Object

Schedule of Potential Main Modifications

Representation ID: 30436

Received: 03/12/2021

Respondent: Mr Malcolm Hurford

Legally compliant? Not specified

Sound? No

Representation Summary:

The flood risk in Blackmore seems to be underestimated and ignored by the authority, they are failing to acknowledge the increased risk to the village of the two proposed sites which are also uphill from existing dwellings which will likely cause increased surface water flowing and the resultant flooding in and around the village.

Full text:

See attached representation

Attachments: