Object
Schedule of Potential Main Modifications
Representation ID: 30593
Received: 06/12/2021
Respondent: Mrs Sylvia Pascoe
Legally compliant? Not specified
Sound? No
Representation Summary:
The proposal is unsound because it has not taken into consideration the feelings and views of the current local population on things such as:
- Flooding, because their will be more pressure on the current sewage network (that already needs repairing).
Full text:
See attached representation