Comment

Strategic Growth Options

Representation ID: 6275

Received: 17/02/2015

Respondent: Maylands Green Estate Co. Ltd

Agent: JTS Partnership LLP

Representation Summary:

The growth figure of 5,500 dwellings for the next 15 years is supported, however it is considered optimistic that 2,500 dwellings will come from the brownfield sites within the urban area.

Green Belt land will therefore have to be released to meet the objectively assessed need. Recommended that a detailed review of Green Belt boundaries is undertaken. There are a number of anomalies in the Green Belt boundaries (e.g. cutting across middle of residential cartilage) that should be corrected.

The Green Belt boundary should be established on a strong defensible line (e.g. river, road or railway). The Green Belt boundary should exclude the whole residential cartilage of existing residential development (except where the Green Belt covers the entire village).
To minimise the overall impact on the Green Belt the Council should follow a hierarchical approach to identifying land to meet residential need, along the following lines:

1. Existing urban areas
2. Existing developed sites in Green Belt
3. Review of Green Belt boundaries to ensure consistency with para 84 and 85 NPPG guidance. Boundaries to follow clear, recognisable, physical features and Green Belt not to include land which is unnecessary to keep open (such as land surrounded by development or which is part of a village).
4. Release of sites on the edge of existing settlements.
5. New settlements (Dutton Garden Suburb).

Full text:

Q1: Yes - The Borough logically splits itself into three identified areas, which are of different character. The Borough contains two main infrastructure corridors, with more rural villages to the north and each area provides different development opportunities. The growth figure of 5,500 dwellings for the next 15 years is supported, however it is considered optimistic that 2,500 dwellings will come from the brownfield sites within the urban area.

Q2: Yes - These representations concern the area to the north of Brentwood and it is considered that the issues raised in regard to this area are correct.

Q3: Yes - As stated within Question 1, the growth figure of 5,500 dwellings for the next 15 years is supported, however it is considered optimistic that 2,500 dwellings will come from the brownfield sites within the urban area.

It is evident therefore, that some Green Belt land will have to be released in order to meet the objectively assessed target. As a result, it is recommended that a detailed review of Green Belt boundaries is undertaken. Over the years a number of anomalies have been created by inept drawing of the Green Belt boundaries. There are quite a few examples, for instance, of the Green Belt boundary cutting across the middle of a residential curtilage or wrapping around a single site. This makes no sense at all, and should be corrected.

The Green Belt boundary should be established on a strong defensible line. This should be a clearly defined and reasonably permanent physical feature in the landscape, such as a river, road or railway. Drawing the boundary across the middle of fields or gardens is totally unsatisfactory and even field boundaries may not be sufficiently permanent to form a reliable long-term boundary. At the very least, the Green Belt boundary should exclude existing residential development (except, where acknowledged, the Green Belt 'washes over' the entire village) and this exclusion must extend to the whole of the residential curtilage. What is required is not a straight line but a clearly defined and readily defensible boundary.

The Council should follow a hierarchical approach to identifying land to meet residential need, along the following lines:
1. Existing urban areas
2. Existing developed sites in Green Belt
3. Review of Green Belt boundaries to ensure consistency with para 84 and 85 NPPG guidance. Boundaries to follow clear, recognisable, physical features and Green Belt not to include land which is unnecessary to keep open (such as land surrounded by development or which is part of a village).
4. Release of sites on the edge of existing settlements.
5. New settlements (Dutton Garden Suburb).

It is only by following a hierarchical approach, and analysing the impact of the Green Belt at each stage, that the Council can assure itself that the overall impact of the Green Belt will be minimised.

If this analysis justifies the release of the Dutton Garden Suburb then (for the reasons that we indicate in the following question) it is very unlikely that it will make any contribution to current 5 year housing supply or that will be built out in this Local Plan period. It is an allocation that will cover two Local Plan periods and the Council will therefore need to allocate additional land in this Local Plan.
We would like as part of this submission to confirm support for the allocation of the land to the south of #, Mascalls Lane, Great Warley (see attached Site Location Plan). The site would fall within criteria 3 of the above approach to identifying land.

Q4: The focus of this submission is centred on the A12 Corridor. However, proposals for development at West Horndon are supported, in principle. Questions continue to be raised regarding viability, sustainability and deliverability of these sites and whether there is sufficient evidence to demonstrate that they could come forward within the plan period. Representations will be made separately to the Dunton Garden Suburb Consultation; however it is considered that this development fails in four of the five purposes of the Green Belt (Paragraph 80 of the NPPF). Such a suburb would: -
* Encourage the sprawl of large built-up areas (Basildon/Laindon);
* Potentially merge Laindon with East Horndon and West Horndon. Laindon itself is already merged with Basildon
* Further encroaches upon the countryside, creating a continuous stretch of development on the southern side of the A127, running from Nevendon to the A128.
* Failing to encourage the recycling of derelict and other urban land.

Questions are also raised over the deliverability of The Dunton Garden Suburb. Basildon Borough Council's Local Plan process has been set back, with the Council not expecting adoption until late 2018. Brentwood Borough Council will not be able to adopt their cross-boundary Development Plan Document until it is agreed and adopted by Basildon Borough Council. The proposals do not provide sufficient detail to demonstrate the deliverability of such a scheme and whether there is reasonable prospect of the full delivery of 2,500 dwellings within the 15 year period.

Q5: Yes - As part of the review of the existing Green Belt boundaries, development on sites on the edge of urban areas within the A12 corridor is supported.

Q6: It is questioned as to the extent of brownfield land available within villages. Given currently Green Belt restrictions, most of that land which was previously in brownfield use is likely to have been considered for development (under Paragraph 89 of the NPPF, an exception to inappropriate development is the partial or complete redevelopment of previously developed sites (brownfield land), whether redundant or in continuing use (excluding temporary buildings), which would not have a greater impact on the openness of the Green Belt). The brownfield land that is available within the Green Belt is generally found in more unsustainable locations outside of village boundaries. As a result, it is considered that, if in more suitable locations, Greenfield sites on the edge of villages should be considered.

Q7: Yes - No further comment.

Q8: Yes - No further comment.

Q9: Yes - No further comment.

Q12: Yes - No further comment.

Q13: No comment.

Attachments: