9.209
Object
Brentwood Local Plan 2016 - 2033 (Pre-Submission, Regulation 19)
Representation ID: 22498
Received: 18/03/2019
Respondent: Essex County Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Currently it is unclear how access to the site can be achieved directly from J29 of the M25 as a consequence of the Lower Thames Crossing improvements to this junction, which includes a segregated left turn slip road from the A127 to M25 southbound. BBC therefore need to demonstrate that suitable access arrangements for all modes of travel can be achieved, including appropriate mitigation/improvements. BBC should also demonstrate what discussions have taken place with Highways England, ECC as Highway Authority, and the site promoter to ensure that access arrangements are deliverable and agreed.
BBC need to demonstrate that suitable access arrangements for all modes of travel can be achieved, including appropriate mitigation/improvements.
1. Positively prepared.
2. Justified.
3. Effective.
4. Consistent with National Policy.
Currently it is unclear how access to the site can be achieved directly from J29 of the M25 as a consequence of the Lower Thames Crossing improvements to this junction, which includes a segregated left turn slip road from the A127 to M25 southbound. BBC therefore need to demonstrate that suitable access arrangements for all modes of travel can be achieved, including appropriate mitigation/improvements. BBC should also demonstrate what discussions have taken place with Highways England, ECC as Highway Authority, and the site promoter to ensure that access arrangements are deliverable and agreed.