032 Land east of Nags Head Lane, Brentwood

Showing comments and forms 1 to 7 of 7

Object

Draft Local Plan

Representation ID: 13307

Received: 11/02/2016

Respondent: Mr Terry Orford

Representation Summary:

Object to any proposal to build on Green Belt land including site 032.

Full text:

I would like to object to any proposal to build on green belt land.
Numbered in your draft plan as 022, 023,032, 034,087 235 and 079A.
I object to any proposal to build on green belt land within the borough.

Attachments:

Object

Draft Local Plan

Representation ID: 13928

Received: 07/04/2016

Respondent: Mr Matthhew Bennett

Representation Summary:

Concern regarding destruction of green belt and on the future impact of local services and infrastructure of new development. Local school over subscribed and doctors appointment requires three week delay the Beechwood surgery. Train station 30+ mins walk from. Difficult to see how proposals meet with the councils 'vision'. Increased urban sprawl closer to Havering, with limited infrastructure outside the proposed housing.

Full text:

This is in relation to the plan for two significant developments on green belt land on/near South Weald -
i) Nags Head Lane approx 120+ homes and
ii) Honeypot Lane for upto 250 homes
I found this news quite concerning, not only for the destruction of green belt but also on the future impact of local services and infrastructure within the area that an additional 370 families would bring. As you will no doubt be aware the local school is significantly over subscribed and a doctors appointment already requires a three week wait time at the Beechwood surgery. Not to mention the distance to the train station of 30+ mins walk from Nags Head Lane, it is difficult to see how these proposals meet with the councils 'vision' as outlined in the plan. Particularly when taking into consideration the increased urban sprawl the Nags Head lane development would bring as urban development is further entrenched closer to the M25/A12 and the London Borough of Havering with limited infrastructure outside the proposed housing.
In addition, at one point the Plan seems to contradict itself in 5.34 where it is clearly stated development opportunities are limited within smaller villages and no amendment is proposed to the Green Belt boundaries of the small villages. South Weald is listed as a smaller village in Settlement Category 4 and it is difficult to see that an extra 370 homes within the parish would not constitute significant development.

Object

Draft Local Plan

Representation ID: 13929

Received: 07/04/2016

Respondent: Mr Matthhew Bennett

Representation Summary:

Plan seems to contradict itself in 5.34 stated development opportunities are limited within smaller villages and no amendment is proposed to the Green Belt boundaries of the small villages. South Weald is listed as a smaller village in Settlement Category 4 and it is difficult to see that an extra 370 homes within the parish would not constitute significant development.

Full text:

This is in relation to the plan for two significant developments on green belt land on/near South Weald -
i) Nags Head Lane approx 120+ homes and
ii) Honeypot Lane for upto 250 homes
I found this news quite concerning, not only for the destruction of green belt but also on the future impact of local services and infrastructure within the area that an additional 370 families would bring. As you will no doubt be aware the local school is significantly over subscribed and a doctors appointment already requires a three week wait time at the Beechwood surgery. Not to mention the distance to the train station of 30+ mins walk from Nags Head Lane, it is difficult to see how these proposals meet with the councils 'vision' as outlined in the plan. Particularly when taking into consideration the increased urban sprawl the Nags Head lane development would bring as urban development is further entrenched closer to the M25/A12 and the London Borough of Havering with limited infrastructure outside the proposed housing.
In addition, at one point the Plan seems to contradict itself in 5.34 where it is clearly stated development opportunities are limited within smaller villages and no amendment is proposed to the Green Belt boundaries of the small villages. South Weald is listed as a smaller village in Settlement Category 4 and it is difficult to see that an extra 370 homes within the parish would not constitute significant development.

