Object

Schedule of Potential Main Modifications

Representation ID: 30169

Received: 30/11/2021

Respondent: Mr Peter Mills

Legally compliant? Not specified

Sound? No

Representation Summary:

Blackmore village is low lying from the surrounding land and historically, during extreme torrential rain, the excess run-off of water naturally courses its way cascading through Blackmore Road, The Green and Church Street. Existing drainage and sewers do not cope. It is known. The sump from which sewage is pumped to the treatment site is designed to over flow the excess water/effluent by pipe to the River Wid south of Jericho Priory. The proposed additional housing is likely to overload the drainage/sewer network, unfit for purpose.

Full text:

See attached representation

Attachments: