Comment

Preferred Site Allocations 2018

Representation ID: 20052

Received: 05/03/2018

Respondent: National Highways

Representation Summary:

Junction capacity assessments of the SRN have not been presented within the Modelling Report, despite experiencing significant increases in trips at the junction as a result of development. It is recommended these are undertaken to determine the predicted operation of the junctions following LP development and to determine what measures may be required to mitigate the impact. Consideration may also need to be given to undertaking merge/diverge assessments at various locations to determine whether changes are required to support the LP development.

Full text:

See attached.

Attachments: