Comment

Strategic Growth Options

Representation ID: 7146

Received: 17/02/2015

Respondent: Mrs Nicola McNicol

Representation Summary:

All the infrastructure needs identified are absolutely essential and must be fully addressed before development is planned. Given the scale of development proposed within the A127 Corridor, whilst there will be priorities, the development will require infrastructure spending across all
categories (education, healthcare, transport, green space, community facilities etc.). Failure to provide any one element of this infrastructure will have a materially negative impact on both existing residents, and the new development. As such, whilst there may be priorities in areas where development is expected to be lower/less significant, in areas expected to see high levels of development, a holistic infrastructure plan needs to be delivered to ensure the development is undertaken in a sustainable manner.

Full text:

see attached

Attachments: