brentwood Borough's Draft Plan. The representations provide comments on the relevant policies relating to those interests in the Draft Plan.
1.5 As the Council will be aware, representations have previously been made on behalf of Countryside Properties and in respect of the two parcels of land, towards the Preferred Options Consultation in October 2013 and the Strategic Growth Options Consultation February 2015, and the Regulation 18 Local Plan in March 2018. As a result of these representations, and the discussions that have been held with officers at Brentwood Borough Council alongside the Local Plan process, the two parcels either side of the A12 at Doddinghurst Road have been proposed as a housing allocation within PSLP. From here, the two parcels of land are referred to as "the site", in respect of their joint allocation and policy.
1.6 Countryside's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to the elements of the Housing and Development Management Policies and the housing trajectory relating to the delivery of Policy R16 and R17 during the Plan period.
1.7 Where such concerns are raised, specific changes to the relevant polices are sought and these are indicated in the following representations in order to assist the Council to make the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy.
1.8 Site 023A measures at approximately 5.99ha and Site 023B measures at approximately 2.2ha. The Council have defined the total net developable area of the two sites as 6.14ha. The site is currently designated as Green Belt in the adopted development plan.
1.9 The PSLP has recognised the sustainability of the site and enclosed character, and have therefore proposed it for removal from the Green Belt and for its allocation to provide housing. We support this allocation but do however have some concerns over other policies in the PSLP that may have implications for the efficient and timely delivery of this site.
2. Brentwood Local Plan Regulation 19 Consultation
Housing Need
2.1. Paragraph 4.13 of the PSLP states that the Borough's housing requirement is 350 dwellings per annum. Paragraph 4.12 confirms that this figure is calculated using the Standard Method (as per the NPPF and respective Planning Practice Guidance(PPG)). We note that the PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method (Paragraph: 004 Reference ID: 2a-004-20190220).
2.2. On this basis, the relevant subnational population projections indicate an average annual increase of 293.2 households in the Borough between 2019 and 2029. The latest (2017) ratio of median house price to median gross annual workplace-based earnings for the Borough published by the ONS is 11.23. Once the Standard Method is applied using these figures this results in a requirement of 452 dwellings per annum.
2.3. The NPPF requires Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change.
2.4. At paragraph 4.16 the PSLP considers it appropriate to apply a 20% uplift to the identified housing target of 350 dwellings per annum, resulting in a proposed target of 456 dwellings per annum. The rationale for this buffer is unclear with separate references to the buffer advising that it allows for an additional housing land supply to maintained, but also that it serves to safeguard against any potential uplift to the standard methodology for calculating housing need, pending the outcome of the Government's 'Technical consultation on updates to national planning policy and guidance'.
2.5. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility or Green Belt protection. Moreover, the figure does not allow provision for unmet need from neighbouring authorities in addition to the minimum requirement.
2.6. At 4.18 the PSLP confirms the Council have not been able to identify a five-year housing land supply to deliver the annualised requirement. Further to this, at 4.19 the PSLP confirms that there is a high proportion of designated Green Belt within the Borough, making it extremely difficult to achieve a five-year supply due to the fact that sites on the edge of settlements, currently within the Green Belt are not available for development purposes until the adoption of the Plan.
2.7. The Borough has a limited amount of previously developed land within its authority to provide for short term delivery, as such Green Belt release is required in order to meet the Authorities housing need and deliver within the short, medium and long term, as stated at paragraph 2.54 of the PSLP. The approach to amend the Green Belt boundaries is therefore supported.
2.8. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility, Green Belt protection or unmet need from neighbouring authorities in addition to the minimum requirement.
2.9. In respect of the above, whilst the current PSLP and associated housing allocations seek to go some way in delivering housing that will support the recognised needs of the Borough over the next 15 years, there is clearly a need to increase this provision. Whilst this could be helped through the identification of additional sites, ensuring the delivery and efficient use of the sites that are allocated for housing will also provide a degree of buffer. Further commentary and recommendations in this regard are provided later within this representation.
Five-year Housing Land Supply and Housing Trajectory
2.10. The Council is required to demonstrate a five-year housing land supply at any point in the plan period (Paragraph: 038 Reference ID: 3-038-20180913).
2.11. The NPPF (Paragraph 73) confirms that a 20% buffer should be applied to the initial calculation for a five-year housing land supply requirement, in the event that the results of the Housing Delivery Test show that there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. From November 2018, significant under delivery indicates that delivery was below 85% of the requirement for the Borough. The PPG (Paragraph: 037 Reference ID: 3-037-20180913) also confirms that the requirement for a 20% buffer also applies where a Local Planning Authority are seeking to confirm their five-year housing land supply through a recently adopted Local Plan.
2.12. The results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years and this is therefore well below the threshold for the 20% buffer requirement.
2.13. The Borough's most recent reported five-year housing land supply (Five Year Housing Land Supply Statement as at 31 March 2018 (November 2018) ('HLSS') is 4.1 years. This is predicated on a requirement which, when considered in relation to the latest guidance, understates need; and a supply which, again when considered in relation to latest guidance, overstates supply. As such, the actual housing land supply is noticeably less.
2.14. Looking at this in detail, the HLSS considers an annual need of 343 dwellings, resulting in a total requirement once the 20% has been applied of 2,058 dwellings. However, applying the latest guidance and the Standard Method, the Borough's housing requirement is 452 dwellings per annum. Applying the 20% buffer, this results in a five-year requirement of 2,712 dwellings.
2.15. In terms of supply, the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years. As per the Glossary contained within Annex 2 of the NPPF, such sites cannot be considerable deliverable for the purposes of the five-year housing land supply. Table 1 of the HLSS suggests that at least 1,042 dwellings in the reported supply did not have planning permission. Once these are removed from the supply calculation, the five-year supply comprises 653 dwellings. It is unclear if and how many of the dwellings categorised as having extant planning permission are on major sites which only benefit from outline permission. Such sites would also have to be discounted. As such, the figure of 653 dwellings may overstate housing supply.
2.16. A five-year supply of 653 dwellings compared to a requirement of 2,712 represents a 1.2-year housing land supply. This acute housing land supply shortage demonstrates the importance of allocating sites through the Local Plan which can delivery early in the plan period, and support the existing supply of housing. It also emphasises the need to avoid over-reliance on large strategic sites which inevitably take longer to deliver.
2.17. The housing trajectory provided as Appendix 1 to the PSLP projects that it will enable completion of 2,305 dwellings between 2019/20 and 2023/24.
2.18. Having regard to the Standard Method and the need to apply a 20% buffer to the housing requirement, the total five-year requirement for the Borough is 2,712 dwellings. Therefore, even before critical review of the supply, the PSLP will not provide a five-year supply of housing.
2.19. Furthermore, and in respect of the projected supply, we are concerned to note that Dunton Hills Garden Village is anticipated to deliver housing completions from 2022/23, falling within the first five years of the plan.
2.20. Dunton Hills Garden Village is a proposed major strategic development, intended to provide a new settlement supported by a range of facilities and infrastructure. Delivery will require the coordination and input of multiple landowners, developers, infrastructure providers and other stakeholders. Once allocated, the PSLP proposes a masterplan and design guidance will be required to be prepared to ensure that a cohesive approach is taken to the development of the Garden Village.
2.21. As such, it is a concern that 100 homes will be completed at Dunton Hills Garden Village as early as 2022/23. This does not in itself mean that Dunton Hills Garden Village proposals cannot form part of a sound Local Plan, but it does again demonstrate an inability to rely on large strategic sites for short term housing delivery, and emphasises the need for smaller sites to be supported by policies which will allow their short term delivery to ensure the Local Plan is sound.
Policy R16 & R17: Land off Doddinghurst Road
2.22. Policy R16 & R17 proposes the release of the site from the Green Belt and allocation for around 200 new homes. This approach is supported as an achievable and deliverable solution to contributing towards the Borough's housing land supply to meet the housing need requirement.
2.23. Having regard to the PSLP's housing trajectory, paragraph 9.160 the PSLP states the dwellings are anticipated to be delivered between 2023/24 and 2026/27. We do not support this assumption and object to the timing of the delivery of this site, as set out in the above mentioned paragraph and Appendix 1 of the PSLP. As the Council will be aware, representations have been made to earlier iterations of the emerging Local Plan to confirm the site is available, deliverable and achievable within the first five years of the plan period.
2.24. As currently proposed the trajectory is unsound in relation to this site, and as such is not justified. This is because the site can be delivered earlier than the stated timescales in Appendix 1 of the PSLP. In order to make the housing trajectory sound, amendments to the trajectory must be made to reflect the earlier delivery of the site in the plan period. The proposed amendments would result in a justified approach and a sound policy.
2.25. In addition to amending the housing trajectory to reflect the realistic and earlier delivery of the site, as proposed by a developer with an option on the land, the inclusion of the site within the first five years on the plan period will assist BBC with their five-year housing land supply position, not only assisting in housing delivery of the PSLP is effective and can be found sound at Examination.
Unit Numbers
2.26. Whilst we are supportive of the allocation, we raise concerns in relation to the wording of allocation policies such as Policy R16 & R17 should take this requirement for flexibility into account and worded as such to provide "at least 200 homes", as opposed to "around 200 homes". We consider that this would provide greater certainty on the number of homes to be delivered as part of each allocation for Brentwood Borough Council, and also allows for the delivery of additional units where appropriate opportunities may arise.
2.27. For sites R16 and R17, a significant amount of feasibility work has been undertaken to establish any site constraints, and as a result of this, Countryside are confident in the ability for the site to provide at least 250 homes. We have concerns that the respective policy's current format may be interpreted to confirm the optimum use of the site, rather than a lower limit. In fact, the 200-unit figure has been produced by Brentwood Borough Council with far less rationale and technical justification than has been undertaken by Countryside Properties and may lessen the ability of this site and other policies with similar wording to support Brentwood's need for a buffer and flexibility in their housing land supply.
Access
2.28. It is noted that there has been a change in wording of Part B (b) of Policy R16 & R17 from the November 2018 Proposed Submission Local Plan presented to Committee, and that now being consulted on (February 2019), with no explanation. The previous iteration of the policy required vehicular access to be provided from "Doddinghurst Road for both site and/or Karen Close and Russell Close". The current policy is worded to allow for vehicular access from Doddinghurst Road only.
2.29. Whilst access from Doddinghurst Road is accepted as the preferred strategy for all parties, initial appraisal work in this respect has recognised a potential requirement for significant levelling and land movement which could have implications on the viability of housing delivery on the site. It is therefore requested that the policy retains flexibility for the use of the other accesses from Karen Close and Russell Close as a worst case scenario, in the interests of protecting the deliverability of the southern parcel of the site, particularly as these routes of access have been previously agreed with Essex County Council Highways.
Policy SP03 Health Impact Assessments
2.30. The Policy requires planning applications for developments of 50 or more to be dwellings, non-residential development of 1,000sqm or more or schemes for C2 class developments to be supported by HIAs. The HBF response to this policy is unsupportive and they consider the policy to be unsound as it is not consistent with national policy and is ineffective.
2.31. We are in agreement with the HBF's response, dated 17th March 2019, in relation to the requirement for HIAs to be provided for 50 or more dwellings and consider the requirement to be unnecessary and an additional burden on applicants. Referring to the PPG we note that HIAs may be useful tools, however the PPG also expresses the importance of the local plan needing to consider the wider health issues in an area and ensuring the policies respond to these concerns. The guidance is provided below for completeness.
2.32. Paragraph: 002 Reference ID: 53-002-20140306 confirms that provision of the required health infrastructure should be supported and taken into account at local and neighbourhood plan making, and when determining planning applications.
2.33. Referring to National policy, paragraph 20 states that Strategic Policies should set out an overall strategy for the pattern, scale and quality of development, this includes infrastructure and community facilities.
2.34. In order for the local plan to be consistent with national policy, the Local Plan should already consider the impact of development on the health and wellbeing of the communities and any identified infrastructure should be addressed in policy. Therefore, whilst Countryside support the important consideration of health and wellbeing of communities where development is in line with the policies contained within the development plan a HIA should not be necessary. The requirement for a HIA should only be triggered where there is a departure from the plan, enabling the Council to assess any impacts on the health and well-being of the community as a result of said proposals.
Policy SP05 Construction Management
2.35. The Policy expects all major development schemes/developers to sign up to the Considerate Constructors Scheme, or equivalent. The scheme is a non-profit making, independent organisation which monitors construction sites signed up to the scheme, with the aim of managing and mitigating impacts arising from construction. This requirement is considered unjustified and inconsistent with national policy.
2.36. Whilst we recognise the importance of managing the potential impacts on construction sites, we consider this policy to be unsound because it is unjustified and not consistent with national policy. We would suggest that consideration for the scheme is best dealt with through planning applications and development management without it being written into formal planning policy.
2.37. We are not aware of any other adopted or emerging Local Plan which requires applicants and developers of major sites to enter into a specified construction management scheme and therefore question the reasonableness of this policy. The matter of construction management should be assessed on a case by case basis and should not be a matter for a strategic policy to prescribe. How a construction scheme is managed and mitigated should be an item for consideration by the decision taker and assessed on a case by case basis.
2.38. The imposition of Policy SP05 requires all major developments to be signed up to the Considerate Constructors Scheme regardless of the site or proposal details. It is recommended that this policy is removed.
Policy BE02 Sustainable Construction and Resource Efficiency
2.39. We consider the policy to be unsound as it is inconsistent with national policy. Part (f) of Policy BE02 requires the inclusion of renewable and decentralised energy as part of a new development, this is not consistent with national policy. Whilst Countryside recognise the importance of sustainable construction, a policy approach to such requirements does not allow for the appropriate flexibility in this regard, as recognised in the NPPF.
2.40. Paragraph 153 of the NPPF states that local plans can expect development to meet such provisions, however the NPPF also states that they are only required to comply with such policies where it is either feasible or viable. To ensure consistency with national policy part (f) of Policy BE02 should be amended to reflect this position.
Policy BE03 Carbon Reduction, Renewable Energy and Water Efficiency
2.41. It is Government policy to seek to deliver improvements to emissions from buildings through the building regulations regime. As such we do not consider it necessary to include the table at part (a) of this policy. Should a national zero carbon policy be introduced it will be achieved and applied through building regulations, as noted at paragraph 5.33.
2.42. We therefore echo those comments of the HBF's consultation response, dated 17th March 2019, and suggest that if the building regulations are updated then the Council should revisit the policy through a local plan review at that stage, but that such matters are dealt with through building regulations in the meantime to prevent unnecessary duplicate consideration of such matters through both planning and construction stages.
Policy BE04 Establishing Low Carbon and Renewable Energy Infrastructure Network
2.43. It is acknowledged that the Government support the transition to a low carbon future in a changing climate, including support towards renewable and low carbon energy and associated infrastructure. Countryside support these intentions.
2.44. Part (b) of Policy BE04 expects sites of over 500 dwellings, including where there are clusters of neighbouring sites that total over 500 units, shall incorporate decentralised energy infrastructure in line with a hierarchy however.
2.45. We raise concerns in relation to the deliverability of part (b) of the policy in relation to sites within a cluster of 500 or more dwellings given that neighbouring sites will not necessary come forward by multiple landowners and developers at similar times. The coordinating and implementation of a heat network to serve smaller scale sites as separate applications but adjacent to other similar sized sites in the locality, is unreasonable and unjustified and could result in a delay in delivery of new homes, resulting in an ineffective local plan.
2.46. It is recommended that the requirement for new development located where 'clusters' of neighbouring sites totals over 500 units should be removed from the policy in order to make the policy effective.
Policy BE10 Connecting New Developments to Digital Infrastructure
2.47. It is Government policy to support the expansion of electronic communications networks. However, we would draw the Council's attention to the Written Ministerial Statement, 25th March 2015, which announced that local planning authorities preparing Local Plans, "should not set any additional standards or requirements relating to the construction, internal layout or performance of new dwellings."
2.48. The Local Planning Authority are only allowed to adopt the three optional technical standards, in relation to construction, internal layout and performance, subject to evidenced need and viability. As such, the Council should not seek higher standards than Building Regulations, as already referred to in our response to Policy BE03. Therefore, Policy BE10 is considered unsound because it is unjustified and contrary to national policy.
2.49. We are also unaware of National Policy requiring benches and bins to be connected to mobile digital infrastructure. As such the policy is unjustified and contrary to national policy.
2.50. Countryside are committed to ensuring that all developments go as far as is practical to meet national intentions to ensure the quality, practicality and future-proofing of new housing developments. We have concerns however that by introducing a wealth of additional planning policies in these areas, there will be unnecessary duplication to building regulations, and potentially delays to planning applications which will in turn impact on the timely delivery of new homes.
3. Site Deliverability
3.1. The site represents a deliverable, sustainable and achievable site for residential development. A number of technical reports and associated documents have been completed which demonstrate this. The below section provides a summary of these documents.
Density Study
3.2. A Density Study (January 2018) has been undertaken by JTP Architects.
3.3. As per Paragraph 2.23 of this representation, the Preferred Site Allocations Document (January 2018) states that the indicative dwelling yield of the site is 200 dwellings.
3.4. The Density Study confirms that the total site area is 8.02ha and the total developable area is 6.17ha. Furthermore, it confirms that the site can accommodate up to 250 dwellings with 180 dwellings on Site 023A and 40 dwellings on parcel 023B, which results in 40 dwellings per hectare and 25 dwellings per hectare, respectively.
3.5. The Density Study also provides a Developable Area Plan which illustrates the developable area, the existing trees and root protections areas (RPA), the easements and attenuation and drainage. The plan proposed that the most significant existing trees and foliage are retained.
3.6. Furthermore, the Study characterises the existing landscape features of Site 023A as three naturally formed developable areas. This natural formation will enable an orthogonal street pattern and regular frontage and a more efficient layout of a potentially higher density.
3.7. The study characterises Site 023B as a more irregular shape due to the present underground services. Furthermore, the Density Study identifies that the site has more constrained access opportunities. This has led to a more organic layout of a potentially lower density.
3.8. Given the evidence in the Density Study, the site could accommodate up to 250 dwellings. Further detail on how the site could present a sustainable development opportunity can be found in the summaries below.
Air Quality
3.9. An Air Quality Assessment was undertaken by Ardent Consulting Engineers in February 2017. The assessment reviews air quality constraints affecting the site.
3.10. The assessment concludes that it is unlikely that the proposed development will be considered high risk in terms of construction impacts. It also suggests that there has been a general improvement in local air quality over recent years which is evidenced by the monitored concentrations which are detailed within the report. Nevertheless, the assessment recommends that mitigation measures may need to be adopted as part of the development and be further considered in due course.
3.11. The assessment recommends that the impact of any potential increase in traffic flow on the local road network should be determined by way of a detailed air quality assessment.
3.12. Given the proximity of the A12, there is the potential for the introduction of a new exposure adjacent to the A12. This is dependent on the distance between individual units and the A12 which is to be addressed through careful design by the Architects.
Archaeology
3.13. An Archaeological Desk Based Assessment was undertaken by CGMS Consulting in November 2014.
3.14. The assessment confirms that the site does not lie within an area of archaeological priority, as previously designated by Brentwood Borough Council. It confirms that the site can be considered to have a modest potential for the late prehistoric.
3.15. The assessment also confirms that the site has remained undeveloped land through its documented history.
3.16. The assessment anticipates that Essex County Council archaeological advisors may request additional archaeological mitigation measures, initially in the form of a geophysical survey.
Desktop Noise Report
3.17. A Desktop Noise Report was completed by Ardent Consulting Engineers in March 2016.
3.18. The Noise Report concludes that subject to appropriate mitigation measures, the proposed internal and external areas of the proposed development could be demonstrated to be within desirable noise levels, subject to a detailed assessment.
3.19. The report states that ambient vibration levels may be a concern due to the sites proximity to the A12. These will need to be further addressed during more detailed assessment works.
3.20. Furthermore, a Noise Feasibility Plan has also been produced by Ardent Consulting Engineers. The plan provides a number of layout recommendations for Glazing, Ventilation, Rear Gardens and Balconies and Standalone Barriers. The Noise Feasibility Plan also outlines the closest possible building line on site which has reasonable attenuation and the recommended approximate minimum effective extent of an acoustic barrier. The plan also provides dimensions between the site and the nearest channel of the A12.
Drainage Strategy
3.21. A Drainage Strategy Technical Note was produced by Ardent Consulting Engineers in 2016. The note confirms that existing foul and surface water sewers navigate the site, together with a number of watercourses which will continue to serve the site, post development.
3.22. The report also confirms that the site is within Flood Zone 1 and is therefore suitable for residential development. The note suggests that subject to further investigation and detailed design, a Flood Risk Assessment and Detailed Drainage Strategy can be prepared to support a successful planning application for the development.
Phase 1 Habitat Survey
3.23. A Phase 1 Habitat Survey was produced by SES in 2014. The survey concluded that the habitats on site have the potential to be of value to protected species, as well as being of general biodiversity value themselves. As a result, the Phase 1 Habitat Survey recommends that the following works are undertaken;
* Reptiles (presence/likely absence survey - northern site only);
* Badgers (monitoring of setts on site);
* Bats (tree inspection surveys, activity surveys);
* Breeding Bird (walkover survey during breeding bird season, generally March to August); and
* Invertebrates (walkover survey to establish value for rate and vulnerable beetles).
3.24. It is considered within the survey that any potential adverse impacts from the proposed development upon specific protected species will be able to be wholly mitigated for with careful design.
Social Infrastructure Review
3.25. A Social Infrastructure Review was produced by Quod in February 2017. The review looked to provide an assessment of the likely impact of the development of the site on the demand for school places and healthcare provision.
3.26. The review confirms that based on average household sizes for the area, it is anticipated that the site could accommodate a resident population of approximately 600 people and generate demand for 68 primary school places and 45 secondary school places.
3.27. In line with this estimated growth, the review provides a summary of the education and healthcare provision within Brentwood.
3.28. The review states that although a number of existing primary schools in the Brentwood urban area are being expanded or are due to be expanded, Essex County Council is still expecting to be facing a deficit of places by 2020/21, with the Preferred Site Allocations Document stating that there is an estimated deficit of 541 places by 2021/2022 for Primary Schools. In terms of Secondary School Provision, the Preferred Site Allocations document states that there will be an estimated deficit of 9 places by 2021/22.
3.29. In terms of healthcare provision, the report confirms that the capacity to absorb additional demand arising from developments in the Brentwood Urban Area is limited. The Preferred Site Allocations document confirms this and states that there is likely to be significant pressures on GP Surgeries due to housing growth in the Borough throughout the lifetime of the plan.
Transport
3.30. A Transport Technical Note was prepared by Ardent Consulting Engineers in January 2018. The technical note provides an initial review of the anticipated highway and transportation impacts, based on a potential development of up to 250 dwellings at the site.
3.31. The note confirms that vehicular access to the site could be provided from Doddinghurst Road for the 23A of the site and provided via the extension of Karen Close and Russell Close at the 23B parcel.
3.32. In response to local concerns regarding the suitability of existing public transport provision, the note suggests that the site could generate an additional 7 peak hour bus trips and 35 peak hour rail trips. It is considered that there is sufficient capacity to accommodate these trips. The note confirms that there does not appear to be any specific issues relating to public transport.
3.33. The technical note confirms that the impacts on surrounding roads including Doddinghurst Road and Ongar Road would not be severe and should not be a reason for the site not to be allocated.
3.34. The note confirms that there are no highways issues that would prevent the site from being allocated for residential development in the emerging Local Development Plan.
3.35. The above studies demonstrate that the site is deliverable and sustainable.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
POLICY SP03: HEALTH IMPACT ASSESSMENTS (HIAs)
Representation ID: 24091
Received: 19/03/2019
Respondent: Countryside Properties
Agent: Strutt & Parker LLP
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
The HBF response to this policy is unsupportive and they consider the policy to be unsound as it is not consistent with national policy and is ineffective. The requirement for HIAs as set out in Policy SP03 is unnecessary and an additional burden on applicants. In order for the local plan to be consistent with national policy, the Local Plan should already consider the impact of development on the health and wellbeing of the communities and any identified infrastructure should be addressed. The requirement for a HIA should only be triggered where there is a departure from the plan.
The requirement for a HIA should only be triggered where there is a departure from the plan, enabling the Council to assess any impacts on the health and wellbeing of the community as a result of said proposals.
1. Introduction
1.1 These representations are submitted by Strutt & Parker on behalf of Countryside Properties (UK) Ltd in relation to the Brentwood Borough Council Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our clients land at Doddinghurst Road (North & South of the A12), which has been allocated under Policy R16 & 17 of the PSLP. A plan showing the site is provided as Appendix A to this representation.
1.2 Countryside was founded in Essex 60 years ago by Alan Cherry and has since established a reputation for delivering high quality developments. With the ethos 'creating places people love', Countryside's achievements are exemplified through having won more Housing Design Awards than any other house builder.
1.3 Countryside is a major development and place-maker, having secured planning permission and building out developments in varying scales: from smaller 30 dwelling schemes on the edge of village's through to large urban extensions of 3,500 new homes plus associated community facilities. Countryside has a proven track record of delivery. The company is headquartered in Brentwood and has a proud legacy of local sites such as Clements Park and the Square on Hart Street.
1.4 The representations set out Countryside's position in relation to the residential site allocation of R16 and R17, both parcels of which fall within their control. The proposed allocation provides for around 200 dwellings and is an important contribution towards BBC's land supply for Brentwood Borough's Draft Plan. The representations provide comments on the relevant policies relating to those interests in the Draft Plan.
1.5 As the Council will be aware, representations have previously been made on behalf of Countryside Properties and in respect of the two parcels of land, towards the Preferred Options Consultation in October 2013 and the Strategic Growth Options Consultation February 2015, and the Regulation 18 Local Plan in March 2018. As a result of these representations, and the discussions that have been held with officers at Brentwood Borough Council alongside the Local Plan process, the two parcels either side of the A12 at Doddinghurst Road have been proposed as a housing allocation within PSLP. From here, the two parcels of land are referred to as "the site", in respect of their joint allocation and policy.
1.6 Countryside's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to the elements of the Housing and Development Management Policies and the housing trajectory relating to the delivery of Policy R16 and R17 during the Plan period.
1.7 Where such concerns are raised, specific changes to the relevant polices are sought and these are indicated in the following representations in order to assist the Council to make the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy.
1.8 Site 023A measures at approximately 5.99ha and Site 023B measures at approximately 2.2ha. The Council have defined the total net developable area of the two sites as 6.14ha. The site is currently designated as Green Belt in the adopted development plan.
1.9 The PSLP has recognised the sustainability of the site and enclosed character, and have therefore proposed it for removal from the Green Belt and for its allocation to provide housing. We support this allocation but do however have some concerns over other policies in the PSLP that may have implications for the efficient and timely delivery of this site.
2. Brentwood Local Plan Regulation 19 Consultation
Housing Need
2.1. Paragraph 4.13 of the PSLP states that the Borough's housing requirement is 350 dwellings per annum. Paragraph 4.12 confirms that this figure is calculated using the Standard Method (as per the NPPF and respective Planning Practice Guidance(PPG)). We note that the PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method (Paragraph: 004 Reference ID: 2a-004-20190220).
2.2. On this basis, the relevant subnational population projections indicate an average annual increase of 293.2 households in the Borough between 2019 and 2029. The latest (2017) ratio of median house price to median gross annual workplace-based earnings for the Borough published by the ONS is 11.23. Once the Standard Method is applied using these figures this results in a requirement of 452 dwellings per annum.
2.3. The NPPF requires Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change.
2.4. At paragraph 4.16 the PSLP considers it appropriate to apply a 20% uplift to the identified housing target of 350 dwellings per annum, resulting in a proposed target of 456 dwellings per annum. The rationale for this buffer is unclear with separate references to the buffer advising that it allows for an additional housing land supply to maintained, but also that it serves to safeguard against any potential uplift to the standard methodology for calculating housing need, pending the outcome of the Government's 'Technical consultation on updates to national planning policy and guidance'.
2.5. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility or Green Belt protection. Moreover, the figure does not allow provision for unmet need from neighbouring authorities in addition to the minimum requirement.
2.6. At 4.18 the PSLP confirms the Council have not been able to identify a five-year housing land supply to deliver the annualised requirement. Further to this, at 4.19 the PSLP confirms that there is a high proportion of designated Green Belt within the Borough, making it extremely difficult to achieve a five-year supply due to the fact that sites on the edge of settlements, currently within the Green Belt are not available for development purposes until the adoption of the Plan.
2.7. The Borough has a limited amount of previously developed land within its authority to provide for short term delivery, as such Green Belt release is required in order to meet the Authorities housing need and deliver within the short, medium and long term, as stated at paragraph 2.54 of the PSLP. The approach to amend the Green Belt boundaries is therefore supported.
2.8. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility, Green Belt protection or unmet need from neighbouring authorities in addition to the minimum requirement.
2.9. In respect of the above, whilst the current PSLP and associated housing allocations seek to go some way in delivering housing that will support the recognised needs of the Borough over the next 15 years, there is clearly a need to increase this provision. Whilst this could be helped through the identification of additional sites, ensuring the delivery and efficient use of the sites that are allocated for housing will also provide a degree of buffer. Further commentary and recommendations in this regard are provided later within this representation.
Five-year Housing Land Supply and Housing Trajectory
2.10. The Council is required to demonstrate a five-year housing land supply at any point in the plan period (Paragraph: 038 Reference ID: 3-038-20180913).
2.11. The NPPF (Paragraph 73) confirms that a 20% buffer should be applied to the initial calculation for a five-year housing land supply requirement, in the event that the results of the Housing Delivery Test show that there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. From November 2018, significant under delivery indicates that delivery was below 85% of the requirement for the Borough. The PPG (Paragraph: 037 Reference ID: 3-037-20180913) also confirms that the requirement for a 20% buffer also applies where a Local Planning Authority are seeking to confirm their five-year housing land supply through a recently adopted Local Plan.
2.12. The results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years and this is therefore well below the threshold for the 20% buffer requirement.
2.13. The Borough's most recent reported five-year housing land supply (Five Year Housing Land Supply Statement as at 31 March 2018 (November 2018) ('HLSS') is 4.1 years. This is predicated on a requirement which, when considered in relation to the latest guidance, understates need; and a supply which, again when considered in relation to latest guidance, overstates supply. As such, the actual housing land supply is noticeably less.
2.14. Looking at this in detail, the HLSS considers an annual need of 343 dwellings, resulting in a total requirement once the 20% has been applied of 2,058 dwellings. However, applying the latest guidance and the Standard Method, the Borough's housing requirement is 452 dwellings per annum. Applying the 20% buffer, this results in a five-year requirement of 2,712 dwellings.
2.15. In terms of supply, the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years. As per the Glossary contained within Annex 2 of the NPPF, such sites cannot be considerable deliverable for the purposes of the five-year housing land supply. Table 1 of the HLSS suggests that at least 1,042 dwellings in the reported supply did not have planning permission. Once these are removed from the supply calculation, the five-year supply comprises 653 dwellings. It is unclear if and how many of the dwellings categorised as having extant planning permission are on major sites which only benefit from outline permission. Such sites would also have to be discounted. As such, the figure of 653 dwellings may overstate housing supply.
2.16. A five-year supply of 653 dwellings compared to a requirement of 2,712 represents a 1.2-year housing land supply. This acute housing land supply shortage demonstrates the importance of allocating sites through the Local Plan which can delivery early in the plan period, and support the existing supply of housing. It also emphasises the need to avoid over-reliance on large strategic sites which inevitably take longer to deliver.
2.17. The housing trajectory provided as Appendix 1 to the PSLP projects that it will enable completion of 2,305 dwellings between 2019/20 and 2023/24.
2.18. Having regard to the Standard Method and the need to apply a 20% buffer to the housing requirement, the total five-year requirement for the Borough is 2,712 dwellings. Therefore, even before critical review of the supply, the PSLP will not provide a five-year supply of housing.
2.19. Furthermore, and in respect of the projected supply, we are concerned to note that Dunton Hills Garden Village is anticipated to deliver housing completions from 2022/23, falling within the first five years of the plan.
2.20. Dunton Hills Garden Village is a proposed major strategic development, intended to provide a new settlement supported by a range of facilities and infrastructure. Delivery will require the coordination and input of multiple landowners, developers, infrastructure providers and other stakeholders. Once allocated, the PSLP proposes a masterplan and design guidance will be required to be prepared to ensure that a cohesive approach is taken to the development of the Garden Village.
2.21. As such, it is a concern that 100 homes will be completed at Dunton Hills Garden Village as early as 2022/23. This does not in itself mean that Dunton Hills Garden Village proposals cannot form part of a sound Local Plan, but it does again demonstrate an inability to rely on large strategic sites for short term housing delivery, and emphasises the need for smaller sites to be supported by policies which will allow their short term delivery to ensure the Local Plan is sound.
Policy R16 & R17: Land off Doddinghurst Road
2.22. Policy R16 & R17 proposes the release of the site from the Green Belt and allocation for around 200 new homes. This approach is supported as an achievable and deliverable solution to contributing towards the Borough's housing land supply to meet the housing need requirement.
2.23. Having regard to the PSLP's housing trajectory, paragraph 9.160 the PSLP states the dwellings are anticipated to be delivered between 2023/24 and 2026/27. We do not support this assumption and object to the timing of the delivery of this site, as set out in the above mentioned paragraph and Appendix 1 of the PSLP. As the Council will be aware, representations have been made to earlier iterations of the emerging Local Plan to confirm the site is available, deliverable and achievable within the first five years of the plan period.
2.24. As currently proposed the trajectory is unsound in relation to this site, and as such is not justified. This is because the site can be delivered earlier than the stated timescales in Appendix 1 of the PSLP. In order to make the housing trajectory sound, amendments to the trajectory must be made to reflect the earlier delivery of the site in the plan period. The proposed amendments would result in a justified approach and a sound policy.
2.25. In addition to amending the housing trajectory to reflect the realistic and earlier delivery of the site, as proposed by a developer with an option on the land, the inclusion of the site within the first five years on the plan period will assist BBC with their five-year housing land supply position, not only assisting in housing delivery of the PSLP is effective and can be found sound at Examination.
Unit Numbers
2.26. Whilst we are supportive of the allocation, we raise concerns in relation to the wording of allocation policies such as Policy R16 & R17 should take this requirement for flexibility into account and worded as such to provide "at least 200 homes", as opposed to "around 200 homes". We consider that this would provide greater certainty on the number of homes to be delivered as part of each allocation for Brentwood Borough Council, and also allows for the delivery of additional units where appropriate opportunities may arise.
2.27. For sites R16 and R17, a significant amount of feasibility work has been undertaken to establish any site constraints, and as a result of this, Countryside are confident in the ability for the site to provide at least 250 homes. We have concerns that the respective policy's current format may be interpreted to confirm the optimum use of the site, rather than a lower limit. In fact, the 200-unit figure has been produced by Brentwood Borough Council with far less rationale and technical justification than has been undertaken by Countryside Properties and may lessen the ability of this site and other policies with similar wording to support Brentwood's need for a buffer and flexibility in their housing land supply.
Access
2.28. It is noted that there has been a change in wording of Part B (b) of Policy R16 & R17 from the November 2018 Proposed Submission Local Plan presented to Committee, and that now being consulted on (February 2019), with no explanation. The previous iteration of the policy required vehicular access to be provided from "Doddinghurst Road for both site and/or Karen Close and Russell Close". The current policy is worded to allow for vehicular access from Doddinghurst Road only.
2.29. Whilst access from Doddinghurst Road is accepted as the preferred strategy for all parties, initial appraisal work in this respect has recognised a potential requirement for significant levelling and land movement which could have implications on the viability of housing delivery on the site. It is therefore requested that the policy retains flexibility for the use of the other accesses from Karen Close and Russell Close as a worst case scenario, in the interests of protecting the deliverability of the southern parcel of the site, particularly as these routes of access have been previously agreed with Essex County Council Highways.
Policy SP03 Health Impact Assessments
2.30. The Policy requires planning applications for developments of 50 or more to be dwellings, non-residential development of 1,000sqm or more or schemes for C2 class developments to be supported by HIAs. The HBF response to this policy is unsupportive and they consider the policy to be unsound as it is not consistent with national policy and is ineffective.
2.31. We are in agreement with the HBF's response, dated 17th March 2019, in relation to the requirement for HIAs to be provided for 50 or more dwellings and consider the requirement to be unnecessary and an additional burden on applicants. Referring to the PPG we note that HIAs may be useful tools, however the PPG also expresses the importance of the local plan needing to consider the wider health issues in an area and ensuring the policies respond to these concerns. The guidance is provided below for completeness.
2.32. Paragraph: 002 Reference ID: 53-002-20140306 confirms that provision of the required health infrastructure should be supported and taken into account at local and neighbourhood plan making, and when determining planning applications.
2.33. Referring to National policy, paragraph 20 states that Strategic Policies should set out an overall strategy for the pattern, scale and quality of development, this includes infrastructure and community facilities.
2.34. In order for the local plan to be consistent with national policy, the Local Plan should already consider the impact of development on the health and wellbeing of the communities and any identified infrastructure should be addressed in policy. Therefore, whilst Countryside support the important consideration of health and wellbeing of communities where development is in line with the policies contained within the development plan a HIA should not be necessary. The requirement for a HIA should only be triggered where there is a departure from the plan, enabling the Council to assess any impacts on the health and well-being of the community as a result of said proposals.
Policy SP05 Construction Management
2.35. The Policy expects all major development schemes/developers to sign up to the Considerate Constructors Scheme, or equivalent. The scheme is a non-profit making, independent organisation which monitors construction sites signed up to the scheme, with the aim of managing and mitigating impacts arising from construction. This requirement is considered unjustified and inconsistent with national policy.
2.36. Whilst we recognise the importance of managing the potential impacts on construction sites, we consider this policy to be unsound because it is unjustified and not consistent with national policy. We would suggest that consideration for the scheme is best dealt with through planning applications and development management without it being written into formal planning policy.
2.37. We are not aware of any other adopted or emerging Local Plan which requires applicants and developers of major sites to enter into a specified construction management scheme and therefore question the reasonableness of this policy. The matter of construction management should be assessed on a case by case basis and should not be a matter for a strategic policy to prescribe. How a construction scheme is managed and mitigated should be an item for consideration by the decision taker and assessed on a case by case basis.
2.38. The imposition of Policy SP05 requires all major developments to be signed up to the Considerate Constructors Scheme regardless of the site or proposal details. It is recommended that this policy is removed.
Policy BE02 Sustainable Construction and Resource Efficiency
2.39. We consider the policy to be unsound as it is inconsistent with national policy. Part (f) of Policy BE02 requires the inclusion of renewable and decentralised energy as part of a new development, this is not consistent with national policy. Whilst Countryside recognise the importance of sustainable construction, a policy approach to such requirements does not allow for the appropriate flexibility in this regard, as recognised in the NPPF.
2.40. Paragraph 153 of the NPPF states that local plans can expect development to meet such provisions, however the NPPF also states that they are only required to comply with such policies where it is either feasible or viable. To ensure consistency with national policy part (f) of Policy BE02 should be amended to reflect this position.
Policy BE03 Carbon Reduction, Renewable Energy and Water Efficiency
2.41. It is Government policy to seek to deliver improvements to emissions from buildings through the building regulations regime. As such we do not consider it necessary to include the table at part (a) of this policy. Should a national zero carbon policy be introduced it will be achieved and applied through building regulations, as noted at paragraph 5.33.
2.42. We therefore echo those comments of the HBF's consultation response, dated 17th March 2019, and suggest that if the building regulations are updated then the Council should revisit the policy through a local plan review at that stage, but that such matters are dealt with through building regulations in the meantime to prevent unnecessary duplicate consideration of such matters through both planning and construction stages.
Policy BE04 Establishing Low Carbon and Renewable Energy Infrastructure Network
2.43. It is acknowledged that the Government support the transition to a low carbon future in a changing climate, including support towards renewable and low carbon energy and associated infrastructure. Countryside support these intentions.
2.44. Part (b) of Policy BE04 expects sites of over 500 dwellings, including where there are clusters of neighbouring sites that total over 500 units, shall incorporate decentralised energy infrastructure in line with a hierarchy however.
2.45. We raise concerns in relation to the deliverability of part (b) of the policy in relation to sites within a cluster of 500 or more dwellings given that neighbouring sites will not necessary come forward by multiple landowners and developers at similar times. The coordinating and implementation of a heat network to serve smaller scale sites as separate applications but adjacent to other similar sized sites in the locality, is unreasonable and unjustified and could result in a delay in delivery of new homes, resulting in an ineffective local plan.
2.46. It is recommended that the requirement for new development located where 'clusters' of neighbouring sites totals over 500 units should be removed from the policy in order to make the policy effective.
Policy BE10 Connecting New Developments to Digital Infrastructure
2.47. It is Government policy to support the expansion of electronic communications networks. However, we would draw the Council's attention to the Written Ministerial Statement, 25th March 2015, which announced that local planning authorities preparing Local Plans, "should not set any additional standards or requirements relating to the construction, internal layout or performance of new dwellings."
2.48. The Local Planning Authority are only allowed to adopt the three optional technical standards, in relation to construction, internal layout and performance, subject to evidenced need and viability. As such, the Council should not seek higher standards than Building Regulations, as already referred to in our response to Policy BE03. Therefore, Policy BE10 is considered unsound because it is unjustified and contrary to national policy.
2.49. We are also unaware of National Policy requiring benches and bins to be connected to mobile digital infrastructure. As such the policy is unjustified and contrary to national policy.
2.50. Countryside are committed to ensuring that all developments go as far as is practical to meet national intentions to ensure the quality, practicality and future-proofing of new housing developments. We have concerns however that by introducing a wealth of additional planning policies in these areas, there will be unnecessary duplication to building regulations, and potentially delays to planning applications which will in turn impact on the timely delivery of new homes.
3. Site Deliverability
3.1. The site represents a deliverable, sustainable and achievable site for residential development. A number of technical reports and associated documents have been completed which demonstrate this. The below section provides a summary of these documents.
Density Study
3.2. A Density Study (January 2018) has been undertaken by JTP Architects.
3.3. As per Paragraph 2.23 of this representation, the Preferred Site Allocations Document (January 2018) states that the indicative dwelling yield of the site is 200 dwellings.
3.4. The Density Study confirms that the total site area is 8.02ha and the total developable area is 6.17ha. Furthermore, it confirms that the site can accommodate up to 250 dwellings with 180 dwellings on Site 023A and 40 dwellings on parcel 023B, which results in 40 dwellings per hectare and 25 dwellings per hectare, respectively.
3.5. The Density Study also provides a Developable Area Plan which illustrates the developable area, the existing trees and root protections areas (RPA), the easements and attenuation and drainage. The plan proposed that the most significant existing trees and foliage are retained.
3.6. Furthermore, the Study characterises the existing landscape features of Site 023A as three naturally formed developable areas. This natural formation will enable an orthogonal street pattern and regular frontage and a more efficient layout of a potentially higher density.
3.7. The study characterises Site 023B as a more irregular shape due to the present underground services. Furthermore, the Density Study identifies that the site has more constrained access opportunities. This has led to a more organic layout of a potentially lower density.
3.8. Given the evidence in the Density Study, the site could accommodate up to 250 dwellings. Further detail on how the site could present a sustainable development opportunity can be found in the summaries below.
Air Quality
3.9. An Air Quality Assessment was undertaken by Ardent Consulting Engineers in February 2017. The assessment reviews air quality constraints affecting the site.
3.10. The assessment concludes that it is unlikely that the proposed development will be considered high risk in terms of construction impacts. It also suggests that there has been a general improvement in local air quality over recent years which is evidenced by the monitored concentrations which are detailed within the report. Nevertheless, the assessment recommends that mitigation measures may need to be adopted as part of the development and be further considered in due course.
3.11. The assessment recommends that the impact of any potential increase in traffic flow on the local road network should be determined by way of a detailed air quality assessment.
3.12. Given the proximity of the A12, there is the potential for the introduction of a new exposure adjacent to the A12. This is dependent on the distance between individual units and the A12 which is to be addressed through careful design by the Architects.
Archaeology
3.13. An Archaeological Desk Based Assessment was undertaken by CGMS Consulting in November 2014.
3.14. The assessment confirms that the site does not lie within an area of archaeological priority, as previously designated by Brentwood Borough Council. It confirms that the site can be considered to have a modest potential for the late prehistoric.
3.15. The assessment also confirms that the site has remained undeveloped land through its documented history.
3.16. The assessment anticipates that Essex County Council archaeological advisors may request additional archaeological mitigation measures, initially in the form of a geophysical survey.
Desktop Noise Report
3.17. A Desktop Noise Report was completed by Ardent Consulting Engineers in March 2016.
3.18. The Noise Report concludes that subject to appropriate mitigation measures, the proposed internal and external areas of the proposed development could be demonstrated to be within desirable noise levels, subject to a detailed assessment.
3.19. The report states that ambient vibration levels may be a concern due to the sites proximity to the A12. These will need to be further addressed during more detailed assessment works.
3.20. Furthermore, a Noise Feasibility Plan has also been produced by Ardent Consulting Engineers. The plan provides a number of layout recommendations for Glazing, Ventilation, Rear Gardens and Balconies and Standalone Barriers. The Noise Feasibility Plan also outlines the closest possible building line on site which has reasonable attenuation and the recommended approximate minimum effective extent of an acoustic barrier. The plan also provides dimensions between the site and the nearest channel of the A12.
Drainage Strategy
3.21. A Drainage Strategy Technical Note was produced by Ardent Consulting Engineers in 2016. The note confirms that existing foul and surface water sewers navigate the site, together with a number of watercourses which will continue to serve the site, post development.
3.22. The report also confirms that the site is within Flood Zone 1 and is therefore suitable for residential development. The note suggests that subject to further investigation and detailed design, a Flood Risk Assessment and Detailed Drainage Strategy can be prepared to support a successful planning application for the development.
Phase 1 Habitat Survey
3.23. A Phase 1 Habitat Survey was produced by SES in 2014. The survey concluded that the habitats on site have the potential to be of value to protected species, as well as being of general biodiversity value themselves. As a result, the Phase 1 Habitat Survey recommends that the following works are undertaken;
* Reptiles (presence/likely absence survey - northern site only);
* Badgers (monitoring of setts on site);
* Bats (tree inspection surveys, activity surveys);
* Breeding Bird (walkover survey during breeding bird season, generally March to August); and
* Invertebrates (walkover survey to establish value for rate and vulnerable beetles).
3.24. It is considered within the survey that any potential adverse impacts from the proposed development upon specific protected species will be able to be wholly mitigated for with careful design.
Social Infrastructure Review
3.25. A Social Infrastructure Review was produced by Quod in February 2017. The review looked to provide an assessment of the likely impact of the development of the site on the demand for school places and healthcare provision.
3.26. The review confirms that based on average household sizes for the area, it is anticipated that the site could accommodate a resident population of approximately 600 people and generate demand for 68 primary school places and 45 secondary school places.
3.27. In line with this estimated growth, the review provides a summary of the education and healthcare provision within Brentwood.
3.28. The review states that although a number of existing primary schools in the Brentwood urban area are being expanded or are due to be expanded, Essex County Council is still expecting to be facing a deficit of places by 2020/21, with the Preferred Site Allocations Document stating that there is an estimated deficit of 541 places by 2021/2022 for Primary Schools. In terms of Secondary School Provision, the Preferred Site Allocations document states that there will be an estimated deficit of 9 places by 2021/22.
3.29. In terms of healthcare provision, the report confirms that the capacity to absorb additional demand arising from developments in the Brentwood Urban Area is limited. The Preferred Site Allocations document confirms this and states that there is likely to be significant pressures on GP Surgeries due to housing growth in the Borough throughout the lifetime of the plan.
Transport
3.30. A Transport Technical Note was prepared by Ardent Consulting Engineers in January 2018. The technical note provides an initial review of the anticipated highway and transportation impacts, based on a potential development of up to 250 dwellings at the site.
3.31. The note confirms that vehicular access to the site could be provided from Doddinghurst Road for the 23A of the site and provided via the extension of Karen Close and Russell Close at the 23B parcel.
3.32. In response to local concerns regarding the suitability of existing public transport provision, the note suggests that the site could generate an additional 7 peak hour bus trips and 35 peak hour rail trips. It is considered that there is sufficient capacity to accommodate these trips. The note confirms that there does not appear to be any specific issues relating to public transport.
3.33. The technical note confirms that the impacts on surrounding roads including Doddinghurst Road and Ongar Road would not be severe and should not be a reason for the site not to be allocated.
3.34. The note confirms that there are no highways issues that would prevent the site from being allocated for residential development in the emerging Local Development Plan.
3.35. The above studies demonstrate that the site is deliverable and sustainable.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
POLICY SP05: CONSTRUCTION MANAGEMENT
Representation ID: 24092
Received: 19/03/2019
Respondent: Countryside Properties
Agent: Strutt & Parker LLP
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
The requirement that all major development schemes/developers to sign up to the Considerate Constructors Scheme, or equivalent is unjustified and inconsistent with national policy. We are not aware of any other adopted or emerging Local Plan which requires applicants and developers of major sites to enter into a specified construction management scheme and therefore question the reasonableness of this policy. This should be assessed on a case by case basis and should not be a matter for a strategic policy to prescribe.
The imposition of Policy SP05 requires all major developments to be signed up to the
Considerate Constructors Scheme regardless of the site or proposal details. It is
recommended that this policy is removed.
1. Introduction
1.1 These representations are submitted by Strutt & Parker on behalf of Countryside Properties (UK) Ltd in relation to the Brentwood Borough Council Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our clients land at Doddinghurst Road (North & South of the A12), which has been allocated under Policy R16 & 17 of the PSLP. A plan showing the site is provided as Appendix A to this representation.
1.2 Countryside was founded in Essex 60 years ago by Alan Cherry and has since established a reputation for delivering high quality developments. With the ethos 'creating places people love', Countryside's achievements are exemplified through having won more Housing Design Awards than any other house builder.
1.3 Countryside is a major development and place-maker, having secured planning permission and building out developments in varying scales: from smaller 30 dwelling schemes on the edge of village's through to large urban extensions of 3,500 new homes plus associated community facilities. Countryside has a proven track record of delivery. The company is headquartered in Brentwood and has a proud legacy of local sites such as Clements Park and the Square on Hart Street.
1.4 The representations set out Countryside's position in relation to the residential site allocation of R16 and R17, both parcels of which fall within their control. The proposed allocation provides for around 200 dwellings and is an important contribution towards BBC's land supply for Brentwood Borough's Draft Plan. The representations provide comments on the relevant policies relating to those interests in the Draft Plan.
1.5 As the Council will be aware, representations have previously been made on behalf of Countryside Properties and in respect of the two parcels of land, towards the Preferred Options Consultation in October 2013 and the Strategic Growth Options Consultation February 2015, and the Regulation 18 Local Plan in March 2018. As a result of these representations, and the discussions that have been held with officers at Brentwood Borough Council alongside the Local Plan process, the two parcels either side of the A12 at Doddinghurst Road have been proposed as a housing allocation within PSLP. From here, the two parcels of land are referred to as "the site", in respect of their joint allocation and policy.
1.6 Countryside's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to the elements of the Housing and Development Management Policies and the housing trajectory relating to the delivery of Policy R16 and R17 during the Plan period.
1.7 Where such concerns are raised, specific changes to the relevant polices are sought and these are indicated in the following representations in order to assist the Council to make the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy.
1.8 Site 023A measures at approximately 5.99ha and Site 023B measures at approximately 2.2ha. The Council have defined the total net developable area of the two sites as 6.14ha. The site is currently designated as Green Belt in the adopted development plan.
1.9 The PSLP has recognised the sustainability of the site and enclosed character, and have therefore proposed it for removal from the Green Belt and for its allocation to provide housing. We support this allocation but do however have some concerns over other policies in the PSLP that may have implications for the efficient and timely delivery of this site.
2. Brentwood Local Plan Regulation 19 Consultation
Housing Need
2.1. Paragraph 4.13 of the PSLP states that the Borough's housing requirement is 350 dwellings per annum. Paragraph 4.12 confirms that this figure is calculated using the Standard Method (as per the NPPF and respective Planning Practice Guidance(PPG)). We note that the PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method (Paragraph: 004 Reference ID: 2a-004-20190220).
2.2. On this basis, the relevant subnational population projections indicate an average annual increase of 293.2 households in the Borough between 2019 and 2029. The latest (2017) ratio of median house price to median gross annual workplace-based earnings for the Borough published by the ONS is 11.23. Once the Standard Method is applied using these figures this results in a requirement of 452 dwellings per annum.
2.3. The NPPF requires Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change.
2.4. At paragraph 4.16 the PSLP considers it appropriate to apply a 20% uplift to the identified housing target of 350 dwellings per annum, resulting in a proposed target of 456 dwellings per annum. The rationale for this buffer is unclear with separate references to the buffer advising that it allows for an additional housing land supply to maintained, but also that it serves to safeguard against any potential uplift to the standard methodology for calculating housing need, pending the outcome of the Government's 'Technical consultation on updates to national planning policy and guidance'.
2.5. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility or Green Belt protection. Moreover, the figure does not allow provision for unmet need from neighbouring authorities in addition to the minimum requirement.
2.6. At 4.18 the PSLP confirms the Council have not been able to identify a five-year housing land supply to deliver the annualised requirement. Further to this, at 4.19 the PSLP confirms that there is a high proportion of designated Green Belt within the Borough, making it extremely difficult to achieve a five-year supply due to the fact that sites on the edge of settlements, currently within the Green Belt are not available for development purposes until the adoption of the Plan.
2.7. The Borough has a limited amount of previously developed land within its authority to provide for short term delivery, as such Green Belt release is required in order to meet the Authorities housing need and deliver within the short, medium and long term, as stated at paragraph 2.54 of the PSLP. The approach to amend the Green Belt boundaries is therefore supported.
2.8. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility, Green Belt protection or unmet need from neighbouring authorities in addition to the minimum requirement.
2.9. In respect of the above, whilst the current PSLP and associated housing allocations seek to go some way in delivering housing that will support the recognised needs of the Borough over the next 15 years, there is clearly a need to increase this provision. Whilst this could be helped through the identification of additional sites, ensuring the delivery and efficient use of the sites that are allocated for housing will also provide a degree of buffer. Further commentary and recommendations in this regard are provided later within this representation.
Five-year Housing Land Supply and Housing Trajectory
2.10. The Council is required to demonstrate a five-year housing land supply at any point in the plan period (Paragraph: 038 Reference ID: 3-038-20180913).
2.11. The NPPF (Paragraph 73) confirms that a 20% buffer should be applied to the initial calculation for a five-year housing land supply requirement, in the event that the results of the Housing Delivery Test show that there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. From November 2018, significant under delivery indicates that delivery was below 85% of the requirement for the Borough. The PPG (Paragraph: 037 Reference ID: 3-037-20180913) also confirms that the requirement for a 20% buffer also applies where a Local Planning Authority are seeking to confirm their five-year housing land supply through a recently adopted Local Plan.
2.12. The results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years and this is therefore well below the threshold for the 20% buffer requirement.
2.13. The Borough's most recent reported five-year housing land supply (Five Year Housing Land Supply Statement as at 31 March 2018 (November 2018) ('HLSS') is 4.1 years. This is predicated on a requirement which, when considered in relation to the latest guidance, understates need; and a supply which, again when considered in relation to latest guidance, overstates supply. As such, the actual housing land supply is noticeably less.
2.14. Looking at this in detail, the HLSS considers an annual need of 343 dwellings, resulting in a total requirement once the 20% has been applied of 2,058 dwellings. However, applying the latest guidance and the Standard Method, the Borough's housing requirement is 452 dwellings per annum. Applying the 20% buffer, this results in a five-year requirement of 2,712 dwellings.
2.15. In terms of supply, the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years. As per the Glossary contained within Annex 2 of the NPPF, such sites cannot be considerable deliverable for the purposes of the five-year housing land supply. Table 1 of the HLSS suggests that at least 1,042 dwellings in the reported supply did not have planning permission. Once these are removed from the supply calculation, the five-year supply comprises 653 dwellings. It is unclear if and how many of the dwellings categorised as having extant planning permission are on major sites which only benefit from outline permission. Such sites would also have to be discounted. As such, the figure of 653 dwellings may overstate housing supply.
2.16. A five-year supply of 653 dwellings compared to a requirement of 2,712 represents a 1.2-year housing land supply. This acute housing land supply shortage demonstrates the importance of allocating sites through the Local Plan which can delivery early in the plan period, and support the existing supply of housing. It also emphasises the need to avoid over-reliance on large strategic sites which inevitably take longer to deliver.
2.17. The housing trajectory provided as Appendix 1 to the PSLP projects that it will enable completion of 2,305 dwellings between 2019/20 and 2023/24.
2.18. Having regard to the Standard Method and the need to apply a 20% buffer to the housing requirement, the total five-year requirement for the Borough is 2,712 dwellings. Therefore, even before critical review of the supply, the PSLP will not provide a five-year supply of housing.
2.19. Furthermore, and in respect of the projected supply, we are concerned to note that Dunton Hills Garden Village is anticipated to deliver housing completions from 2022/23, falling within the first five years of the plan.
2.20. Dunton Hills Garden Village is a proposed major strategic development, intended to provide a new settlement supported by a range of facilities and infrastructure. Delivery will require the coordination and input of multiple landowners, developers, infrastructure providers and other stakeholders. Once allocated, the PSLP proposes a masterplan and design guidance will be required to be prepared to ensure that a cohesive approach is taken to the development of the Garden Village.
2.21. As such, it is a concern that 100 homes will be completed at Dunton Hills Garden Village as early as 2022/23. This does not in itself mean that Dunton Hills Garden Village proposals cannot form part of a sound Local Plan, but it does again demonstrate an inability to rely on large strategic sites for short term housing delivery, and emphasises the need for smaller sites to be supported by policies which will allow their short term delivery to ensure the Local Plan is sound.
Policy R16 & R17: Land off Doddinghurst Road
2.22. Policy R16 & R17 proposes the release of the site from the Green Belt and allocation for around 200 new homes. This approach is supported as an achievable and deliverable solution to contributing towards the Borough's housing land supply to meet the housing need requirement.
2.23. Having regard to the PSLP's housing trajectory, paragraph 9.160 the PSLP states the dwellings are anticipated to be delivered between 2023/24 and 2026/27. We do not support this assumption and object to the timing of the delivery of this site, as set out in the above mentioned paragraph and Appendix 1 of the PSLP. As the Council will be aware, representations have been made to earlier iterations of the emerging Local Plan to confirm the site is available, deliverable and achievable within the first five years of the plan period.
2.24. As currently proposed the trajectory is unsound in relation to this site, and as such is not justified. This is because the site can be delivered earlier than the stated timescales in Appendix 1 of the PSLP. In order to make the housing trajectory sound, amendments to the trajectory must be made to reflect the earlier delivery of the site in the plan period. The proposed amendments would result in a justified approach and a sound policy.
2.25. In addition to amending the housing trajectory to reflect the realistic and earlier delivery of the site, as proposed by a developer with an option on the land, the inclusion of the site within the first five years on the plan period will assist BBC with their five-year housing land supply position, not only assisting in housing delivery of the PSLP is effective and can be found sound at Examination.
Unit Numbers
2.26. Whilst we are supportive of the allocation, we raise concerns in relation to the wording of allocation policies such as Policy R16 & R17 should take this requirement for flexibility into account and worded as such to provide "at least 200 homes", as opposed to "around 200 homes". We consider that this would provide greater certainty on the number of homes to be delivered as part of each allocation for Brentwood Borough Council, and also allows for the delivery of additional units where appropriate opportunities may arise.
2.27. For sites R16 and R17, a significant amount of feasibility work has been undertaken to establish any site constraints, and as a result of this, Countryside are confident in the ability for the site to provide at least 250 homes. We have concerns that the respective policy's current format may be interpreted to confirm the optimum use of the site, rather than a lower limit. In fact, the 200-unit figure has been produced by Brentwood Borough Council with far less rationale and technical justification than has been undertaken by Countryside Properties and may lessen the ability of this site and other policies with similar wording to support Brentwood's need for a buffer and flexibility in their housing land supply.
Access
2.28. It is noted that there has been a change in wording of Part B (b) of Policy R16 & R17 from the November 2018 Proposed Submission Local Plan presented to Committee, and that now being consulted on (February 2019), with no explanation. The previous iteration of the policy required vehicular access to be provided from "Doddinghurst Road for both site and/or Karen Close and Russell Close". The current policy is worded to allow for vehicular access from Doddinghurst Road only.
2.29. Whilst access from Doddinghurst Road is accepted as the preferred strategy for all parties, initial appraisal work in this respect has recognised a potential requirement for significant levelling and land movement which could have implications on the viability of housing delivery on the site. It is therefore requested that the policy retains flexibility for the use of the other accesses from Karen Close and Russell Close as a worst case scenario, in the interests of protecting the deliverability of the southern parcel of the site, particularly as these routes of access have been previously agreed with Essex County Council Highways.
Policy SP03 Health Impact Assessments
2.30. The Policy requires planning applications for developments of 50 or more to be dwellings, non-residential development of 1,000sqm or more or schemes for C2 class developments to be supported by HIAs. The HBF response to this policy is unsupportive and they consider the policy to be unsound as it is not consistent with national policy and is ineffective.
2.31. We are in agreement with the HBF's response, dated 17th March 2019, in relation to the requirement for HIAs to be provided for 50 or more dwellings and consider the requirement to be unnecessary and an additional burden on applicants. Referring to the PPG we note that HIAs may be useful tools, however the PPG also expresses the importance of the local plan needing to consider the wider health issues in an area and ensuring the policies respond to these concerns. The guidance is provided below for completeness.
2.32. Paragraph: 002 Reference ID: 53-002-20140306 confirms that provision of the required health infrastructure should be supported and taken into account at local and neighbourhood plan making, and when determining planning applications.
2.33. Referring to National policy, paragraph 20 states that Strategic Policies should set out an overall strategy for the pattern, scale and quality of development, this includes infrastructure and community facilities.
2.34. In order for the local plan to be consistent with national policy, the Local Plan should already consider the impact of development on the health and wellbeing of the communities and any identified infrastructure should be addressed in policy. Therefore, whilst Countryside support the important consideration of health and wellbeing of communities where development is in line with the policies contained within the development plan a HIA should not be necessary. The requirement for a HIA should only be triggered where there is a departure from the plan, enabling the Council to assess any impacts on the health and well-being of the community as a result of said proposals.
Policy SP05 Construction Management
2.35. The Policy expects all major development schemes/developers to sign up to the Considerate Constructors Scheme, or equivalent. The scheme is a non-profit making, independent organisation which monitors construction sites signed up to the scheme, with the aim of managing and mitigating impacts arising from construction. This requirement is considered unjustified and inconsistent with national policy.
2.36. Whilst we recognise the importance of managing the potential impacts on construction sites, we consider this policy to be unsound because it is unjustified and not consistent with national policy. We would suggest that consideration for the scheme is best dealt with through planning applications and development management without it being written into formal planning policy.
2.37. We are not aware of any other adopted or emerging Local Plan which requires applicants and developers of major sites to enter into a specified construction management scheme and therefore question the reasonableness of this policy. The matter of construction management should be assessed on a case by case basis and should not be a matter for a strategic policy to prescribe. How a construction scheme is managed and mitigated should be an item for consideration by the decision taker and assessed on a case by case basis.
2.38. The imposition of Policy SP05 requires all major developments to be signed up to the Considerate Constructors Scheme regardless of the site or proposal details. It is recommended that this policy is removed.
Policy BE02 Sustainable Construction and Resource Efficiency
2.39. We consider the policy to be unsound as it is inconsistent with national policy. Part (f) of Policy BE02 requires the inclusion of renewable and decentralised energy as part of a new development, this is not consistent with national policy. Whilst Countryside recognise the importance of sustainable construction, a policy approach to such requirements does not allow for the appropriate flexibility in this regard, as recognised in the NPPF.
2.40. Paragraph 153 of the NPPF states that local plans can expect development to meet such provisions, however the NPPF also states that they are only required to comply with such policies where it is either feasible or viable. To ensure consistency with national policy part (f) of Policy BE02 should be amended to reflect this position.
Policy BE03 Carbon Reduction, Renewable Energy and Water Efficiency
2.41. It is Government policy to seek to deliver improvements to emissions from buildings through the building regulations regime. As such we do not consider it necessary to include the table at part (a) of this policy. Should a national zero carbon policy be introduced it will be achieved and applied through building regulations, as noted at paragraph 5.33.
2.42. We therefore echo those comments of the HBF's consultation response, dated 17th March 2019, and suggest that if the building regulations are updated then the Council should revisit the policy through a local plan review at that stage, but that such matters are dealt with through building regulations in the meantime to prevent unnecessary duplicate consideration of such matters through both planning and construction stages.
Policy BE04 Establishing Low Carbon and Renewable Energy Infrastructure Network
2.43. It is acknowledged that the Government support the transition to a low carbon future in a changing climate, including support towards renewable and low carbon energy and associated infrastructure. Countryside support these intentions.
2.44. Part (b) of Policy BE04 expects sites of over 500 dwellings, including where there are clusters of neighbouring sites that total over 500 units, shall incorporate decentralised energy infrastructure in line with a hierarchy however.
2.45. We raise concerns in relation to the deliverability of part (b) of the policy in relation to sites within a cluster of 500 or more dwellings given that neighbouring sites will not necessary come forward by multiple landowners and developers at similar times. The coordinating and implementation of a heat network to serve smaller scale sites as separate applications but adjacent to other similar sized sites in the locality, is unreasonable and unjustified and could result in a delay in delivery of new homes, resulting in an ineffective local plan.
2.46. It is recommended that the requirement for new development located where 'clusters' of neighbouring sites totals over 500 units should be removed from the policy in order to make the policy effective.
Policy BE10 Connecting New Developments to Digital Infrastructure
2.47. It is Government policy to support the expansion of electronic communications networks. However, we would draw the Council's attention to the Written Ministerial Statement, 25th March 2015, which announced that local planning authorities preparing Local Plans, "should not set any additional standards or requirements relating to the construction, internal layout or performance of new dwellings."
2.48. The Local Planning Authority are only allowed to adopt the three optional technical standards, in relation to construction, internal layout and performance, subject to evidenced need and viability. As such, the Council should not seek higher standards than Building Regulations, as already referred to in our response to Policy BE03. Therefore, Policy BE10 is considered unsound because it is unjustified and contrary to national policy.
2.49. We are also unaware of National Policy requiring benches and bins to be connected to mobile digital infrastructure. As such the policy is unjustified and contrary to national policy.
2.50. Countryside are committed to ensuring that all developments go as far as is practical to meet national intentions to ensure the quality, practicality and future-proofing of new housing developments. We have concerns however that by introducing a wealth of additional planning policies in these areas, there will be unnecessary duplication to building regulations, and potentially delays to planning applications which will in turn impact on the timely delivery of new homes.
3. Site Deliverability
3.1. The site represents a deliverable, sustainable and achievable site for residential development. A number of technical reports and associated documents have been completed which demonstrate this. The below section provides a summary of these documents.
Density Study
3.2. A Density Study (January 2018) has been undertaken by JTP Architects.
3.3. As per Paragraph 2.23 of this representation, the Preferred Site Allocations Document (January 2018) states that the indicative dwelling yield of the site is 200 dwellings.
3.4. The Density Study confirms that the total site area is 8.02ha and the total developable area is 6.17ha. Furthermore, it confirms that the site can accommodate up to 250 dwellings with 180 dwellings on Site 023A and 40 dwellings on parcel 023B, which results in 40 dwellings per hectare and 25 dwellings per hectare, respectively.
3.5. The Density Study also provides a Developable Area Plan which illustrates the developable area, the existing trees and root protections areas (RPA), the easements and attenuation and drainage. The plan proposed that the most significant existing trees and foliage are retained.
3.6. Furthermore, the Study characterises the existing landscape features of Site 023A as three naturally formed developable areas. This natural formation will enable an orthogonal street pattern and regular frontage and a more efficient layout of a potentially higher density.
3.7. The study characterises Site 023B as a more irregular shape due to the present underground services. Furthermore, the Density Study identifies that the site has more constrained access opportunities. This has led to a more organic layout of a potentially lower density.
3.8. Given the evidence in the Density Study, the site could accommodate up to 250 dwellings. Further detail on how the site could present a sustainable development opportunity can be found in the summaries below.
Air Quality
3.9. An Air Quality Assessment was undertaken by Ardent Consulting Engineers in February 2017. The assessment reviews air quality constraints affecting the site.
3.10. The assessment concludes that it is unlikely that the proposed development will be considered high risk in terms of construction impacts. It also suggests that there has been a general improvement in local air quality over recent years which is evidenced by the monitored concentrations which are detailed within the report. Nevertheless, the assessment recommends that mitigation measures may need to be adopted as part of the development and be further considered in due course.
3.11. The assessment recommends that the impact of any potential increase in traffic flow on the local road network should be determined by way of a detailed air quality assessment.
3.12. Given the proximity of the A12, there is the potential for the introduction of a new exposure adjacent to the A12. This is dependent on the distance between individual units and the A12 which is to be addressed through careful design by the Architects.
Archaeology
3.13. An Archaeological Desk Based Assessment was undertaken by CGMS Consulting in November 2014.
3.14. The assessment confirms that the site does not lie within an area of archaeological priority, as previously designated by Brentwood Borough Council. It confirms that the site can be considered to have a modest potential for the late prehistoric.
3.15. The assessment also confirms that the site has remained undeveloped land through its documented history.
3.16. The assessment anticipates that Essex County Council archaeological advisors may request additional archaeological mitigation measures, initially in the form of a geophysical survey.
Desktop Noise Report
3.17. A Desktop Noise Report was completed by Ardent Consulting Engineers in March 2016.
3.18. The Noise Report concludes that subject to appropriate mitigation measures, the proposed internal and external areas of the proposed development could be demonstrated to be within desirable noise levels, subject to a detailed assessment.
3.19. The report states that ambient vibration levels may be a concern due to the sites proximity to the A12. These will need to be further addressed during more detailed assessment works.
3.20. Furthermore, a Noise Feasibility Plan has also been produced by Ardent Consulting Engineers. The plan provides a number of layout recommendations for Glazing, Ventilation, Rear Gardens and Balconies and Standalone Barriers. The Noise Feasibility Plan also outlines the closest possible building line on site which has reasonable attenuation and the recommended approximate minimum effective extent of an acoustic barrier. The plan also provides dimensions between the site and the nearest channel of the A12.
Drainage Strategy
3.21. A Drainage Strategy Technical Note was produced by Ardent Consulting Engineers in 2016. The note confirms that existing foul and surface water sewers navigate the site, together with a number of watercourses which will continue to serve the site, post development.
3.22. The report also confirms that the site is within Flood Zone 1 and is therefore suitable for residential development. The note suggests that subject to further investigation and detailed design, a Flood Risk Assessment and Detailed Drainage Strategy can be prepared to support a successful planning application for the development.
Phase 1 Habitat Survey
3.23. A Phase 1 Habitat Survey was produced by SES in 2014. The survey concluded that the habitats on site have the potential to be of value to protected species, as well as being of general biodiversity value themselves. As a result, the Phase 1 Habitat Survey recommends that the following works are undertaken;
* Reptiles (presence/likely absence survey - northern site only);
* Badgers (monitoring of setts on site);
* Bats (tree inspection surveys, activity surveys);
* Breeding Bird (walkover survey during breeding bird season, generally March to August); and
* Invertebrates (walkover survey to establish value for rate and vulnerable beetles).
3.24. It is considered within the survey that any potential adverse impacts from the proposed development upon specific protected species will be able to be wholly mitigated for with careful design.
Social Infrastructure Review
3.25. A Social Infrastructure Review was produced by Quod in February 2017. The review looked to provide an assessment of the likely impact of the development of the site on the demand for school places and healthcare provision.
3.26. The review confirms that based on average household sizes for the area, it is anticipated that the site could accommodate a resident population of approximately 600 people and generate demand for 68 primary school places and 45 secondary school places.
3.27. In line with this estimated growth, the review provides a summary of the education and healthcare provision within Brentwood.
3.28. The review states that although a number of existing primary schools in the Brentwood urban area are being expanded or are due to be expanded, Essex County Council is still expecting to be facing a deficit of places by 2020/21, with the Preferred Site Allocations Document stating that there is an estimated deficit of 541 places by 2021/2022 for Primary Schools. In terms of Secondary School Provision, the Preferred Site Allocations document states that there will be an estimated deficit of 9 places by 2021/22.
3.29. In terms of healthcare provision, the report confirms that the capacity to absorb additional demand arising from developments in the Brentwood Urban Area is limited. The Preferred Site Allocations document confirms this and states that there is likely to be significant pressures on GP Surgeries due to housing growth in the Borough throughout the lifetime of the plan.
Transport
3.30. A Transport Technical Note was prepared by Ardent Consulting Engineers in January 2018. The technical note provides an initial review of the anticipated highway and transportation impacts, based on a potential development of up to 250 dwellings at the site.
3.31. The note confirms that vehicular access to the site could be provided from Doddinghurst Road for the 23A of the site and provided via the extension of Karen Close and Russell Close at the 23B parcel.
3.32. In response to local concerns regarding the suitability of existing public transport provision, the note suggests that the site could generate an additional 7 peak hour bus trips and 35 peak hour rail trips. It is considered that there is sufficient capacity to accommodate these trips. The note confirms that there does not appear to be any specific issues relating to public transport.
3.33. The technical note confirms that the impacts on surrounding roads including Doddinghurst Road and Ongar Road would not be severe and should not be a reason for the site not to be allocated.
3.34. The note confirms that there are no highways issues that would prevent the site from being allocated for residential development in the emerging Local Development Plan.
3.35. The above studies demonstrate that the site is deliverable and sustainable.
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
POLICY BE02: SUSTAINABLE CONSTRUCTION AND RESOURCE EFFICIENCY
Representation ID: 24093
Received: 19/03/2019
Respondent: Countryside Properties
Agent: Strutt & Parker LLP
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Unsound as it is inconsistent with national policy. Part (f) of Policy BE02 requires the inclusion of renewable and decentralised energy as part of a new development, this is not consistent with national policy. Paragraph 153 of the NPPF states that local plans can expect development to meet such provisions, however the NPPF also states that they are only required to comply with such policies where it is either feasible or viable. To ensure consistency with national policy part (f) of Policy BE02 should be amended to reflect this position.
Part (f) of Policy BE02 should be amended to reflect this position.
1. Introduction
1.1 These representations are submitted by Strutt & Parker on behalf of Countryside Properties (UK) Ltd in relation to the Brentwood Borough Council Proposed Submission Local Plan (Regulation 19) (PSLP), and in particular with regards to our clients land at Doddinghurst Road (North & South of the A12), which has been allocated under Policy R16 & 17 of the PSLP. A plan showing the site is provided as Appendix A to this representation.
1.2 Countryside was founded in Essex 60 years ago by Alan Cherry and has since established a reputation for delivering high quality developments. With the ethos 'creating places people love', Countryside's achievements are exemplified through having won more Housing Design Awards than any other house builder.
1.3 Countryside is a major development and place-maker, having secured planning permission and building out developments in varying scales: from smaller 30 dwelling schemes on the edge of village's through to large urban extensions of 3,500 new homes plus associated community facilities. Countryside has a proven track record of delivery. The company is headquartered in Brentwood and has a proud legacy of local sites such as Clements Park and the Square on Hart Street.
1.4 The representations set out Countryside's position in relation to the residential site allocation of R16 and R17, both parcels of which fall within their control. The proposed allocation provides for around 200 dwellings and is an important contribution towards BBC's land supply for Brentwood Borough's Draft Plan. The representations provide comments on the relevant policies relating to those interests in the Draft Plan.
1.5 As the Council will be aware, representations have previously been made on behalf of Countryside Properties and in respect of the two parcels of land, towards the Preferred Options Consultation in October 2013 and the Strategic Growth Options Consultation February 2015, and the Regulation 18 Local Plan in March 2018. As a result of these representations, and the discussions that have been held with officers at Brentwood Borough Council alongside the Local Plan process, the two parcels either side of the A12 at Doddinghurst Road have been proposed as a housing allocation within PSLP. From here, the two parcels of land are referred to as "the site", in respect of their joint allocation and policy.
1.6 Countryside's overall position is one of firm support for the PSLP and this is expressed where relevant in these representations, albeit with some overarching concerns, notably in relation to the elements of the Housing and Development Management Policies and the housing trajectory relating to the delivery of Policy R16 and R17 during the Plan period.
1.7 Where such concerns are raised, specific changes to the relevant polices are sought and these are indicated in the following representations in order to assist the Council to make the Plan more robust and improving its soundness in terms of being positively prepared, effective, justified and consistent with national policy.
1.8 Site 023A measures at approximately 5.99ha and Site 023B measures at approximately 2.2ha. The Council have defined the total net developable area of the two sites as 6.14ha. The site is currently designated as Green Belt in the adopted development plan.
1.9 The PSLP has recognised the sustainability of the site and enclosed character, and have therefore proposed it for removal from the Green Belt and for its allocation to provide housing. We support this allocation but do however have some concerns over other policies in the PSLP that may have implications for the efficient and timely delivery of this site.
2. Brentwood Local Plan Regulation 19 Consultation
Housing Need
2.1. Paragraph 4.13 of the PSLP states that the Borough's housing requirement is 350 dwellings per annum. Paragraph 4.12 confirms that this figure is calculated using the Standard Method (as per the NPPF and respective Planning Practice Guidance(PPG)). We note that the PPG now confirms that the 2014-based subnational household projection should be used to calculate housing requirements using the Standard Method (Paragraph: 004 Reference ID: 2a-004-20190220).
2.2. On this basis, the relevant subnational population projections indicate an average annual increase of 293.2 households in the Borough between 2019 and 2029. The latest (2017) ratio of median house price to median gross annual workplace-based earnings for the Borough published by the ONS is 11.23. Once the Standard Method is applied using these figures this results in a requirement of 452 dwellings per annum.
2.3. The NPPF requires Local Plans to meet this need as a minimum, whilst also allowing sufficient flexibility to be able to respond to rapid change.
2.4. At paragraph 4.16 the PSLP considers it appropriate to apply a 20% uplift to the identified housing target of 350 dwellings per annum, resulting in a proposed target of 456 dwellings per annum. The rationale for this buffer is unclear with separate references to the buffer advising that it allows for an additional housing land supply to maintained, but also that it serves to safeguard against any potential uplift to the standard methodology for calculating housing need, pending the outcome of the Government's 'Technical consultation on updates to national planning policy and guidance'.
2.5. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility or Green Belt protection. Moreover, the figure does not allow provision for unmet need from neighbouring authorities in addition to the minimum requirement.
2.6. At 4.18 the PSLP confirms the Council have not been able to identify a five-year housing land supply to deliver the annualised requirement. Further to this, at 4.19 the PSLP confirms that there is a high proportion of designated Green Belt within the Borough, making it extremely difficult to achieve a five-year supply due to the fact that sites on the edge of settlements, currently within the Green Belt are not available for development purposes until the adoption of the Plan.
2.7. The Borough has a limited amount of previously developed land within its authority to provide for short term delivery, as such Green Belt release is required in order to meet the Authorities housing need and deliver within the short, medium and long term, as stated at paragraph 2.54 of the PSLP. The approach to amend the Green Belt boundaries is therefore supported.
2.8. Despite the outcome of the technical consultation now having been confirmed, the proposed annual housing target of the PSLP only fractionally exceeds the minimum housing requirement derived from the Standard Method, and therefore does not provide any flexibility, Green Belt protection or unmet need from neighbouring authorities in addition to the minimum requirement.
2.9. In respect of the above, whilst the current PSLP and associated housing allocations seek to go some way in delivering housing that will support the recognised needs of the Borough over the next 15 years, there is clearly a need to increase this provision. Whilst this could be helped through the identification of additional sites, ensuring the delivery and efficient use of the sites that are allocated for housing will also provide a degree of buffer. Further commentary and recommendations in this regard are provided later within this representation.
Five-year Housing Land Supply and Housing Trajectory
2.10. The Council is required to demonstrate a five-year housing land supply at any point in the plan period (Paragraph: 038 Reference ID: 3-038-20180913).
2.11. The NPPF (Paragraph 73) confirms that a 20% buffer should be applied to the initial calculation for a five-year housing land supply requirement, in the event that the results of the Housing Delivery Test show that there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. From November 2018, significant under delivery indicates that delivery was below 85% of the requirement for the Borough. The PPG (Paragraph: 037 Reference ID: 3-037-20180913) also confirms that the requirement for a 20% buffer also applies where a Local Planning Authority are seeking to confirm their five-year housing land supply through a recently adopted Local Plan.
2.12. The results of the 2018 Housing Delivery Test confirmed that Brentwood have delivered just 50% of the housing requirement over the last three years and this is therefore well below the threshold for the 20% buffer requirement.
2.13. The Borough's most recent reported five-year housing land supply (Five Year Housing Land Supply Statement as at 31 March 2018 (November 2018) ('HLSS') is 4.1 years. This is predicated on a requirement which, when considered in relation to the latest guidance, understates need; and a supply which, again when considered in relation to latest guidance, overstates supply. As such, the actual housing land supply is noticeably less.
2.14. Looking at this in detail, the HLSS considers an annual need of 343 dwellings, resulting in a total requirement once the 20% has been applied of 2,058 dwellings. However, applying the latest guidance and the Standard Method, the Borough's housing requirement is 452 dwellings per annum. Applying the 20% buffer, this results in a five-year requirement of 2,712 dwellings.
2.15. In terms of supply, the HLSS includes sites without detailed planning permission and without evidence such sites will be delivered within five years. As per the Glossary contained within Annex 2 of the NPPF, such sites cannot be considerable deliverable for the purposes of the five-year housing land supply. Table 1 of the HLSS suggests that at least 1,042 dwellings in the reported supply did not have planning permission. Once these are removed from the supply calculation, the five-year supply comprises 653 dwellings. It is unclear if and how many of the dwellings categorised as having extant planning permission are on major sites which only benefit from outline permission. Such sites would also have to be discounted. As such, the figure of 653 dwellings may overstate housing supply.
2.16. A five-year supply of 653 dwellings compared to a requirement of 2,712 represents a 1.2-year housing land supply. This acute housing land supply shortage demonstrates the importance of allocating sites through the Local Plan which can delivery early in the plan period, and support the existing supply of housing. It also emphasises the need to avoid over-reliance on large strategic sites which inevitably take longer to deliver.
2.17. The housing trajectory provided as Appendix 1 to the PSLP projects that it will enable completion of 2,305 dwellings between 2019/20 and 2023/24.
2.18. Having regard to the Standard Method and the need to apply a 20% buffer to the housing requirement, the total five-year requirement for the Borough is 2,712 dwellings. Therefore, even before critical review of the supply, the PSLP will not provide a five-year supply of housing.
2.19. Furthermore, and in respect of the projected supply, we are concerned to note that Dunton Hills Garden Village is anticipated to deliver housing completions from 2022/23, falling within the first five years of the plan.
2.20. Dunton Hills Garden Village is a proposed major strategic development, intended to provide a new settlement supported by a range of facilities and infrastructure. Delivery will require the coordination and input of multiple landowners, developers, infrastructure providers and other stakeholders. Once allocated, the PSLP proposes a masterplan and design guidance will be required to be prepared to ensure that a cohesive approach is taken to the development of the Garden Village.
2.21. As such, it is a concern that 100 homes will be completed at Dunton Hills Garden Village as early as 2022/23. This does not in itself mean that Dunton Hills Garden Village proposals cannot form part of a sound Local Plan, but it does again demonstrate an inability to rely on large strategic sites for short term housing delivery, and emphasises the need for smaller sites to be supported by policies which will allow their short term delivery to ensure the Local Plan is sound.
Policy R16 & R17: Land off Doddinghurst Road
2.22. Policy R16 & R17 proposes the release of the site from the Green Belt and allocation for around 200 new homes. This approach is supported as an achievable and deliverable solution to contributing towards the Borough's housing land supply to meet the housing need requirement.
2.23. Having regard to the PSLP's housing trajectory, paragraph 9.160 the PSLP states the dwellings are anticipated to be delivered between 2023/24 and 2026/27. We do not support this assumption and object to the timing of the delivery of this site, as set out in the above mentioned paragraph and Appendix 1 of the PSLP. As the Council will be aware, representations have been made to earlier iterations of the emerging Local Plan to confirm the site is available, deliverable and achievable within the first five years of the plan period.
2.24. As currently proposed the trajectory is unsound in relation to this site, and as such is not justified. This is because the site can be delivered earlier than the stated timescales in Appendix 1 of the PSLP. In order to make the housing trajectory sound, amendments to the trajectory must be made to reflect the earlier delivery of the site in the plan period. The proposed amendments would result in a justified approach and a sound policy.
2.25. In addition to amending the housing trajectory to reflect the realistic and earlier delivery of the site, as proposed by a developer with an option on the land, the inclusion of the site within the first five years on the plan period will assist BBC with their five-year housing land supply position, not only assisting in housing delivery of the PSLP is effective and can be found sound at Examination.
Unit Numbers
2.26. Whilst we are supportive of the allocation, we raise concerns in relation to the wording of allocation policies such as Policy R16 & R17 should take this requirement for flexibility into account and worded as such to provide "at least 200 homes", as opposed to "around 200 homes". We consider that this would provide greater certainty on the number of homes to be delivered as part of each allocation for Brentwood Borough Council, and also allows for the delivery of additional units where appropriate opportunities may arise.
2.27. For sites R16 and R17, a significant amount of feasibility work has been undertaken to establish any site constraints, and as a result of this, Countryside are confident in the ability for the site to provide at least 250 homes. We have concerns that the respective policy's current format may be interpreted to confirm the optimum use of the site, rather than a lower limit. In fact, the 200-unit figure has been produced by Brentwood Borough Council with far less rationale and technical justification than has been undertaken by Countryside Properties and may lessen the ability of this site and other policies with similar wording to support Brentwood's need for a buffer and flexibility in their housing land supply.
Access
2.28. It is noted that there has been a change in wording of Part B (b) of Policy R16 & R17 from the November 2018 Proposed Submission Local Plan presented to Committee, and that now being consulted on (February 2019), with no explanation. The previous iteration of the policy required vehicular access to be provided from "Doddinghurst Road for both site and/or Karen Close and Russell Close". The current policy is worded to allow for vehicular access from Doddinghurst Road only.
2.29. Whilst access from Doddinghurst Road is accepted as the preferred strategy for all parties, initial appraisal work in this respect has recognised a potential requirement for significant levelling and land movement which could have implications on the viability of housing delivery on the site. It is therefore requested that the policy retains flexibility for the use of the other accesses from Karen Close and Russell Close as a worst case scenario, in the interests of protecting the deliverability of the southern parcel of the site, particularly as these routes of access have been previously agreed with Essex County Council Highways.
Policy SP03 Health Impact Assessments
2.30. The Policy requires planning applications for developments of 50 or more to be dwellings, non-residential development of 1,000sqm or more or schemes for C2 class developments to be supported by HIAs. The HBF response to this policy is unsupportive and they consider the policy to be unsound as it is not consistent with national policy and is ineffective.
2.31. We are in agreement with the HBF's response, dated 17th March 2019, in relation to the requirement for HIAs to be provided for 50 or more dwellings and consider the requirement to be unnecessary and an additional burden on applicants. Referring to the PPG we note that HIAs may be useful tools, however the PPG also expresses the importance of the local plan needing to consider the wider health issues in an area and ensuring the policies respond to these concerns. The guidance is provided below for completeness.
2.32. Paragraph: 002 Reference ID: 53-002-20140306 confirms that provision of the required health infrastructure should be supported and taken into account at local and neighbourhood plan making, and when determining planning applications.
2.33. Referring to National policy, paragraph 20 states that Strategic Policies should set out an overall strategy for the pattern, scale and quality of development, this includes infrastructure and community facilities.
2.34. In order for the local plan to be consistent with national policy, the Local Plan should already consider the impact of development on the health and wellbeing of the communities and any identified infrastructure should be addressed in policy. Therefore, whilst Countryside support the important consideration of health and wellbeing of communities where development is in line with the policies contained within the development plan a HIA should not be necessary. The requirement for a HIA should only be triggered where there is a departure from the plan, enabling the Council to assess any impacts on the health and well-being of the community as a result of said proposals.
Policy SP05 Construction Management
2.35. The Policy expects all major development schemes/developers to sign up to the Considerate Constructors Scheme, or equivalent. The scheme is a non-profit making, independent organisation which monitors construction sites signed up to the scheme, with the aim of managing and mitigating impacts arising from construction. This requirement is considered unjustified and inconsistent with national policy.
2.36. Whilst we recognise the importance of managing the potential impacts on construction sites, we consider this policy to be unsound because it is unjustified and not consistent with national policy. We would suggest that consideration for the scheme is best dealt with through planning applications and development management without it being written into formal planning policy.
2.37. We are not aware of any other adopted or emerging Local Plan which requires applicants and developers of major sites to enter into a specified construction management scheme and therefore question the reasonableness of this policy. The matter of construction management should be assessed on a case by case basis and should not be a matter for a strategic policy to prescribe. How a construction scheme is managed and mitigated should be an item for consideration by the decision taker and assessed on a case by case basis.
2.38. The imposition of Policy SP05 requires all major developments to be signed up to the Considerate Constructors Scheme regardless of the site or proposal details. It is recommended that this policy is removed.
Policy BE02 Sustainable Construction and Resource Efficiency
2.39. We consider the policy to be unsound as it is inconsistent with national policy. Part (f) of Policy BE02 requires the inclusion of renewable and decentralised energy as part of a new development, this is not consistent with national policy. Whilst Countryside recognise the importance of sustainable construction, a policy approach to such requirements does not allow for the appropriate flexibility in this regard, as recognised in the NPPF.
2.40. Paragraph 153 of the NPPF states that local plans can expect development to meet such provisions, however the NPPF also states that they are only required to comply with such policies where it is either feasible or viable. To ensure consistency with national policy part (f) of Policy BE02 should be amended to reflect this position.
Policy BE03 Carbon Reduction, Renewable Energy and Water Efficiency
2.41. It is Government policy to seek to deliver improvements to emissions from buildings through the building regulations regime. As such we do not consider it necessary to include the table at part (a) of this policy. Should a national zero carbon policy be introduced it will be achieved and applied through building regulations, as noted at paragraph 5.33.
2.42. We therefore echo those comments of the HBF's consultation response, dated 17th March 2019, and suggest that if the building regulations are updated then the Council should revisit the policy through a local plan review at that stage, but that such matters are dealt with through building regulations in the meantime to prevent unnecessary duplicate consideration of such matters through both planning and construction stages.
Policy BE04 Establishing Low Carbon and Renewable Energy Infrastructure Network
2.43. It is acknowledged that the Government support the transition to a low carbon future in a changing climate, including support towards renewable and low carbon energy and associated infrastructure. Countryside support these intentions.
2.44. Part (b) of Policy BE04 expects sites of over 500 dwellings, including where there are clusters of neighbouring sites that total over 500 units, shall incorporate decentralised energy infrastructure in line with a hierarchy however.
2.45. We raise concerns in relation to the deliverability of part (b) of the policy in relation to sites within a cluster of 500 or more dwellings given that neighbouring sites will not necessary come forward by multiple landowners and developers at similar times. The coordinating and implementation of a heat network to serve smaller scale sites as separate applications but adjacent to other similar sized sites in the locality, is unreasonable and unjustified and could result in a delay in delivery of new homes, resulting in an ineffective local plan.
2.46. It is recommended that the requirement for new development located where 'clusters' of neighbouring sites totals over 500 units should be removed from the policy in order to make the policy effective.
Policy BE10 Connecting New Developments to Digital Infrastructure
2.47. It is Government policy to support the expansion of electronic communications networks. However, we would draw the Council's attention to the Written Ministerial Statement, 25th March 2015, which announced that local planning authorities preparing Local Plans, "should not set any additional standards or requirements relating to the construction, internal layout or performance of new dwellings."
2.48. The Local Planning Authority are only allowed to adopt the three optional technical standards, in relation to construction, internal layout and performance, subject to evidenced need and viability. As such, the Council should not seek higher standards than Building Regulations, as already referred to in our response to Policy BE03. Therefore, Policy BE10 is considered unsound because it is unjustified and contrary to national policy.
2.49. We are also unaware of National Policy requiring benches and bins to be connected to mobile digital infrastructure. As such the policy is unjustified and contrary to national policy.
2.50. Countryside are committed to ensuring that all developments go as far as is practical to meet national intentions to ensure the quality, practicality and future-proofing of new housing developments. We have concerns however that by introducing a wealth of additional planning policies in these areas, there will be unnecessary duplication to building regulations, and potentially delays to planning applications which will in turn impact on the timely delivery of new homes.
3. Site Deliverability
3.1. The site represents a deliverable, sustainable and achievable site for residential development. A number of technical reports and associated documents have been completed which demonstrate this. The below section provides a summary of these documents.
Density Study
3.2. A Density Study (January 2018) has been undertaken by JTP Architects.
3.3. As per Paragraph 2.23 of this representation, the Preferred Site Allocations Document (January 2018) states that the indicative dwelling yield of the site is 200 dwellings.
3.4. The Density Study confirms that the total site area is 8.02ha and the total developable area is 6.17ha. Furthermore, it confirms that the site can accommodate up to 250 dwellings with 180 dwellings on Site 023A and 40 dwellings on parcel 023B, which results in 40 dwellings per hectare and 25 dwellings per hectare, respectively.
3.5. The Density Study also provides a Developable Area Plan which illustrates the developable area, the existing trees and root protections areas (RPA), the easements and attenuation and drainage. The plan proposed that the most significant existing trees and foliage are retained.
3.6. Furthermore, the Study characterises the existing landscape features of Site 023A as three naturally formed developable areas. This natural formation will enable an orthogonal street pattern and regular frontage and a more efficient layout of a potentially higher density.
3.7. The study characterises Site 023B as a more irregular shape due to the present underground services. Furthermore, the Density Study identifies that the site has more constrained access opportunities. This has led to a more organic layout of a potentially lower density.
3.8. Given the evidence in the Density Study, the site could accommodate up to 250 dwellings. Further detail on how the site could present a sustainable development opportunity can be found in the summaries below.
Air Quality
3.9. An Air Quality Assessment was undertaken by Ardent Consulting Engineers in February 2017. The assessment reviews air quality constraints affecting the site.
3.10. The assessment concludes that it is unlikely that the proposed development will be considered high risk in terms of construction impacts. It also suggests that there has been a general improvement in local air quality over recent years which is evidenced by the monitored concentrations which are detailed within the report. Nevertheless, the assessment recommends that mitigation measures may need to be adopted as part of the development and be further considered in due course.
3.11. The assessment recommends that the impact of any potential increase in traffic flow on the local road network should be determined by way of a detailed air quality assessment.
3.12. Given the proximity of the A12, there is the potential for the introduction of a new exposure adjacent to the A12. This is dependent on the distance between individual units and the A12 which is to be addressed through careful design by the Architects.
Archaeology
3.13. An Archaeological Desk Based Assessment was undertaken by CGMS Consulting in November 2014.
3.14. The assessment confirms that the site does not lie within an area of archaeological priority, as previously designated by Brentwood Borough Council. It confirms that the site can be considered to have a modest potential for the late prehistoric.
3.15. The assessment also confirms that the site has remained undeveloped land through its documented history.
3.16. The assessment anticipates that Essex County Council archaeological advisors may request additional archaeological mitigation measures, initially in the form of a geophysical survey.
Desktop Noise Report
3.17. A Desktop Noise Report was completed by Ardent Consulting Engineers in March 2016.
3.18. The Noise Report concludes that subject to appropriate mitigation measures, the proposed internal and external areas of the proposed development could be demonstrated to be within desirable noise levels, subject to a detailed assessment.
3.19. The report states that ambient vibration levels may be a concern due to the sites proximity to the A12. These will need to be further addressed during more detailed assessment works.
3.20. Furthermore, a Noise Feasibility Plan has also been produced by Ardent Consulting Engineers. The plan provides a number of layout recommendations for Glazing, Ventilation, Rear Gardens and Balconies and Standalone Barriers. The Noise Feasibility Plan also outlines the closest possible building line on site which has reasonable attenuation and the recommended approximate minimum effective extent of an acoustic barrier. The plan also provides dimensions between the site and the nearest channel of the A12.
Drainage Strategy
3.21. A Drainage Strategy Technical Note was produced by Ardent Consulting Engineers in 2016. The note confirms that existing foul and surface water sewers navigate the site, together with a number of watercourses which will continue to serve the site, post development.
3.22. The report also confirms that the site is within Flood Zone 1 and is therefore suitable for residential development. The note suggests that subject to further investigation and detailed design, a Flood Risk Assessment and Detailed Drainage Strategy can be prepared to support a successful planning application for the development.
Phase 1 Habitat Survey
3.23. A Phase 1 Habitat Survey was produced by SES in 2014. The survey concluded that the habitats on site have the potential to be of value to protected species, as well as being of general biodiversity value themselves. As a result, the Phase 1 Habitat Survey recommends that the following works are undertaken;
* Reptiles (presence/likely absence survey - northern site only);
* Badgers (monitoring of setts on site);
* Bats (tree inspection surveys, activity surveys);
* Breeding Bird (walkover survey during breeding bird season, generally March to August); and
* Invertebrates (walkover survey to establish value for rate and vulnerable beetles).
3.24. It is considered within the survey that any potential adverse impacts from the proposed development upon specific protected species will be able to be wholly mitigated for with careful design.
Social Infrastructure Review
3.25. A Social Infrastructure Review was produced by Quod in February 2017. The review looked to provide an assessment of the likely impact of the development of the site on the demand for school places and healthcare provision.
3.26. The review confirms that based on average household sizes for the area, it is anticipated that the site could accommodate a resident population of approximately 600 people and generate demand for 68 primary school places and 45 secondary school places.
3.27. In line with this estimated growth, the review provides a summary of the education and healthcare provision within Brentwood.
3.28. The review states that although a number of existing primary schools in the Brentwood urban area are being expanded or are due to be expanded, Essex County Council is still expecting to be facing a deficit of places by 2020/21, with the Preferred Site Allocations Document stating that there is an estimated deficit of 541 places by 2021/2022 for Primary Schools. In terms of Secondary School Provision, the Preferred Site Allocations document states that there will be an estimated deficit of 9 places by 2021/22.
3.29. In terms of healthcare provision, the report confirms that the capacity to absorb additional demand arising from developments in the Brentwood Urban Area is limited. The Preferred Site Allocations document confirms this and states that there is likely to be significant pressures on GP Surgeries due to housing growth in the Borough throughout the lifetime of the plan.
Transport
3.30. A Transport Technical Note was prepared by Ardent Consulting Engineers in January 2018. The technical note provides an initial review of the anticipated highway and transportation impacts, based on a potential development of up to 250 dwellings at the site.
3.31. The note confirms that vehicular access to the site could be provided from Doddinghurst Road for the 23A of the site and provided via the extension of Karen Close and Russell Close at the 23B parcel.
3.32. In response to local concerns regarding the suitability of existing public transport provision, the note suggests that the site could generate an additional 7 peak hour bus trips and 35 peak hour rail trips. It is considered that there is sufficient capacity to accommodate these trips. The note confirms that there does not appear to be any specific issues relating to public transport.
3.33. The technical note confirms that the impacts on surrounding roads including Doddinghurst Road and Ongar Road would not be severe and should not be a reason for the site not to be allocated.
3.34. The note confirms that there are no highways issues that would prevent the site from being allocated for residential development in the emerging Local Development Plan.
3.35. The above studies demonstrate that the site is deliverable and sustainable.