Object

Schedule of Potential Main Modifications

Representation ID: 30593

Received: 06/12/2021

Respondent: Mrs Sylvia Pascoe

Legally compliant? Not specified

Sound? No

Representation Summary:

The proposal is unsound because it has not taken into consideration the feelings and views of the current local population on things such as:
- Flooding, because their will be more pressure on the current sewage network (that already needs repairing).

Full text:

See attached representation

Attachments: