Object
Schedule of Potential Main Modifications
Representation ID: 30436
Received: 03/12/2021
Respondent: Mr Malcolm Hurford
Legally compliant? Not specified
Sound? No
Representation Summary:
The flood risk in Blackmore seems to be underestimated and ignored by the authority, they are failing to acknowledge the increased risk to the village of the two proposed sites which are also uphill from existing dwellings which will likely cause increased surface water flowing and the resultant flooding in and around the village.
Full text:
See attached representation