Object
Schedule of Potential Main Modifications
Representation ID: 29494
Received: 03/11/2021
Respondent: Mr Richard Thwaite
Legally compliant? No
Sound? No
Representation Summary:
If 'great weight will given to the preservation of a designated heritage asset and its setting' then how can building on sites R25 and R26 be allowed, as they will further increase the flood risk to the grade I listed church in the conservation area that is less than 500 m away from those sites.
Full text:
If 'great weight will given to the preservation of a designated heritage asset and its setting' then how can building on sites R25 and R26 be allowed, as they will further increase the flood risk to the grade I listed church in the conservation area that is less than 500 m away from those sites.