Comment

Draft Local Plan

Representation ID: 14049

Received: 11/04/2016

Respondent: National Grid UK

Representation Summary:

site 032 Nags Head Lane has been identified as being crossed by or within close proximity to high pressure gas transmission apparatus. Local authorities have a statutory duty to consider applications for development in the vicinity of high pressure (above 7 bar) pipelines and to advise the developer on whether the development should be allowed on safety grounds on rules provided by HSE. This advice is provided by the HSE Planning Advice for Development near to Hazardous Installations (PADHI) process. The relevant HSE guidance can be accessed via the following link:
http://www.hse.gov.uk/landuseplanning/padhi.pdf

Full text:

See attached.

Attachments:

Comment

Draft Local Plan

Representation ID: 15464

Received: 22/03/2016

Respondent: Thames Water

Agent: Savills UK

Representation Summary:

On the information available to date we do not envisage infrastructure concerns regarding wastewater infrastructure capability in relation to this site.

Full text:

Draft Local Plan Consultation - January 2016

Thank you for consulting Thames Water on the above document. Thames Water are the statutory sewerage undertaker for the western areas of the Borough and the statutory water undertaker for a small area of the Borough and are hence a "specific consultation body" in accordance with the Town & Country Planning (Local Planning) Regulations 2012.

Policy 10.13: Flood Risk

Thames Water fully support Policy 10.13 on flood risk and in particular requirement (e) for development to avoid flood risk by:

"(e) demonstrating that the applicant has contacted the sewerage provider to identify whether the sewerage network has adequate capacity both on and off site to serve the development and to assess the need to contribute to any additional off site connections
for the development. Where capacity is identified as insufficient, development will only be permitted if it is demonstrated that improvements will be completed prior to occupation of the development."

Development of sewerage infrastructure cannot be delivered through CIL or S106 contributions approach covered by Policy 10.7. As such Thames Water consider that this policy is necessary to ensure that any infrastructure upgrades required to the sewerage network are delivered ahead of the occupation of development.

To ensure that there is clarity over the requirements of the policy the following additional supporting text could be included:

"The Local Planning Authority will seek to ensure that there is adequate wastewater infrastructure to serve all new developments. Developers will be required to demonstrate that there is adequate capacity both on and off the site to serve the development and that it would not lead to adverse amenity impacts for existing or future users in the form of internal and external sewer flooding or pollution of land and water courses.

In some circumstances this may make it necessary for developers to carry out appropriate appraisals and reports to ascertain whether the proposed development will lead to overloading of existing waste water infrastructure. Where there is a capacity constraint the Local Planning Authority should require the developer to provide detailed drainage strategy informing what infrastructure is required, where, when and how it will be delivered."

Policy 10.14: Sustainable Drainage

Thames Water fully support policy 10.14 on sustainable drainage. Thames Water will seek to ensure that SuDS are prioritised and implemented for developments of all sizes, and support policies on surface water flow reduction from brownfield sites that will ease pressure on the sewer network regardless of the size of the development and type of SuDS implemented.

Recognising that SuDS are only one of a number of competing considerations for developers when drafting their designs, and for local planning authorities when determining applications, we have reviewed the approach we take with local planning authorities and developers. We aim to:

- Engage with developers, local planning authorities and lead local flood authorities at the earliest possible opportunity when a development is known to be likely, working collaboratively wherever possible to ensure sewer flood risk is taken into account from the outset. This will help all parties understand the extent of any work needed before a development can proceed, and the costs.

- Provide local planning authorities with clear advice; proactively highlighting areas where foul water and surface water from new developments would pose an increased risk of floods from sewers, so that the impact of new developments is reflected in planning decisions.

- Adopt a more proactive approach by designing, funding, building, adopting and maintaining SuDS ourselves, in some circumstances with contributions from other parties where appropriate to make the scheme viable.

A copy of our policy on SuDS is attached for information.

Site Specific Comments

On the basis of the information contained within the draft Local Plan in relation to site allocations Thames Water has reviewed the potential impacts on existing infrastructure. Comments on the sites are attached to this response. The impact of development on wastewater infrastructure will also depend on the timing of delivery and point of connection to the network together with development elsewhere within the catchment.

In order to ensure that the water supply and drainage requirements of development proposals are understood and that any upgrade requirements are identified, all developers should be encouraged to contact Thames Water Developer Services in advance of the submission of planning applications.
Thames Water recommend that developers engage with them at the earliest opportunity to establish the following:

* The developments demand for water supply infrastructure both on and off site and can it be met;
* The developments demand for wastewater infrastructure both on and off site and can it be met; and
* The surface water drainage requirements and flood risk of the development both on and off site and can it be met.

Site ID: 50155
Site Name: 001A & 001B - Land North Of Highwood Close including St Georges Court
Waste Response: We have concerns regarding Wastewater Services in relation to this site. Specifically, the wastewater network capacity in this area is unlikely to be able to support the demand anticipated from this development. Upgrades to the existing drainage infrastructure are likely to be required to ensure sufficient capacity is brought forward ahead of the development. Where there is a capacity constraint the Local Planning Authority should require the developer to provide a detailed drainage strategy informing what infrastructure is required, where, when and how it will be delivered. At the time planning permission is sought for development at this site we are also highly likely to request an appropriately worded planning condition to ensure the recommendations of the strategy are implemented ahead of occupation of the development. It is important not to under estimate the time required to deliver necessary infrastructure. For example: local network upgrades can take around 18 months to 3 years to design and deliver.

Site ID: 37055
Site Name: 003 - Wates Way Industrial Estate, Ongar Road, Brentwood
Waste Response: We have concerns regarding Wastewater Services in relation to this site. Specifically, the wastewater network capacity in this area is unlikely to be able to support the demand anticipated from this development. Upgrades to the existing drainage infrastructure are likely to be required to ensure sufficient capacity is brought forward ahead of the development. Where there is a capacity constraint the Local Planning Authority should require the developer to provide a detailed drainage strategy informing what infrastructure is required, where, when and how it will be delivered. At the time planning permission is sought for development at this site we are also highly likely to request an appropriately worded planning condition to ensure the recommendations of the strategy are implemented ahead of occupation of the development. It is important not to under estimate the time required to deliver necessary infrastructure. For example: local network upgrades can take around 18 months to 3 years to design and deliver.

Site ID: 37063
Site Name: 013B - Warley Training Centre, Essex Way, Warley
Waste Response: We have concerns regarding Wastewater Services in relation to this site. Specifically, the wastewater network capacity in this area is unlikely to be able to support the demand anticipated from this development. Upgrades to the existing drainage infrastructure are likely to be required to ensure sufficient capacity is brought forward ahead of the development. Where there is a capacity constraint the Local Planning Authority should require the developer to provide a detailed drainage strategy informing what infrastructure is required, where, when and how it will be delivered. At the time planning permission is sought for development at this site we are also highly likely to request an appropriately worded planning condition to ensure the recommendations of the strategy are implemented ahead of occupation of the development. It is important not to under estimate the time required to deliver necessary infrastructure. For example: local network upgrades can take around 18 months to 3 years to design and deliver.

Site ID: 48737
Site Name: 022 - Land At Honeypot Lane, Brentwood
Waste Response: We have concerns regarding Wastewater Services in relation to this site. Specifically, the wastewater network capacity in this area is unlikely to be able to support the demand anticipated from this development. Upgrades to the existing drainage infrastructure are likely to be required to ensure sufficient capacity is brought forward ahead of the development. Where there is a capacity constraint the Local Planning Authority should require the developer to provide a detailed drainage strategy informing what infrastructure is required, where, when and how it will be delivered. At the time planning permission is sought for development at this site we are also highly likely to request an appropriately worded planning condition to ensure the recommendations of the strategy are implemented ahead of occupation of the development. It is important not to under estimate the time required to deliver necessary infrastructure. For example: local network upgrades can take around 18 months to 3 years to design and deliver.

Site ID: 50159
Site Name: 032 - Land East Of Nags Head Lane, Brentwood
Waste Response: On the information available to date we do not envisage infrastructure concerns regarding wastewater infrastructure capability in relation to this site.

Site ID: 37064
Site Name: 039 - Westbury Road Car Park, Westbury Road, Brentwood
Waste Response: On the information available to date we do not envisage infrastructure concerns regarding wastewater infrastructure capability in relation to this site.

Site ID: 37065
Site Name: 040 - Chatham Way/Crown Street Car Park, Brentwood
Waste Response: On the information available to date we do not envisage infrastructure concerns regarding wastewater infrastructure capability in relation to this site.

Site ID: 37067
Site Name: 041 - Land at Hunter House, Western Road, Brentwood
Waste Response: On the information available to date we do not envisage infrastructure concerns regarding wastewater infrastructure capability in relation to this site.

Site ID: 50156
Site Name: 044 & 178 - Land At Priests Lane, Brentwood
Waste Response: We have concerns regarding Wastewater Services in relation to this site. Specifically, the wastewater network capacity in this area is unlikely to be able to support the demand anticipated from this development. Upgrades to the existing drainage infrastructure are likely to be required to ensure sufficient capacity is brought forward ahead of the development. Where there is a capacity constraint the Local Planning Authority should require the developer to provide a detailed drainage strategy informing what infrastructure is required, where, when and how it will be delivered. At the time planning permission is sought for development at this site we are also highly likely to request an appropriately worded planning condition to ensure the recommendations of the strategy are implemented ahead of occupation of the development. It is important not to under estimate the time required to deliver necessary infrastructure. For example: local network upgrades can take around 18 months to 3 years to design and deliver.

Site ID: 50158
Site Name: 099 - Victoria Court, Victoria Road, Brentwood
Waste Response: On the information available to date we do not envisage infrastructure concerns regarding wastewater infrastructure capability in relation to this site.

Site ID: 37077
Site Name: 100 - Baytree Centre, Brentwood
Waste Response: We have concerns regarding Wastewater Services in relation to this site. Specifically, the wastewater network capacity in this area is unlikely to be able to support the demand anticipated from this development. Upgrades to the existing drainage infrastructure are likely to be required to ensure sufficient capacity is brought forward ahead of the development. Where there is a capacity constraint the Local Planning Authority should require the developer to provide a detailed drainage strategy informing what infrastructure is required, where, when and how it will be delivered. At the time planning permission is sought for development at this site we are also highly likely to request an appropriately worded planning condition to ensure the recommendations of the strategy are implemented ahead of occupation of the development. It is important not to under estimate the time required to deliver necessary infrastructure. For example: local network upgrades can take around 18 months to 3 years to design and deliver.

Attachments:

Comment

Draft Local Plan

Representation ID: 15843

Received: 11/05/2016

Respondent: Essex County Council

Representation Summary:

ECC has undertaken a high level assessment of the proposed sites identified in Figure 7.2 - Housing Land Allocations. Results for site:
Within Fooding Hotspot: No
Within EA UFMfSW: No
Number of Properties at Risk: N/A
The adopted SuDs Design Guide should be used with regards to appropriate standards for mitigation measures.

Full text:

See attached

Attachments:

Support

Draft Local Plan

Representation ID: 16155

Received: 16/05/2016

Respondent: Crest Nicholson

Agent: Bidwells

Representation Summary:

We support the proposed allocation of site 032 - land east of Nag's Head Lane for 150 dwellings. The site is wholly in accordance with the spatial strategy, the site selection criteria and the Sustainability Appraisal, in particular because: - It is highly accessible - Defendable Green Belt boundaries - It is highly sustainable - It would balance the strategic growth of Brentwood town providing much needed residential development at this western gateway location - No significant ecological constraints -Low Flood Risk - No significant noise constraints - It would provide significant planning benefits - Early delivery would be ensured.

Full text:

See attached.

Attachments: