Object

Schedule of Potential Main Modifications

Representation ID: 29745

Received: 11/11/2021

Respondent: Dr Murray Wood

Legally compliant? Yes

Sound? No

Representation Summary:

R25 and R26 are Greenbelt. The exceptional circumstances tests for building on Greenbelt have not been satisfied. Blackmore is remote, does not have adequate local public transport (buses), is a distance from the nearest train stations, and the roads that serve the village are narrow (often single) lanes. This modification is unsound on the basis that it unjustifiably releases Greenbelt, and is not positively prepared.

Full text:

R25 and R26 are Greenbelt. The exceptional circumstances tests for building on Greenbelt have not been satisfied. Blackmore is remote, does not have adequate local public transport (buses), is a distance from the nearest train stations, and the roads that serve the village are narrow (often single) lanes. This modification is unsound on the basis that it unjustifiably releases Greenbelt, and is not positively prepared.